Loading…
Loading…
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
16 Jun 2026, 5:00 pm3d left
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - ICGS C-423; L006 During boat davit operation smoke observed from control transformer in control panel of boat davit and abnormal noise observed from hoisting gearbox Lim..
and Installation of Plant/Systems/Equipments (Version 2) - ICGS C-423; L013 Port blower of water jet compartment is not getting start Zero insulation measured suspected winding burnt Defect to be identified and rectified and sys..
and Installation of Plant Systems/Equipments (Version 2) - ICGS C-423; L022 Smoke observed from AC control panel during operation DI DR carried out by SS and observed contactor coil and NO NC switch burnt out Contactor coil and..
and Installation of Plant/Systems/Equipments (Version 2) - ICGS C-423; L 023 Main engine control battery charger is non operational Defect identification carried out by SS and observed that control PCB is burnt Same to be repair..
9444175
GEM/2026/B/7642769
Two Packet Bid
Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C-423; L006 D
South Andamans, Andaman And Nicobar Islands
Total value wise evaluation
SERVICE
5 documents required · 5 mandatory
1 yrs
₹1 L
| Item | Delivery Location | Qty | Delivery |
|---|---|---|---|
| Repair | - | - | - |
| Maintenance | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - ICGS C-423; L006 During boat davit operation smoke observed from control transformer in control panel of boat davit and abnormal noise observed from hoisting gearbox Lim.. | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - ICGS C-423; L013 Port blower of water jet compartment is not getting start Zero insulation measured suspected winding burnt Defect to be identified and rectified and sys.. | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - ICGS C-423; L022 Smoke observed from AC control panel during operation DI DR carried out by SS and observed contactor coil and NO NC switch burnt out Contactor coil and.. | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - ICGS C-423; L 023 Main engine control battery charger is non operational Defect identification carried out by SS and observed that control PCB is burnt Same to be repair.. | - | - | - |
Exempted
Yes
9 Jun 2026
9 Jun 2026
16 Jun 2026
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_9444175.pdf
GEM_BID • 0.12 MB
1781003378.pdf
GEM_OTHER • 0.17 MB
1781003401.pdf
GEM_OTHER • 0.88 MB
SOW_2e553361-983b-4798-8f261781003501011_DTO14.pdf
GEM_OTHER • 0.17 MB
ATC_083968c6-7ffa-4adc-b73d1781003521843_DTO14.pdf
GEM_OTHER • 0.88 MB
gtc.pdf
GEM_OTHER • 0.71 MB
Download all tender documents and submit your bid