| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC 00 MUKUNDPUR PAHO DOMANPUR MUKUNDPUR PAHO MIRZAPUR UTTAR PRADESH 231306 | MIRZAPUR | UTTAR PRADESH | 231306 | L1 | Accepted-AOC LOWEST QUOTED RATE | |
| 2 | L2₹4.3 L+₹16,207.30 (3.88%)Rejected-Finance CENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER E M DEPARTMENT SAUNDA D BARKA SAYAL AREA | BOKARO | JHARKHAND | 825102 | L2 | Rejected-Finance REJECTED | |
| 3 | Rejected-Technical AT ARGADA DISTT RAMGARH JHARKHAND | - | Rejected-Technical rjected |
| Sl No | Description | Qty | Unit | M/S ADITYA ENTERPRISES L1 | coalfields engineering works L2 |
|---|---|---|---|---|---|
| 1.00 | (160 KVA, 11KV/440V Transformer) Cost of Copper Wire with DPC Covering including labour cost, insulation cost with less scrap for i) | 125 | Kg. | 990 ₹1,23,750 Lowest | 1,008 ₹1,26,000 |
| 2.00 | contractor's Profit for i) | 1 | nos | 12,375 ₹12,375 Lowest | 12,600 ₹12,600 |
| 3.00 | Cost of Bushing insulator with studs for i) | 2 | Nos | 6,040 ₹12,080 Lowest | 6,773 ₹13,546 |
| 4.00 | Cost of Gasket/Corksheet for i) | 2 | Nos | 3,190 ₹6,380 Lowest | 3,575 ₹7,150 |
| 5.00 | Cost of Complete dismantling and re-assembling and brazing lids after repair for i) | 1 | Job | 10,000 ₹10,000 Lowest | 11,200 ₹11,200 |
| 6.00 | (100 KVA, 3.3KV/415V Transformer) Cost of Copper Wire with DPC Covering including labour cost, insulation cost with less scrap for ii) | 90 | Kg. | 990 ₹89,100 Lowest | 1,008 ₹90,720 |
| 7.00 | contractor's Profit for ii) | 1 | nos | 8,910 ₹8,910 Lowest | 9,072 ₹9,072 |
| 8.00 | Cost of Complete dismantling and re-assembling and brazing lids after repair for ii) | 1 | Job | 8,000 ₹8,000 Lowest | 8,960 ₹8,960 |
| 9.00 | (3 Nos of 10 KVA, 3.3KV/415V Transformer) Cost of Copper Wire with DPC Covering (copper winding weight of a 10 KVA transformer is approximately 15 kg) including labour cost, insulation cost with less scrap for iii) | 45 | Kg. | 990 ₹44,550 Lowest | 1,008 ₹45,360 |
| 10.00 | contractor's Profit for iii) | 1 | nos | 4,455 ₹4,455 Lowest | 4,536 ₹4,536 |
Tender Value
₹3.9 L
EMD Value
₹4,900
Closing Date
23 Sept 2025, 4:00 pmClosed
PE EnM JOCP
JOCP
Complete repairing and rewinding of 05 Nos of Transformers i) 160 KVA, 11KV/440V, ELCON Make, ii). 100 KVA, 3.3KV/415V, Marsons Make, iii) 3 nos of 10KVA, 3.3KV/230V Distribution Transformers of different places of JOCP under Hazaribagh Area
2025_CCL_343918_1
PO/JOCP/EnM/Tender/25-26/15
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
JOCP
AS PER NIT
2 documents required · 2 mandatory
₹4,900
30 Oct 2025
12 Sept 2025
24 Sept 2025
13 Sept 2025
23 Sept 2025
13 Sept 2025
13 Sept 2025 - 17 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .