| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC HOUSE NO 3000 SECTOR 15 HOUSING BOARD COLONY SONIPAT 131001 | SONIPAT | SONIPAT | HARYANA | 131001 | ₹1.7 Cr | L1 | Accepted-AOC Award |
| 2 | L2₹1.9 Cr+₹18.7 L (11.1%)Rejected-AOC | ₹1.9 Cr+₹18.7 L (11.1%) | L2 | Rejected-AOC Reject |
| 3 | L3₹1.9 Cr+₹24.5 L (14.6%)Rejected-AOC 464 21 NEW ANAJ MANDI TOHANA 125120 | FATEHABAD | HARYANA | 125120 | ₹1.9 Cr+₹24.5 L (14.6%) | L3 | Rejected-AOC Reject |
| 4 | L4₹2.0 Cr+₹34.6 L (20.6%)Rejected-AOC 443 V P O LIWAN 132001 | KARNAL | HARYANA | 132001 | ₹2.0 Cr+₹34.6 L (20.6%) | L4 | Rejected-AOC Reject |
| 5 | L5₹2.3 Cr+₹64.6 L (38.4%)Rejected-AOC RGTPP KHEDAR HISAR HARYANA | HISAR | HARYANA | 125001 | ₹2.3 Cr+₹64.6 L (38.4%) | L5 | Rejected-AOC Reject |
Tender Value
₹2.0 Cr
EMD Value
₹3.9 L
Closing Date
25 Jun 2021, 10:00 amClosed
Executive Engineer, PHED No. 1 Gohana
Executive Engineer, PHED No. 1 Gohana Near MC Park Jind Road Gohana
RECALL- CHITANA GORUP- AUGMENTATION OF CANAL BASED WATER SUPPLY SCHEME CHITANA GROUP OF 3 NO. VILLAGES ie CHITANA, BHATANA JAFRABAD AND KILORAD, PROVIDING BOOSTING STATIONS, FUNCTIONAL HOUSEHOLD TAP CONNECTIONS AND LAYING THE BALANCE PIPE LINES
2021_HRY_174319_1
EIC Memo No. 16590-PHE/Mont dt. 26-02-2021
Open Tender
Civil Works
Works
456 days
Village Chitana
Please refer Tender documents.
3 documents required · 3 mandatory
₹15,000
₹3.9 L
Yes
21 Sept 2021
4 Jun 2021
25 Jun 2021
4 Jun 2021
25 Jun 2021
4 Jun 2021
Amount
RAW WATER PUMPING MACHINERY Supply & Eraction of Horizontal spindle split casing type pumping sets of following duties directly coupled to AC squirrel cage induction type motor with accessories as described in Schedule No II complete in all respect with priming arrangement with complete base frame-WATER WORKS- 1400 LPM X 12 M. Head
CLEAR WATER PUMPING MACHINERY-Supply & Eraction of Horizontal spindle split casing type pumping sets of following duties directly coupled to AC squirrel cage induction type motor with accessories as described in Schedule No II complete in all respect with priming arrangement with complete base frame- WATER WORKS - 2.1.1- 700 LPM X 35 M. Head
2.1.1- 800 LPM X 45 M. Head
B/STN KILORAD - 400 LPM X 45 M. Head
B/STN BHATANA ZAFRABAD - 400 LPM X 45 M. Head
PANEL BOARDS FOR MOTORS Supply, erection, testing & commissioning of wall mounted electrical L.T. Panel board, fabricated from 16 SWG CRCA sheet duly stouted with suitable angle iron frame work and completely powder coated of approximate size 1200 x 900 mm and 400 mm deep having follwing items -(3.1)For 3 no Pumping Sets of 1400 LPM x 12 m Head a) Main switch 63 amp. 1 No. (L&T Siemens, ABB) b) CT 100/3 = 3 Nos. (AE/ KAPPA/ L&T) c) Digital Multi function meter = 1 No. d) SPP = 1 No. of approved make e) Motor starter, Star delta for 1400 LPM x 12 m Head = 2 Nos (L&T Siemens, ABB) f) VSS 1 No. & ASS 3 Nos. of approved make. g) Capacitor KVAR as per site requirement = 1 No. h) Indicating Lamp = One Set i) Change over switch of suitable Amp = 1 No. (Each) Ref. sr. no. 1.1.1
(3.2)-For 2 no Pumping Sets of 700 LPM x 35 m Head a) Main switch 63 amp. 2 No. (L&T Siemens, ABB) b) CT 100/3 = 2 Nos. (AE/ KAPPA/ L&T) c) Digital Multi function meter = 1 No. d) SPP = 1 No. of approved make e) Motor starter, Star delta for 700 LPM x 35 m Head = 2 Nos (L&T Siemens, ABB) f) VSS 1 No. & ASS 2 Nos. of approved make. g)Capacitor KVAR as per site requirement = 1 No. h) Indicating Lamp = One Set i) Change over switch of suitable Amp = 1 No. (Each) Ref. sr. no. 2.1.1
(3.3)-For 2 no Pumping Sets of 800 LPM x 45 m Head a) Main switch 63 amp. 1 No. (L&T Siemens, ABB) b) CT 100/3 = 2 Nos. (AE/ KAPPA/ L&T) c) Digital Multi function meter = 1 No. d) SPP = 1 No. of approved make e) Motor starter, Star delta for 800 LPM x 45 m Head = 2 Nos (L&T Siemens, ABB) f) VSS 1 No. & ASS 2 Nos. of approved make. g) Capacitor KVAR as per site requirement = 1 No. h) Indicating Lamp = One Set i) Change over switch of suitable Amp = 1 No. (Each) Ref. sr. no. 3.1.2
(3.4)-For 2 no Pumping Sets of 400 LPM x 45 m Head a) Main switch 63 amp. 1 No. (L&T Siemens, ABB) b) CT 100/3 = 2 Nos. (AE/ KAPPA/ L&T) c) Digital Multi function meter = 1 No. d) SPP = 1 No. of approved make e) Motor starter, Star delta for 400 LPM x 45 m Head = 2 Nos (L&T Siemens, ABB) f) VSS 1 No. & ASS 2 Nos. of approved make. g)Capacitor KVAR as per site requirement = 1 No. h) Indicating Lamp = One Set i) Change over switch of suitable Amp = 1 No. (Each) Ref. sr. no. 3.2.1
(3.5)-For 2 no Pumping Sets of 400 LPM x 45 m Heada) Main switch 63 amp. 1 No. (L&T Siemens, ABB)b) CT 100/3 = 2 Nos. (AE/ KAPPA/ L&T)c) Digital Multi function meter = 1 No.d) SPP = 1 No. of approved makee) Motor starter, Star delta for 400 LPM x 45 m Head = 2 Nos (L&T Siemens, ABB)f) VSS 1 No. & ASS 2 Nos. of approved make.g) Capacitor KVAR as per site requirement = 1 No.h) Indicating Lamp = One Seti) Change over switch of suitable Amp = 1 No. (Each) Ref. sr. no. 3.3.1
Sluice Valves / NRV & specials for Pumping Machinery- Supplying, fixing, jointing, testing & commissioning of DI sluice valves resilient sheet P.N. 1.6 including cost of jointing material complete in all respect. (IVC / VAG make, Kirloskar)- 100mm i/d
Supplying,fixing, testing & commissioning of DI swing check type reflux valve (non returned valve) PN 1.6 including cost of jointing material complete in all respect.( IVC / VAG , Kirloskar make) - 100mm i/d
Supply, fixing & testing of Mechanical Joints PN 1.6 alongwith ruber gaskit & galvanized nuts / bolts complete in all respect.- 100mm i/d
Supply, erection, fixing & testing of DI Double flanged pipe complete with all jointing materials- 100mm i/d
Sluice Valves/ Specials For Rising Mains & W/W - Supplying, fixing, jointing, testing & commissioning of DI sluice valves resilient sheet P.N. 1.6 as per DNIT specification on the pumping machinery & head works including cost of jointing material (IVC / VAG make)- 150 mm i/d
Supply & Fixing of Mechanical Joints PN 1.6 alongwith ruber gaskit & galvanized nuts / bolts complete in all respect.- 150 mm i/d
Supply, erection, testing & commissioning of IS marked copper wire for various motors with underground system in PVC and flexible pipes copper wire 3 core complete in all respevts with accessories like thimble etc.- 10mm 2 core
25mm2 3 Core
Supply erection testing and commissioning of exhaust fans each having a capacity of 45 cubic meters per minutes, complete in all respect. (2 for W/W & 2 for Bstn)
Supply erection & testing of Ceiling fan of size 48" i/d (1200 mm) of reputed ISI make complete in all respect. (2 for W/W & 2 for Bstn)
Providing and fixing of insulated Rubber matting suitable for HKV installation 1 meter x 2 meter x 12 mm as per specification.
Supply erection testing of reputed make LED light 100 wats with fittings and accessories complete in all repects. (4 at B/Stn)
Providing & fixing of D.I. Kinetic Air Valve soft seated as confirming to I.S.I. complete in all respect.- 80mm
Supply erection, testing & commissioning of light fittings including complete wiring alon with all material upto 10 points including switch, button, plug, PVC conduict pipe & copper wire etc. as per approved specifications. ( 2 no. pump chambers of Boosting Stations)
Supply erection testing and commissioning of Flow Meter (KRONE Make) with digital display of 150 mm i/d complete in all respect.
Design, Supply & Erection of copper wound outdoor type Transformers of required KVA as mentioned below on load tap changer of suitable capacity on higher side of standard make outdoor type, VCB Panel, G.O. Switch, H.T. Metering Panels, APFC Panels for Transformer, entire cable network from G.O. Switch to H.T. Metering equipment and from H.T. Metering to Transformer Main to L.T. Panel, Earthing, safety equipment and any other contingent thereto complete in all respect as per DNIT and getting it passed from Chief Electrical Officer including operation & Maintenance of 5 Years.- At W/W 63 KVA
Providing & fixing in position GI elbow ISI marked complete in all respect 15 mm i/d 583 x 4 = 2,332
Providing & fixing in position GI Nipple ISI marked complete in all respect 15mm x150mm /100 mm 583 x 2 = 1,166
Operation & Maintenance - Operation & maintenance for the complete scope of work mentioned in the DNIT (Disinfection material will be supplied by the PHED) as per schedule-IV during Defect liability period of 12 months after trial run period of 3 months & 5 years thereafter. (Will be charged to A/mtc estimate)." - (i) Defect liability period (Operation Only)
(ii) Operation & maintenance during 1st year
(iii) Operation and maintenance during 2nd year
(iv) Operation and maintenance during 3rd year
(v) Operation and maintenance during 4th year
(vi) Operation and maintenance during 5th year
Bidder Name
Amount
Sunil Kumar(GSTN-06BMGPK6616K1ZU)
Krishan Kumar(GSTN-06ATZPK0120H1ZQ)
Jaiveer Singh Contractor(GSTN-06ATQPS8420H1Z8)
Sh. Rajpal Dahiya(GSTN-06AAOPD6073EIZT)
NAFE SINGH CONTRACTOR(GSTN-NA)
Sh. Rajpal Dahiya
Sunil Kumar
Krishan Kumar
NAFE SINGH CONTRACTOR
Sh. Rajpal Dahiya
Sunil Kumar
Jaiveer Singh Contractor
Krishan Kumar
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .