Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.1 LAccepted-AOC | 1 | Accepted-AOC lowest rate quoted bidder | |
| 2 | Rejected-Technical KUTTIPARICHEL HOUSE KINGINIMATTOM P O KOLENCHERY ERNAKULAM 682311 | KOLENCHERY | ERNAKULAM | KERALA | 682311 | - | Rejected-Technical qooted rate was more than the lowest bidder | |
| 3 | Rejected-Technical | - | Rejected-Technical qooted rate was more than the lowest bidder |
Tender Value
₹5.3 L
EMD Value
₹13,200
Closing Date
23 Jul 2020, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Executive Engineer
Assistant Executive Engineer MI sub division CHERTHALA
Desilting of thodu
2020_Irrig_371866_1
1/AEE/KDSNC/2020-21
Open Tender
Civil Works - Others
Item Rate
90 days
Thycattusseri
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,050
online
₹13,200
27 Aug 2020
15 Jul 2020
27 Jul 2020
15 Jul 2020
23 Jul 2020
15 Jul 2020
15 Jul 2020 - 22 Jul 2020
60 days
Amount
SCHEME-1-DESILTING
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od7827/2020_2021/KP : Earth work in excavation by mechanicl means(hydraulic excavator ) manual means over areas ( exceeding 0 cm in depth ,1.5 m in width as well as 10 sqm on plan including lead up to 50 m and lift up to 1.5 m and forming bunds on both banks using excavated earth to be leveled and neatly dressed (2.6+ 20% for under water ) for all kinds of soil details of cost for 10 cum average out put of hydraulic excavator per hour =0 cum < br> MACHINERY
SCHEME 2-DESILTING
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od7837/2020_2021/KP : Earth work in excavation by mechanical means(hydraulic excavator ) manual means over areas ( exceeding 30 cm in depth ,1.5 m in width as well as 10 sqm on plan including lead up to 50 m and lift up to 1.5 m and forming bunds on both banks using excavated earth to be leveled and neatly dressed (2.6+ 20% for under water ) for all kinds of soil details of cost for 10 cum average out put of hydraulic excavator per hour =30 cum < hr> MACHINERY
SCHEME.3.DESILTING
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od7837/2020_2021/KP : Earth work in excavation by mechanical means(hydraulic excavator ) manual means over areas ( exceeding 30 cm in depth ,1.5 m in width as well as 10 sqm on plan including lead up to 50 m and lift up to 1.5 m and forming bunds on both banks using excavated earth to be leveled and neatly dressed (2.6+ 20% for under water ) for all kinds of soil details of cost for 10 cum average out put of hydraulic excavator per hour =30 cum < hr> MACHINERY
SCHEME-4-DESILTING
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od7837/2020_2021/KP : Earth work in excavation by mechanical means(hydraulic excavator ) manual means over areas ( exceeding 30 cm in depth ,1.5 m in width as well as 10 sqm on plan including lead up to 50 m and lift up to 1.5 m and forming bunds on both banks using excavated earth to be leveled and neatly dressed (2.6+ 20% for under water ) for all kinds of soil details of cost for 10 cum average out put of hydraulic excavator per hour =30 cum < hr> MACHINERY
ELDHOSE K PAUL
MUDOOR CONSTRUCTION
Bidder Name
MUDOOR CONSTRUCTION
SUNIL M
ELDHOSE K PAUL
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_526659.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .