| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹13.8 L+₹10,496.40 (0.76%)Rejected-Finance HIJALPUKUR M M DUTTA ROAD HABRA 24 PARAGANS N | HABRA | 24 PARAGANS N | WEST BENGAL | L2 | Rejected-Finance L2 | |
| 3 | L3₹13.9 L+₹11,066.80 (0.81%)Rejected-Finance 6201 M G ROAD KOLKATA 700 009 | KOLKATA | KOLKATA | WEST BENGAL | 700009 | L3 | Rejected-Finance L3 | |
| 4 | Rejected-Technical | - | Rejected-Technical No document submitted in short fall stage |
Tender Value
Refer Docs
EMD Value
₹27,514
Closing Date
30 Apr 2024, 3:00 pmClosed
Executive Enigineer Bidhannagar Electrical Divn
Room No. 108 Purta Bhawan Salt Lake
Temporary Electrification work with Providing DG sets for preparedness of accommodation centres for SPF in connection with Parliamentary Election 2024 Under Bidhannagar North East and South Police Station FOR 26 DAYS
2024_WBPWD_688021_1
WBPWD/EE/BED/e-NIQ-02/2024-25
Open Tender
ELECTRICAL WORKS ORG
Item Rate
7 days
Bidhannagar Police Commissionerate
Please refer Tender documents.
5 documents required · 5 mandatory
₹27,514
15 May 2024
5 Apr 2024
2 May 2024
16 Apr 2024
30 Apr 2024
16 Apr 2024
Amount
CONTROL PANEL AND SWITCHES:- Providing on hire basis following switches etc. and fixing on wooden plank board or suitable angle iron frame incl Providing inter-connection wiring with socketing, earthing attachment etc. and dismantling the same after completion of work (with PWD/E.I.C. approved materials)
415V, 63 amp TPN switch with rewirable fuse (For upto 3 days)
415V, 63 amp TPN switch with rewirable fuse Next 23 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 10 Item x 23 No of Days = 230 Item)
Providing following switches etc. on hire basis and fixing on wooden plank board or suitable angle iron frame incl Providing inter-connection wiring with socketing, earthing attachment etc. and dismantling the same after completion of work (with PWD/E.I.C. approved materials)
415V, 100 amp, Offload Change Over Switch (For upto 3 days)
415V, 100 amp, Offload Change Over Switch Next 23 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 10 Item x 23 No of Days = 230 Item)
(i) Upto 3 Days.
(ii) Next 23 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 10 Item x 23 No of Days = 230 Item)
Providing on hire basis following Distribution boards etc. and fixing on wooden plank board or suitable angle iron frame incl Providing inter-connection wiring with socketing, earthing attachment etc. and dismantling the same after completion of work (with PWD / E.I.C. approved materials)
415V, Upto 6 Way TPNBDB With 1 No. - 63 amp FPMCB as Incoming & 18 No. 6-32 amp SPMCB as Outgoing (For upto 3 days)
415V, Upto 6 Way TPNBDB With 1 No. - 63 amp FPMCB as Incoming & 18 No. 6-32 amp SPMCB as Outgoing Next 23 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 20 Item x 23 No of Days = 460 Item)
240V, 2+12 Way SPNBDB With 6 - 32 amp SPMCB as Outgoing & 40/63 amp DPMCB as Incoming. (For upto 3 days)
240V, 2+12 Way SPNBDB With 6 - 32 amp SPMCB as Outgoing & 40/63 amp DPMCB as Incoming Next 23 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 40 Item x 23 No of Days = 920 Item)
CABLE LAYING:- Providing & drawing on hire basis main wiring with 1.1 KV grade Aluminium Conductor PVC XLPE armoured cable of following sizes including laying in trench (at least 230 mm below ground) including dismantling the same after completion of work and mending good the damages.
4 Core 16 Sq. mm PVC / XLPE armoured cable per meter ( For upto 3 days)
4 Core 16 Sq. mm PVC / XLPE armoured cable per meter (For beyond 3days) Next 23 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 1500 Mtr x 23 No of Days = 34500 Mtr)
2 Core 4 to 10 Sq. mm PVC / XLPE armoured cable per meter (For upto 3days)
2 Core 4 to 10 Sq. mm PVC / XLPE armoured cable per meter (For beyond 3days) Next 23 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 2500 Mtr x 23 No of Days = 57500 Mtr)
Supplying and drawing on Hire basis Three Phase Dist Wiring With 4 x 2.5/ 4/6 Sqmm with Earth Wire (2x 2.5 / 1x4) Sqmm Or its equivalent PVC copper wiring in suitable alkhathene pipe on the hire basis incl. dismantling the same per meter after completion of work.
(i) Upto 3 Days.
(ii) Next 23 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 800 Mtr x 23 No of Days = 18400 Mtr)
Supplying & Drawing on Hire Basis Single Phase Dist Wiring With 2 X 2.5/ 4/6 Sqmm with Earth Wire (1x 2.5 / 1x4) Sqmm Or its equivalent PVC copper wiring in suitable alkhathene pipe on the hire basis incl. dismantling the same per meter after completion of work
(i) Upto 3 Days.
(ii) Next 23 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 12320 Mtr x 23 No of Days = 283360 Mtr)
DISTRIBUTION WIRING WITH GROUP CONTROL:- Distribution wiring in 3x1.5 Sqmm single core PVC copper wire to light/fan points incl. fixing holder, switch and double board etc. complete on hire basis and dismantling the same after completion of work
(i) Upto 3 Days.
(ii) Next 23 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 80 Each x 23 No of Days = 1840 Each)
SWITCH BOARDS:- Supplying & providing/fixing 2 nos. 6A Switch and 2nos. 6A 3pin socket on Hire Basis on suitable size MS/TW Board and dismantling the same after completion of work
(i) Upto 3 Days.
(ii) Next 23 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 200 Each x 23 No of Days = 4600 Each)
Supplying & Providing/fixing on hire basis (3 Nos.) 5 amp plug point on casing board with earthing attachment. (For Mobile Charger and Stand Fan) and dismantling the same after completion of work
(i) Upto 3 Days.
(ii) Next 23 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 200 Each x 23 No of Days = 4600 Each)
FITTINGS & FIXTURE:- Supplying & providing/fixing 100 watt LED Flood light complete on hire basis with bracket and clamps on the pole including dismantling after completion of work incl. replacement of fused lamp (As per direction of E.I.C.)
(i) Upto 3 Days.
(ii) Next 23 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 20 Each x 23 No of Days = 460 Each)
S & providing on hire basis 100/150/200 watt Metal Hallide fittings with necessary clamping arrangement to be fixed on existing wooden/bamboo or on wall incl. gear box & replacement of fuse lamp and dismantling the same after completion of work
(i) Upto 3 Days.
(ii) Next 23 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 20 Each x 23 No of Days = 460 Each)
Supplying & providing/fixing 18/20/22W single/twin LED fitting complete with tube( commercial type) (4 ft) single/twin fitting on hire basis and dismantling the same after completion of work (As per direction of E.I.C.)
(i) Upto 3 Days.
(ii) Next 23 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 400 Each x 23 No of Days = 9200 Each)
Supplying & providing/fixing pendent light fittings with 18 watt LED lamp holder shade etc. complete on hire basis including dismantling the same after completion of work
(i) Upto 3 Days.
(ii) Next 23 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 400 Each x 23 No of Days = 9200 Each)
FAN:- Supplying & providing/fixing 240v A.C. 1200 mm / 48" sweep ceiling fan with down rod as required on hire basis & dismantling the same after completion of work
(i) Upto 3 Days.
(ii) Next 23 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 300 Each x 23 No of Days = 6900 Each)
Supplying & providing/ fixing 240V A.C. 450 mm/18" sweep Pedestal fan on hire basis and dismantling the same after completion of work
(i) Upto 3 Days.
(ii) Next 23 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 50 Each x 23 No of Days = 1150 Each)
Earthing:- Providing Earthing arrangement on hire basis with 50 mm dia GI Pipe 2.5 to 3 mtrs long and 6/8 SWG GI wire with galvanized nuts and bolts washer etc. below ground level on hire basis and dismantling the same after completion of work
(i) Upto 3 Days.
(ii) Next 23 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 40 Each x 23 No of Days = 920 Each)
DG SET:- Supplying & providing & connecting with Existing electrical panel (With appropriate cable supplied by Contractor) on hire basis different KVA Three phase DG set of Following Ratings and dismantling the same after completion of work, excluding fuel charges
10 KVA Three phase (1 no DG) (for 3 days)
10 KVA Three phase for each single day more than 3 days (1 No DG)
Deployment of Man Power:- Deployment of One no. Electrician for each shift i.e. for 3 shift for caring out all kind of El maintenance & DG operations etc.
HSD for DG Set:- Supply & Pouring of HSD for the hired DG set incl handling cost. (For 10 days) (N.B. GST is not applicable on this item) Allowable consumption of HSD per 10kVA DG set per day i) 3 ltrs per Hrs x 2 hrs per day.
Note:- 1) Rate should be inclusive of all taxes, duties & CESS etc including GST which will not be paid extra (on Item No. 01.00 to 20.00). 2) The bidder is bound to quote exact unit rate maximum upto 2% of the base rate of 1st 3 days per day calculated upto 2nd decimal value as required against Item SI. Nos. 01.02, 02.02, 03.02, 4.02, 04.04, 05.02, 5.04, 06.02, 07.02, 08.02, 09.02, 10.02, 11.02, 12.02, 13.02, 14.02, 15.02, 16.02 & 17.02 as spelt out in the BOQ deviation from which will cause the rejection of the bid. 3) The bidder will have to quote the fuel rate based on the market rate on the date of bidding. 4) The cost of fuel may be charged depending on the actual cost of fuel consumed during the time of execution of work. Log book to be maintained strictly on daily basis. 5) No compensation will be allowed to the agency In case of any loss/ damage of the temporary electrical installations including DG sets.
CHATTERJEE ELECTRICALS
SUMAN ENTERPRISE
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .