NARESH CH. RAY
Uttarkanya, Fulbari, Jalpaiguri
Construction of Paver block road from Tipu Roys house to Gopal Biswas s house and upto Tea Garden Office in part no 16 35, 16 34 within Amguri GP under Maynaguri Block in the District of Jalpaiguri.(Length - 900m)
2026_NBDD_1038989_9
NBDD/BS/EE/ NIe-T- 45/2026-27
Open Tender
CIVIL WORKS
Percentage
300 days
Uttarkanya, Fulbari
Please refer Tender documents.
6 documents required · 6 mandatory
₹1.9 L
Yes
21 Aug 2026
21 Aug 2026
9 Sept 2026
21 Aug 2026
7 Sept 2026
21 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of Flexible Pavements Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately (Reference to MoRT&H's specification clause 202) 5(I) By Manual Means 5(I)B Granular courses | 540 | Cu.M | 693.64 | ₹3,74,565.97 |
| 2 | Clearing and Grubbing Road Land
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal ofunserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm inthickness. (Reference to MoRT&H's specification clause 201)
3(II) By Mechanical Means
3(II)(A) In area of light jungle | 0.27 | Hectare | 59,747.31 | ₹16,131.77 |
| 3 | Construction of Embankment with Material obtained from Borrow pits
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading,grading to required slope and compacting to meet requirement of table 300-2 & 300-1 .The size course material in the mix of earth ordinarily shall not be exceed 75mm.(Reference to MoRT&H's specification clause 305) Cost of compensation for Earth material & its carriage from private land at 5km distance have been included in the rate. | 972 | Cu.M | 260.45 | ₹2,53,157.01 |
| 4 | By Mix in Place Method
Construction of granular sub-base by providing graded materials such as natural sand/crushed gravel/crushed stone/combination depending upon the required grading , spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator and compacting with vibratory roller toachieve at least 98% of the maximum dry density for the material determined as per IS:2720 (Part 8), complete as per clause 401 desire density, complete as per clause 401 Rate per cum for grading-III Material (Using N.B. Variety Stone Chips) | 550.8 | Cu.M | 2,335.02 | ₹12,86,128.69 |
| 5 | Water Bound Macadam
Providing, laying, spreading and compacting stone aggregates of
specific sizes to water bound macadam specification including
spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stagesto proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate,watering and compacting to the required density (Reference to MoRT&H's specification 404). 9A By Manual Means 9A(i) Grading-1(Table 400-9)
9A (i)(b) Using Screening (Table 400-10)
Type-A (13.2 mm aggregate) (Using N.B. Variety Stone Chips) | 207.06 | Cu.M | 3,421.95 | ₹7,08,549.55 |
| 6 | Water Bound Macadam
Providing, laying, spreading and compacting stone aggregates of
specific sizes to water bound macadam specification including
spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stagesto proper grade and camber, applying and brooming requisite type ofscreening/ binding Materials to fill up the interstices of coarse aggregate,watering and compacting to the required density (Reference to MoRT&H's specification 404).
9A By Manual Means
9A(ii) Grading-2 (Table 400-9)
9A (ii)(b) Using Screening (Table 400-10)
Type-B (11.2 mm aggregate) (Using N.B. Variety Stone Chips) | 207.06 | Cu.M | 4,230.96 | ₹8,76,062.74 |
| 7 | Supplying and Laying in the particular pattern of cement concrete block pavements with BIS certification and spacer nib of size and shape with aspect ratio as per IS 15658 with cement concrete grade not less than M40 on the prepared base course of specified CBR as mentioned in design and drawing with a cushion of bedding sand of 30 to 50 mm thick (grading of the bedding sand as per clause 6.5.1 of IRC SP-63) and filling up the gaps between two paver block with joint filling sand (the grading of the joint filling sand will be as per clause 6.5.2) complete as per IRC SP - 63 with proper confinement of bedding and joint filling sand, compaction,levelling and filling up of the edge gaps with mortar. Type I, II,III, IV should be as per design requeirment or instruction of E-I-C.
a) Type - IV (60 mm thickness) inter locking system | 2,754 | Sq.M | 1,671.65 | ₹46,03,715.84 |
| 8 | Plain/Reinforced cement concrete in open foundation complete all including vibrating and compacting, finishing, curing, sampling, testing etc. as per drawing and Technical Specifications (Reference to MORT&H's specifications 1500, 1700 & 2200).
8B PCC Grade M20
Using Concrete Mixer
1) Add 4% extra cost as formwork over cost of material
2) Needle Vibrator is an item of minor T & P which is already included in overhead charges. Hence not added in rate analysis of cement concrete works. (Using N.B. Variety Stone Chips) | 207.06 | Cu.M | 6,747.35 | ₹13,97,105.5 |
| 9 | Excavation for Structures
Earth work in excavation of foundation of structures as per
drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work (Reference to MoRT&H's specification clause 304).
13(i) Ordinary soil
13(i)A Manual Means (Depth upto 3 m) | 283.5 | Cu.M | 409.12 | ₹1,15,984.9 |
| 10 | Providing and fixing of retroreflectorised cautionary, mandatory and informatory sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3,fixed over aluminium sheeting, 1.5 mm thick,when signs with maximum side dimensions do not exceed 600mm, or with aluminium sheeting 2.0mm thick when signs with maximum side dimensions exceeds 600mm, supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing (Reference to MORT&H's specification 801).
4(i) 90 cm equilateral triangle | 2 | Each | 6,546.09 | ₹13,092.17 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
Tendernotice_2.pdf
PDF • 0.51 MB
BOQ_2552013.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].