Tender Value
₹10.9 L
EMD Value
₹21,812
Closing Date
13 Jul 2026, 3:00 pm5d left
CHIEF ENGINEER
NAGAR NIGAM BAREILLY
Construction work for a 5-seater public toilet in Ward-19 (Kanjdaspur), located near the Air Force Crossing on Nainital Road.
2026_DOLBU_1166458_1
176/CE/CD/NNB/26-27 (1 To 20) Sr No 20 Tender List 60 Date-02.07.2026
Open Tender
Civil Works
90 days
BAREILLY
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,298
Bareillye-tender.com
₹21,812
6 Jul 2026
6 Jul 2026
13 Jul 2026
6 Jul 2026
13 Jul 2026
6 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per S.I. No. 251. | 69.91 | CUM | 195 | ₹13,632.45 |
| 1.02 | Cement concrete with 4cm gauge approved stone ballast, approved fine sand, cement in the proportion 8:4:1 including supply of all materials, labour and tools and plants etc. required for proper completion of the work. SI No. 281 | 8.48 | CUM | 6,980 | ₹59,190.4 |
| 1.03 | M-150 brick work in One part cement and Six part Fine sand in foundation and plinth including supply of all materials, labour & T&P required for proper completion of work as per SI.No. 303 | 23.31 | CUM | 5,350 | ₹1,24,708.5 |
| 1.04 | M-150 brick work in One part cement and Six part Fine sand in superstructure including supply of all materials, labour & T&P required for proper completion of work as per SL.No. 303 & 310. | 33 | CUM | 5,730 | ₹1,89,090 |
| 1.05 | 12 mm thick plaster with cement and approved course sand in proportion 1:3 over brick work minimum thickness not to be less than 1 cm including supply of all materials labour and T&P etc. required for proper completion of the work SLNO. 584 | 247.1 | SQM | 210 | ₹51,891 |
| 1.06 | R.C.C. Work with cement approved coarse sand and 2cm. gauge approved stone grit in proportion of 1:2:4 in raft, footing and foundation excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I Binding wire and including necessary centering and shuttering etc. and supply of all meterials, labour and T&P etc. required for proper completion of work. Binding wire of supplied by the contractor free of cost as per S.I. No. 283. | 5.07 | CUM | 8,245 | ₹41,802.15 |
| 1.07 | R.C.C. Work with cement approved coarse sand and 2cm. gauge approved stone grit in proportion of 1:1.5:3 in plinth beam, tie beam excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I Binding wire and including necessary centering and shuttering etc. and supply of all meterials, labour and T&P ete. required for proper completion of work. Binding wire of supplied by the contractor free of cost as per S.I. No. 283a | 2.36 | CUM | 8,670 | ₹20,461.2 |
| 1.08 | R.C.C. Work with cement approved coarse sand and 2cm. gauge approved stone grit in proportion of 1:1.50:3 in suspended floor slab etc excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I Binding wire and including necessary centering and shuttering etc. and supply of all meterials, labour and T&P etc. required for proper completion of work. Binding wire of supplied by the contractor free of cost as per S.I. No. 288. | 7.8 | SQM | 8,275 | ₹64,545 |
| 1.09 | R.C.C. Work with cement approved coarse sand and 2cm. gauge approved stone grit in proportion of 1:1.5:3 in columns excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I Binding wire and including necessary centering and shuttering etc. and supply of all meterials, labour and T&P etc. required for proper completion of work. Binding wire of supplied by the contractor free of cost as per S.L. No. 289. | 1.61 | CUM | 8,700 | ₹14,007 |
| 1.1 | Mild steel or Iron for plain work such as reinforced concrete brought to proper shape as necessary including its bending with supply of steel with overlaps & wastage also required for proper completion of the work as per E/I SI No. 504 | 13.82 | QTL | 8,870 | ₹1,22,583.4 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 18.19 MB
BOQ_2187947.xls
BOQ • 0.39 MB