| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.6 LAccepted-AOC | ₹34.6 L | L1 | Accepted-AOC below rate |
| Sl No | Description | Qty | Unit | ENREC ENGINEERS L1 |
|---|---|---|---|---|
| 1.00Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. | ||||
| 1.01 | Upto 2.4m | 106 | cum | 1,755.39 ₹47,483.3 Lowest |
| 1.02 | Upto 3.40 m | 45 | cum | 5,421.32 ₹92,325.08 Lowest |
| 1.03 | upto 4.40m | 45 | cum | 1,081.62 ₹3,27,471.27 Lowest |
| 1.04 | upto 5.00m | 27 | cum | 8,224.7 ₹4,85,257.3 Lowest |
| 2.00 | Supplying and filling in foundation, basement, etc with conveyed earth in layers of not more than 150mm thick layers well watered, rammed with surface vibrator and consolidated including conveyance charges etc. complete complying with standard specification and as directed by the departmental officers. | 2 | cum | 96.8 ₹6,28,135.2 Lowest |
| 3.00 | Cement Concrete 1:4:8 (One cement, Four crushed stone sand and Eight hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying,nsolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete multiplying with standard specification and as directed by the departmental officers. The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers | 2 | cum | 7,532 ₹1,50,640 Lowest |
| 4.00Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, Sill slabs etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner , vertical stiffener, side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid). | ||||
| 4.01 | Sides | 172 | sqm | 268 ₹41,138 Lowest |
| 4.02 | slab | 14 | sqm | 120 ₹74,400 Lowest |
Tender Value
₹41.3 L
EMD Value
₹41,250
Closing Date
19 Feb 2026, 3:00 pmClosed
Commissioner
Azad Road,Karur
Karur Corporation_NNT 25-26 Phase-1_Providing collection well and pipe line arrangements for Waste Water at Tamil Nagar Tamilnadu urban Habitat Developemnt Board Ward15 Zone3 in Karur City Muncipal Corporation
2026_MAWS_644917_10
E1/4288/2025
Open Tender
Civil Works
Item Rate
90 days
KCMC
Pre Quailification and EMD scan Copy
2 documents required · 2 mandatory
₹0
₹41,250
Yes
9 May 2026
14 Feb 2026
19 Feb 2026
14 Feb 2026
19 Feb 2026
14 Feb 2026
14 Feb 2026 - 19 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. | |||||
| 1.01 | Upto 2.4m | 106 | cum | - | - |
| 1.02 | Upto 3.40 m | 45 | cum | - | - |
| 1.03 | upto 4.40m | 45 | cum | - | - |
| 1.04 | upto 5.00m | 27 | cum | - | - |
| 2 | Supplying and filling in foundation, basement, etc with conveyed earth in layers of not more than 150mm thick layers well watered, rammed with surface vibrator and consolidated including conveyance charges etc. complete complying with standard specification and as directed by the departmental officers. | 2 | cum | - | - |
| 3 | Cement Concrete 1:4:8 (One cement, Four crushed stone sand and Eight hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying,nsolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete multiplying with standard specification and as directed by the departmental officers. The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers | 2 | cum | - | - |
| 4Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, Sill slabs etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner , vertical stiffener, side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid). | |||||
| 4.01 | Sides | 172 | sqm | - | - |
| 4.02 | slab | 14 | sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.85 MB
BOQ_789069.xls
BOQ • 0.41 MB
boqnnt.rar
PDF • 0.11 MB
20Corrigentam2.pdf
PDF • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .