| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 CrAccepted-AOC 825 GANDHI CHOWK RANIKHET 263645 DISTRICT ALMORA | RANIKHET | ALMORA | UTTARAKHAND | 263645 | ₹4.2 Cr | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical Hard Copy Not received |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically Disqualified |
Tender Value
₹4.2 Cr
EMD Value
₹8.4 L
Closing Date
7 Jan 2023, 5:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer, Construction Circle, Uttarakhand PeyJal Nigam, Almora.
Civil Work-water works
2022_MDPEY_53174_1
2718/NIVIDA QUOTATION/143, DATE 19/12/2022
Open Tender
Civil Works - Water Works
Item Rate
365 days
Block Tarikhet, District Almora
Please Refer to Tender Documents
3 documents required · 3 mandatory
₹5,900
EE, Construction Division, UKPJN, Ranikhet
₹8.4 L
Construction Circle, UKPJN, Almora.
22 May 2023
23 Dec 2022
10 Jan 2023
23 Dec 2022
7 Jan 2023
24 Dec 2022
24 Dec 2022
Amount
Design drawing and construction of R.C.C Infilteration Well cum pump house of external dia 4 m and 9m height of well steining and 4m height of pump house with required discharge of 560 LPMincluding supply of all materials ,labour,T&P required for completion of work.
Increase/Decrease in height of Infiltration well
5 m. of span Steel/ RCC bridge 1.50 Mt wide including abutment etc complete.
Increase/Decrease in length of steel/ RCC bridge
Design and Construction of Duty room with toilet & store Size - 3.00X2.50M Including site devolopment, excavation work, all the Brick work ,RCC work ic. Supply of all material labour and T.P etc complete.
Providing of all material,carting from site store to site of work, lowering into trenches with true alignment,laying of following API 5L X56 grade pipe in rising mains, jointing by electric welding, including supply of all material labour ,T& P etc complete.
125 mm dia 3.2mm thick
100 mm dia 3.2mm thick
Providing, Carting, laying & Jointing of G.I.(M) Pipes in trenches as per direction of engineer in charge complete with testing in all respect., including supply of all material, labour, T&P etc. required for completion of work .
15 mm dia.
20 mm dia
25mm dia
32mm dia
40mm dia
50mm dia
65mm dia
Dismantling of following dia screwed and socketed G.I. Pipes, specials and fittings including taking out of dismantled G.I. pipes and specials from trenches and stacking them properly within 50.00m but excluding the cost of earth work including supply of all materials,labour,T&P etc. complete
15mm dia
20mm dia
25mm dia
32mm dia
40mm dia
50mm dia
65mm dia
Relaying of dismantled G.I.Pipe in true alignment in trenches including supply of all materials,labour,T&P etc. complete.
15mm dia
20mm dia
25mm dia
32mm dia
40mm dia
50mm dia
65mm dia
Excavation of earth for Pipe Line trenches of Clear Water Rising Main and Feeder / Supply Main in following strata requiring the use of special T&P such as Pick Axes, Sabbals etc. or by blasting or by crow bars with a lift up to 1.5 m and lead upto 30 m including refilling, watering and ramming of excavated earth into the trenches and removal and disposal of surplus earth upto a distance of 60 m from the trenches including supply of all materials, labour, T&P etc.
Soil mixed with boulder and bajri
Ordinary Rock
Construction of M 20 grade R.C.C. semi-sunk circular Sump / Service Reservoir as per Type design drawing specifications of following capacity along with other appurtenant works, including supply & carting of all material, necessary scaffolding, shuttering and other accessories alongwith construction of Valve Chamber (2 No. of 60*60*75)cm, 60 cm wide apron around reservoir, supply / fixing of inlet, wash out, over flow and outlet pipes (with appropriate size Gate Valve), M.S. Manhole Cover, Steel Ladder (inside & outside (10.00 Kl ownwards) the tank), making bye pass arrangement and painting two coat with delux multi surface paint over outer surface and including priming coat cement primer, Testing of reservoir, also supply of all labour, T&P etc. complete.
Supply & Fixing of followinf size of sluice valve i/c all material labour T&P etc complete.
100 mm dia C.S Sluice valve W.P 30kg/cm2
100 mm dia C.S Sluice valve W.P 50kg/cm2
Supply & Fixing of followinf size of Reflux valve i/c all material labour T&P etc complete.
100mm dia C.S Reflux valve W.P 30 kg/cm2
100mm dia C.S Reflux valve W.P 50 kg/cm2
Supply & Fixing of followinf size of Air valve i/c all material labour T&P etc complete.
50mm dia C.S Air valve W.P 30kg/cm2
Painting on steel work(MSERW PIPE) with black anticorrosive bitmustic paint of approve brand two coats on new work .
Supply of all material labour T&P etc. and construction of Ancor Block as per type design complete.
Supply and fixing of following size of Valve for Feeder Main / Distribution system including supply of all materials, labour, T&P etc. complete.G.M. Wheel / Gate Valve as per IS 778 : 1997 & IS 14846 : 2000 Wheel Valve
25mm dia
32mm dia
20 mm dia Air Valve
Provide FHTC under JJM by providing brass ferrule, brass, bibcock of approved quality, including specials and making connection with the existing M.S. Galvanised mains, including cutting and threading of pipe, bailing out water, fixing, specials and testing making ferrule connection in the existing main of G.I. or any type of pressure mains including tapping the main with supply of all materials,labours ,T.&P. etc.
Constructing masonry Chamber of following size inside, in brick work/ stone masonry in cement mortar 1:4 (1 cement : 4 coarse sand) for Sluice/ Reflux/ wheel / Gate / Air valve complete with locking arrangement and RCC top slab or M.H. cover, i/c necessary excavation, base concrete and inside plastering with cement mortar 1:3. complete as per standard design, including supply of all materials, labour, T&P etc. complete.
Supply of all materials, labour, T&P etc and construct earthquake/vibration resistant, Pump house having size6.00 M X5.00 M x 4.0 M at MPS, IPS 1 & . Including drawing, design, testing of soil bearing capacity complete. Also including excavation for foundation, supply & fixing 02 rolling shutters, glazed Z-section windows, ventilator, 0.60 M wide sunshades, arrangement to support 10 T HOT girders, CC flooring, cable trench, electrification works, 0.60 M wide appron with drain, 0.60 M wide slab projection and two coat snowcem/distemper/painting.
12 mm cement plaster of mix 1:6 including cost of all material labour, cartage and T&P etc. all complete
Centering and Shuttering for foundation of transformer including cost of all material labour, cartage and T&P etc all complete.
Brickwork with F.P.S. bricks of class designation 75 in Cement mortar 1:4 including cost of all material labour, cartage and T&P etc. all complete
MS iron work in reinforcement including cost of all material labour, Cartage and T&P etc all complete
Provision of 1.5 m high barbed wire fencing ic supply of all material, labour, Cartage and T&P etc all complete
Provision of M.S. iron gate with piller ic supply of all material, labour, Cartage and T&P etc all complete
Construction of protection works for various structures as per site conditions wherever necessary as follows :-
Earthwork in excavation for foundation with a lift up to 1.5 m and lead upto 30 m including watering and ramming of surface and removal and disposal of surplus earth upto a distance of 60 m including supply of all materials, labour, T&P etc. complete including cartage of materials. (Building work)
P.C.C. 1:2:4 with 20 mm gauge stone ballast including supply of all materials, labour, T&P etc. complete.
P.C.C. 1:4:8 with 40 mm gauge stone ballast including supply of all materials, labour, T&P etc. complete.
Random Rubble Stone Masonry in 1:6 cement and sand mortar including supply of all materials, labour, T&P etc. complete.
Random Rubble Stone Masonry laid dry including supply of all materials, labour, T&P etc. complete.
One Year Trail And Testing ( Civil Works)
Pumping Plant for Stage-I (Infiltration Well) Submersible Pump-Motor Set (537 LPM, 150 M Head)
Starter
Main switch 160 Amps
Control Panel
Power Wiring & Earthing Material
Main Piping & Valves
Gauges
Chain Pulley Block (1.5 Tonne capacity)
Stage- II MPS: Centrifugal Pump (488 LPM, 580 M Head)
Electric Motor
Main switch 400 Amps
Base Plate
Fully Auotomatic Auto Transformer Starter
Control Panel
Power Wiring & Earthing Material
Main Piping & Valves
Gauges
Tools for all stages
Rubber Resistance Sheet (1×2×0.025 M)
Heavy duty crimping tool
150 mm dia bulk head water meter.
Installation & commissioning of Pumping Plants & related acceessories for all stages.
Testing (all stages) : At Works
At Site
Painting (all stages)
Carting for all stages
Maintenance (one year) (all stages)
S.I.T.C. of Transformer
(i) MPS (400 KVA)-2 Nos.
S.I.T.C. of H.T. Panel
(i) MPS -1 No.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .