Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC 00 MUKUNDPUR PAHO DOMANPUR MUKUNDPUR PAHO MIRZAPUR UTTAR PRADESH 231306 | MIRZAPUR | UTTAR PRADESH | 231306 | L1 | Accepted-AOC DUE TO L1 | |
| 2 | L2₹2.3 L+₹8,085.02 (3.68%)Rejected-Finance ARGADA RAMGARH JHARKHAND 829101 | RAMGARH | JHARKHAND | 829101 | L2 | Rejected-Finance DUE TO L2 | |
| 3 | Rejected-Technical AT ARGADA DISTT RAMGARH JHARKHAND | - | Rejected-Technical Technically Rejected |
| Sl No | Description | Qty | Unit | M/S VAISHALI ELECTRIC COMPANY L2 | M/S ADITYA ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Cost of Copper wire with DPC covering, Size- 9 SWG for 250 KVA, 11KV/440 V Sl. No.- 26433 Distribution Transformer | 160 | kg | 1,325 ₹2,12,000 | 1,278 ₹2,04,480 Lowest |
| 2.00 | Insulation cost | 1 | No | 31,800 ₹31,800 | 30,672 ₹30,672 Lowest |
| 3.00 | Labour cost | 1 | No | 31,800 ₹31,800 | 30,672 ₹30,672 Lowest |
| 4.00 | Profit | 1 | No | 14,840 ₹14,840 | 14,313.6 ₹14,313.6 Lowest |
| 5.00 | Supply & fixing of HT/LT Bushing Insulator with Studs | 4 | No | 8,549 ₹34,196 | 8,244 ₹32,976 Lowest |
| 6.00 | Supply & fixing of Gaslet/Corksheet | 2 | No | 3,755 ₹7,510 | 3,621 ₹7,242 Lowest |
| 7.00 | Less scrap value | 1 | no | 1,27,200 ₹-1,27,200 | 1,22,688 ₹-1,22,688 Lowest |
| 8.00 | Cost of Copper wire with DPC covering, Size- 9 SWG for 10 KVA, 3.3KV/230 V, Sl. No.- KS/10/22/28 Lighting Transformer | 6.4 | No | 1,325 ₹8,480 | 1,278 ₹8,179.2 Lowest |
| 9.00 | Insulation cost | 1 | No | 1,272 ₹1,272 | 1,226.88 ₹1,226.88 Lowest |
| 10.00 | Labour cost | 1 | No | 1,272 ₹1,272 | 1,226.88 ₹1,226.88 Lowest |
Tender Value
₹2.4 L
EMD Value
₹3,000
Closing Date
14 Jun 2025, 10:00 amClosed
Project Engineer (EnM), Tapin North OCP
Tapin North OCP
Complete repairing and rewinding of 250 KVA, 11 KV/440V, Marson Make, Sl No. 26433 Distribution Transformer and 10 KVA, 3.3 KV/230V, K-Sambhav Powertronics Make, Sl No. KS/10/22/28 Lighting Transformer of TNOCP under Hazaribagh Area.
2025_CCL_336740_1
PE(EnM)/TNOCP/Tender/25-26/11
Open Tender
Electrical and Maintenance Works
Item Rate
10 days
Tapin North OCP
AS PER NIT
2 documents required · 2 mandatory
₹3,000
23 Oct 2025
2 Jun 2025
16 Jun 2025
3 Jun 2025
14 Jun 2025
3 Jun 2025
3 Jun 2025 - 9 Jun 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .