| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC | ₹1.6 Cr | L1 | Accepted-AOC L1 Accepted for further proceedings |
| 2 | L2₹1.7 CrRejected-Finance | ₹1.7 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹1.8 CrRejected-Finance | ₹1.8 Cr | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | V M FAIZAL L3 | Musthafa KT L2 | K. Abdul Rahim L1 |
|---|---|---|---|---|---|---|
| 1.00ROAD WORK | ||||||
| 1.01 | 2.3.1.A
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes,shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to beused or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By ManualMeans | 0.4 | Hectare | 1,92,644.46 ₹77,057.78 | 1,92,644.46 ₹77,057.78 | 1,62,644.46 ₹65,057.78 |
| 1.02 | 2.5.1.A
Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately
Bituminous courses - By Manual Means | 799.2 | cum | 2,000 ₹16.0 L | 2,000 ₹16.0 L | 1,787 ₹14.3 L |
| 1.03 | 3.19.1
Loosening of the ground upto a level of 500 mm below the sub-grade level, watered,graded and compacted in layers to meet requirement of table 300-2 for Compacting original ground supporting sub-grade construction. | 1,598.4 | cum | 167.87 ₹2.7 L | 67.87 ₹1.1 L | 67.87 ₹1.1 L |
| 1.04 | 4.2.A.1 Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-III -For lower sub-base - Mix in Place Method | 1,098.9 | cum | 3,443.4 ₹37.8 L | 3,243.4 ₹35.6 L | 3,243.4 ₹35.6 L |
| 1.05 | 4.12
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix
Macadam specification including premixing the Material with water at OMC in
mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 799.2 | cum | 3,571.44 ₹28.5 L | 3,371.44 ₹26.9 L | 3,371.44 ₹26.9 L |
| 1.06 | 5.1.a
Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means. | 5,328 | sqm | 83.08 ₹4.4 L | 63.08 ₹3.4 L | 63.08 ₹3.4 L |
| 1.07 | 5.2.b
Providing and applying tack coat with bitumen emulsion (RS) using emulsion
pressure distributor at the rate of 0.25 - 0.30 kg per sqm on the prepared Granular
Surface cleaned with mechanical broom. | 5,328 | sqm | 14.81 ₹78,907.68 | 14.81 ₹78,907.68 | 14.81 ₹78,907.68 |
| 1.08 | 5.4.2a
Dense Graded Bituminous Macadam:- For Grading II (26.5 mm nominal size)
Providing and laying dense graded bituminous macadam with 80-100 TPH HMP
producing an average output of 75 tonnes per hour using crushed aggregates of
specified grading, premixed with a bituminous binder (VG 30) @ 4.0 to 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level, and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. | 266.4 | cum | 12,627 ₹33.6 L | 12,627 ₹33.6 L | 10,627 ₹28.3 L |
| 1.09 | 5.6.2.a
Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with a bituminous binder( NRMB) @ 5.4 percent of mix and filler,transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level, and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects For Grading - II (13.2 mm Nominal Size) | 159.84 | cum | 15,908.84 ₹25.4 L | 15,908.84 ₹25.4 L | 13,908.84 ₹22.2 L |
Tender Value
₹1.6 Cr
EMD Value
₹50,000
Closing Date
3 Nov 2025, 1:00 pmClosed
Sr. Manager
SILK FOUNDRY UNIT.PALAPPURAM P.O, OTTAPALAM.PALAKKAD- 679 103
Upgradation of Karad Channayil Palliyali Road in Vazhayur Grama Panchayat, Kondotty Block Panchayat-General Civil Work.
2025_SILK_815449_1
SILK/FUO/TD/2025-26/48
Open Tender
Miscellaneous Works
360 days
Kondotty
As per the tender documents
6 documents required · 6 mandatory
₹5,900
₹50,000
Yes
26 May 2026
27 Oct 2025
4 Nov 2025
27 Oct 2025
3 Nov 2025
27 Oct 2025
27 Oct 2025 - 3 Nov 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
GCC.pdf
Tender Documents • 0.29 MB
PROFILE.pdf
Additional Documents • 0.03 MB
BOQ_1365161.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid