Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.0 LAccepted-Finance | L1 | Accepted-Finance Accepted Vide Resolution No IRR/PII/TR/3429/2025_5_1_1/1 dtd 29.10.2025 |
| Sl No | Description | Qty | Unit | GEO THOMAS L1 |
|---|---|---|---|---|
| 1.00Annual maintenance of canals | ||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 6,308 | sqm | 17.4 ₹1,09,759.2 Lowest |
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 68,590 | sqm | 8.7 ₹5,96,733 Lowest |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 155.18 | cum | 210 ₹32,588.43 Lowest |
| 1.00 | OD8733/2025-2026:Engaging man mazdoor for the timely removal of floating materials and other
obstructions within the canal and during the water distributing period and depositing the same at places pointed out by the departmental officers without causing disturbance to the public including lowering and greasing the shutters etc complete as per the specification and as per direction of departmental officers at site | 383 | each | 920 ₹3,52,360 Lowest |
| 1.00 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 13 | each | 350 ₹4,550 Lowest |
| 1.01 | 2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth | 24 | each | 300 ₹7,200 Lowest |
Tender Value
₹12.2 L
EMD Value
₹30,579
Closing Date
27 Oct 2025, 6:00 pmClosed
Manilal K M
The Assistant Executive Engineer, KIP(LB)Subdivision No.1,Punalur
GENERAL-KIP O and M SECTION 7/2 KALANJOOR -Annual Maintenance of Konni Distributory from Ch 0m to 22125m,Vazhamuttom distributory from ch 0m to 4274m and Mallassery distributoryfrom 0M to 984M in connection with water distribution for the year 2025-
2025_Irrig_803898_2
IRR/PII/TR/3429/2025_5_1_1/1
Open Tender
Civil Works - Canal
Item Rate
270 days
konni
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹30,579
Yes
29 Oct 2025
17 Oct 2025
29 Oct 2025
17 Oct 2025
27 Oct 2025
17 Oct 2025
Amount
Annual maintenance of canals
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
OD8733/2025-2026:Engaging man mazdoor for the timely removal of floating materials and other obstructions within the canal and during the water distributing period and depositing the same at places pointed out by the departmental officers without causing disturbance to the public including lowering and greasing the shutters etc complete as per the specification and as per direction of departmental officers at site
50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth
Bidder Name
GEO THOMAS
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1355077.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tendernotice_2.pdf
PDF • 0.25 MB
Tendernotice_3.pdf
PDF • 0.25 MB
BOQ_1355077.xls
BOQ • 0.30 MB
pa.pdf
Tender Documents • 0.01 MB
nitsbd.pdf
Tender Documents • 1.67 MB
fot.pdf
Tender Documents • 0.01 MB
affdvt.pdf
Tender Documents • 0.01 MB
epay.pdf
Tender Documents • 0.00 MB
intpact.pdf
Tender Documents • 0.00 MB
nitforretender.pdf
Other Document • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .