Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC JATANBARI KARBOK GOMATI TRIPURA | ₹1.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.4 Cr+₹82,542.70 (0.61%)Accepted-AOC | ₹1.4 Cr+₹82,542.70 (0.61%) | L2 | Accepted-AOC L2 |
| 3 | L3₹1.4 Cr+₹4.9 L (3.64%)Accepted-AOC | ₹1.4 Cr+₹4.9 L (3.64%) | L3 | Accepted-AOC L3 |
| 4 | L4₹1.5 Cr+₹10.0 L (7.39%)Accepted-AOC AGARTALA TRIPURA W | AGARTALA | TRIPURA | ₹1.5 Cr+₹10.0 L (7.39%) | L4 | Accepted-AOC L4 |
| 5 | Rejected-Technical AMARPUR GOMATI TRIPURA | AMARPUR | GOMATI | TRIPURA | - | - | Rejected-Technical non submission of proper documents |
Tender Value
₹1.2 Cr
EMD Value
₹2.5 L
Closing Date
5 May 2022, 3:00 pmClosed
Deputy General Manager Electrical Division Kanchan
Kanchanpur,North Tripura
Providing 3ph service connection to newly constructed DTW Pump and Innovative scheme at different locations with installation of 23 nos 11/0.433 KV, 3X100 KVA,16X63 KVA, 4x25 KVA Transformer and 11 KV HT/LT Line extension under jurisdiction of Elect
2022_POWER_27912_1
DNIT/ED-KCP/22-23/ 01
Open Tender
Electrical Work/ Equipment
Supply
180 days
North Tripura
Please refer Tender documents.
8 documents required · 8 mandatory
₹4,000
₹2.5 L
5 Jul 2022
21 Apr 2022
6 May 2022
21 Apr 2022
5 May 2022
21 Apr 2022
21 Apr 2022 - 25 Apr 2022
Amount
SCHEDULE - A Supply
9 mtr. long PCC Pole
8 mtr. long PCC Pole
9 mtr. long steel Pole (galvanised)
8 mtr. long steel Pole (galvanised)
Stay set Complete
Stay Insulator (HT)
Stay Insulator (LT)
Stay Std. wire, (7/2.50 mm)
Galvanised M.S. Channel-100X50X50X6 mm, 75x40x40x6 mm, angle 65x65x6 mm, 50x50x6 mm, flats 50x6 mm.
M.S. Nuts & bolts (assorted size)
11 KV Pin Insulator (Poly)
11 KV Disc Insulator (Poly)
11 KV Disc Fittings
LT Shackle Insulator (3x3.5)" size
Lt Straps, Nuts & Bolts
A.C.S.R-6/1/2.59 mm
G.I. wire-8 SWG
11 KV G.O. Switch, 3-Phase
11 KV D.O. Fuse, 3-Phase
11 KV L.A. polymer(9 KV, 5 KA L.A)
100 A Cut-Out
200 A Cut-Out
PVC Cable-95 sq.mm
PVC Cable-16 sq.mm
3-Ph. Energy Meter (20-100)Amps
Danger plate
Barbed wire
PG clamp for weasel
60 kg Salt & 55 kg Charcoal for earthing (1 pit)
GI pipe 40mm dia 2.5 Mtr long (Make - TATA / JINDAL)
Wooden plank
Bi-mettalic Lug - 95 sq.mm
Bi-mettalic Lug - 50 sq.mm
PVC Pipe 1" Size
SCHEDULE -B Dismentling
9.00 Mtr. Long PCC Pole
9.00 Mtr. Long steel Pole
8 mtr. long PCC Pole (highly Inclined)
SP Top X-arm of 0.3 Mtr. Long MS Channel of Size 75x40x40x6mm
SP bottom X-arm of 1.2 Mtr. Long MS Channel of Size 75x40x40x6mm
SP Gaurd X-arm of 1.6 Mtr. Long MS Angle of Size 65x65x6 mm.
DP Top X-arm of 2.2 Mtr. Long MS Channel of Size 75x40x40x6mm.
DP Top Guard X-arm of 2.5 Mtr. Long MS Channel of Size 65x65x6 mm.
11KV Polymer Disc insulator with fittings
11KV Polymetric Pin Insulator
Stay Set Complete
A.C.S.R. (6/1/2.59 mm)
GI Wire (8SWG)
Cradle Guard
4-wire LT bracket(01.10mtr.long of M.S.Angle-50X50X6mm)
2-wire LT bracket(0.6 mtr.long of M.S.Angle-50X50X6mm)
LT Shackle Insulator(3X3.5)" size with straps, Nuts & Bolt
SCHEDULE -B Erection
Installation / positioning of 11/0.430 KV , 3-phase 100 KVA of distribution transformer on pole with necessary connection and fitting fixing of all allied assessories components as required for making complete in all respect for energizing .
Installation / positioning of 11/0.430 KV , 3-phase 63 KVA of distribution transformer on pole with necessary connection and fitting fixing of all allied assessories components as required for making complete in all respect for energizing .
Installation / positioning of 11/0.430 KV , 3-phase 25 KVA of distribution transformer on pole with necessary connection and fitting fixing of all allied assessories components as required for making complete in all respect for energizing .
9 mtrs length of PCC pole at any kind of soil upto a depth of 1/6th of pole height , i/c excavation of earth , refilling the pit with soil upto the ground level, ramming and making complete in all respect .
9 mtrs length of Steel pole at any kind of soil upto a depth of 1/6th of pole height , i/c excavation of earth , refilling the pit with soil upto the ground level, ramming and making complete in all respect .
8 mtrs length of Steel pole at any kind of soil upto a depth of 1/6th of pole height , i/c excavation of earth , refilling the pit with soil upto the ground level, ramming and making complete in all respect i/c Hand-cart carriage & mannual carriage with necessary loading & unloading.
8 mtrs length of PCC pole at any kind of soil upto a depth of 1/6th of pole height , i/c excavation of earth , refilling the pit with soil upto the ground level, ramming and making complete in all respect i/c Hand-cart carriage & mannual carriage with necessary loading & unloading.
2.8 Mtr. Long MS Channel of Size 100x50x50x6mm for DT & Disc support
0.6 Mtr. Long MS Channel of Size 100x50x50x6mm for DT support
2.8 Mtr. Long MS Channel of Size 75x50x50x6mm for GO & DO & LA i/c line GO & DOF
2.8 Mtr. Long MS Channel of Size 75x50x50x6mm for GO pipe i/c line GO handle
SP Top X-arm of 0.3 Mtr. Long MS Channel of Size 75x40x40x6mm
SP bottom X-arm of 1.2 Mtr. Long MS Channel of Size 75x40x40x6mm
SP Guard X-arm of 1.6 Mtr. Long MS Angle of Size 65x65x6 mm.
DP Top X-arm of 2.2 Mtr. Long MS Channel of Size 75x40x40x6mm.
DP Guard X-arm of 2.5 Mtr. Long MS Angle of Size 65x65x6 mm.
11KV DP Top X-arm of 1.3mtr.long MS.Ch.-75X40X40X6mm
11KV DP Bottom X-arm of 1.7mtr.long MS.Ch.-75X40X40X6mm
11KV DP Guard X-arm of 2.1mtr. long MS.Angle-65X65X6mm
Triple pole Top X-arm of 2.2 Mtr. Long MS Channel of Size 75x40x40x6mm
Triple pole Gaurd X-arm of 2.5 Mtr. Long MS Angle of Size 65x65x6 mm
Four pole Top X-arm of 2.2 Mtr. Long MS Channel of Size 75x40x40x6mm
Four pole Gaurd X-arm of 2.5 Mtr. Long MS Angle of Size 65x65x6 mm
1.7 Mtr. Long MS Channel of Size 75x40x40x6mm for taping
2 Mtr. Long MS Angle of Size 65x65x6 mm for taping guard
LT Shackle Insulator (3x3.5)" size
4-wire LT bracket(01.10mtr.long of M.S.Angle-50X50X6mm)
2-wire LT bracket(0.6 mtr.long of M.S.Angle-50X50X6mm)
Laying & stringing of 1 km (single conductor ) ACSR 6/1/2.59mm dia weasel i/c hoisting & binding etc. complete as reqd.
Laying & stringing of 1 km (single conductor ) 8 SWG GI wire i/c hoisting & binding etc. complete as reqd.
Stay Set Complete
11KV Polymer Disc insulator with fittings
11KV Polymetric Pin Insulator
11 KV G.O.S. 3-phase
11 KV D.O.F. 3-phase
11 KV L.A. (polymer)
Cradle Guard
Barbed wire (anti-climbing device) per pole
Danger plate
Providing three phase Service Connection
PVC Pipe 1" Size
Construction of Sub-station Fencing with barbed wire, errection supply & errection of barbed wire fencing of MS Angle ( 6Nos. 65x65x6mm & 4Nos . 50x50x6 mm)& provision of gate ( to be fabricated by 35x35x6 mm M.S. Angle-20x6mm M.S. Flat ) fixed with supports of fencing belted at top by 35x35x6 mm M.S. Anglethrough out with provision of hings & locking arragement etc. as per approved design & drawing of ED-KCP .
Sub-Station Name plate in/c supply as directed by Engg- in -charge.
Earthing with GI pipe 2.5mtr long and 40 mm dia, including excavation, refilling with alternate layer of salt and charcoal as per drawing (excluding supply of GI pipe, salt and charcoal, GI wire, Nuts & bolts etc. As required).
Carriage of the following:-
Carriage of 100 KVA transformer from A.D.Nagar, Agartala Electrical Store yard to work site (ESD Dasda & ESD Kanchanpur) (average 210 Km.) by mechanical transport including Loading, Un-loading & Stacking etc. as required. .
a) Beyond 25 Km upto the lead of 50 km
b) Beyond 50 Km (Additional amount of Rs. 428.00 for every 25 Km or part thereof) upto the lead of 50 km
Carriage of 63 KVA transformer from A.D.Nagar, Agartala Electrical Store yard to work site (ESD Dasda & ESD Kanchanpur) (average 210 Km.) by mechanical transport including Loading, Un-loading & Stacking etc. as required. .
a) Beyond 25 Km upto the lead of 50 km
b) Beyond 50 Km (Additional amount of Rs. 378.00 for every 25 Km or part thereof) upto the lead of 50 km
Carriage of 25 KVA transformer from A.D.Nagar, Agartala Electrical Store yard to work site (ESD Dasda & ESD Kanchanpur) (average 210 Km.) by mechanical transport including Loading, Un-loading & Stacking etc. as required. .
a) Beyond 25 Km upto the lead of 50 km
b) Beyond 50 Km (Additional amount of Rs. 298.00 for every 25 Km or part thereof) upto the lead of 50 km
Fabrication of all X-Arm by M.S Angle, MS Channel , M.S. flats etc.
Straightening of Pole: -
9 mtr. long PCC Pole
Re-stringing of conductor including binding, hoisting, jumpering etc as required.
A.C.S.R-(6/1/2.59 mm)
Re-adjustment of stayset complete without dismentalling turn buckle.
Falling of trees/branches of trees of any girth, cutting of trunks, removing of roots fallen on lines or tends to fall on lines and disposal of those shifted at safe places to avoid public disturbance.
Beyond 30 cm to 60 cm girth
Beyond 60 cm to 120 cm girth
Jungle cutting
Grouting of Steel pole C.C. work 1:2:4 (1 Cement : 2 fine sand : 4 graded stone aggregate 20 mm nominal size)
Fitting, fixing of Sub-station cable jointing & cutout.
THE TRIPURA ELECTRICAL HOUSE
SHACHINANDAN BANIK
M/s Bhattacharjee Construction
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .