Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹83.7 LAccepted-Finance DOON VALLEY UTTARAKHAND UT | ALMORA | UTTARAKHAND | 263601 | ₹83.7 L | L1 | Accepted-Finance L1 |
| 2 | L2₹89.1 L+₹5.4 L (6.48%)Accepted-Finance | ₹89.1 L+₹5.4 L (6.48%) | L2 | Accepted-Finance L2 |
| 3 | L3₹93.9 L+₹10.3 L (12.3%)Accepted-Finance BADI BARGICHA ALMORA DISTRICT UTTARAKHAND | ALMORA | UTTARAKHAND | 263601 | ₹93.9 L+₹10.3 L (12.3%) | L3 | Accepted-Finance L3 |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
| Sl No | Description | Qty | Unit | Mahesh Chandra Sanwal L3 | GOLJU CONSTRUCTION L1 | pan singh L2 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical / manual means in foundation trenches or drains i/c lift upto 1.5 m, i/c disposal of surplus excavated soil within a lead of 50 m. | 119.84 | cum | 199.5 ₹23,908.08 | 188 ₹22,529.92 | 150 ₹17,976 Lowest |
| 2.00 | Filling available excavated earth in trenches, plinth in layers consolidating by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 39.99 | cum | 150.22 ₹6,007.3 | 145 ₹5,798.55 Lowest | 156 ₹6,238.44 |
| 3.00 | P/L in position CC 1:4:8 (1 Cement : 4 c/sand : 8 st. agg. 40 mm size) excluding the cost of c/shuttering - All work upto plinth level. | 178.46 | cum | 5,220.99 ₹9,31,737.88 | 4,920 ₹8,78,023.2 Lowest | 5,425 ₹9,68,145.5 |
| 4.00 | P/L in position RCC 1:1.5:3 (1 cement : 1.5 c/sand : 3 stone agg. 20 mm size) ex. the cost of c/shuttering, finishing and reinf. - All work upto plinth level (in foundation). | 17.77 | cum | 6,933.03 ₹1,23,199.94 | 6,590 ₹1,17,104.3 Lowest | 7,205 ₹1,28,032.85 |
| 5.00 | RCC work 1:1.5:3 (1 cement : 1.5 c/sand :3 stone agg. 20 mm size) in walls (any thickness), all work above i.e. columns, etc. ex. cost of c/shuttering, finishing and reinf. | 4.32 | cum | 8,318.15 ₹35,934.41 | 7,900 ₹34,128 Lowest | 8,645 ₹37,346.4 |
| 6.00 | RCC work 1:1.5:3 beams,s/shades,shelf ,stair case,door bend and suspended slabs etc. ex. cost of c/shuttering, finishing and reinf. | 15.91 | cum | 8,818.28 ₹1,40,298.83 | 8,300 ₹1,32,053 Lowest | 9,165 ₹1,45,815.15 |
| 7.00 | Centering and shuttering i/c strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concrete. | 96.55 | sqm | 300.56 ₹29,019.07 | 285 ₹27,516.75 | 275 ₹26,551.25 Lowest |
| 8.00 | Centering and shuttering i/c strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform. | 88.38 | sqm | 710.69 ₹62,810.78 | 675 ₹59,656.5 | 500 ₹44,190 Lowest |
| 9.00 | Centering and shuttering i/c strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers. | 53.37 | sqm | 564.41 ₹30,122.56 | 535 ₹28,552.95 | 475 ₹25,350.75 Lowest |
| 10.00 | Centering and shuttering i/c strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts. | 57.6 | sqm | 736.78 ₹42,438.53 | 700 ₹40,320 | 650 ₹37,440 Lowest |
Tender Value
₹1.0 Cr
EMD Value
₹2.1 L
Closing Date
3 Apr 2026, 3:00 pmClosed
EE RWD ALMORA
office of EE RWD Almora
construction and repair of salam shaheed smarak under CMG 370 2024
2026_RES_93486_1
1833 dated 10-03-2026
Open Tender
Civil Works - Buildings
Item Rate
365 days
lamgarah
construction and repair of salam shaheed smarak under CMG 370 2024
3 documents required · 3 mandatory
₹4,720
Yes
EE RWD ALMORA
₹2.1 L
Yes
8 Apr 2026
23 Mar 2026
3 Apr 2026
23 Mar 2026
3 Apr 2026
23 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical / manual means in foundation trenches or drains i/c lift upto 1.5 m, i/c disposal of surplus excavated soil within a lead of 50 m. | |||||
| 2Filling available excavated earth in trenches, plinth in layers consolidating by ramming and watering, lead up to 50 m and lift upto 1.5 m. | |||||
| 3P/L in position CC 1:4:8 (1 Cement : 4 c/sand : 8 st. agg. 40 mm size) excluding the cost of c/shuttering - All work upto plinth level. | |||||
| 4P/L in position RCC 1:1.5:3 (1 cement : 1.5 c/sand : 3 stone agg. 20 mm size) ex. the cost of c/shuttering, finishing and reinf. - All work upto plinth level (in foundation). | |||||
| 5RCC work 1:1.5:3 (1 cement : 1.5 c/sand :3 stone agg. 20 mm size) in walls (any thickness), all work above i.e. columns, etc. ex. cost of c/shuttering, finishing and reinf. | |||||
| 6RCC work 1:1.5:3 beams,s/shades,shelf ,stair case,door bend and suspended slabs etc. ex. cost of c/shuttering, finishing and reinf. | |||||
| 7Centering and shuttering i/c strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concrete. | |||||
| 8Centering and shuttering i/c strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform. | |||||
| 9Centering and shuttering i/c strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers. | |||||
| 10Centering and shuttering i/c strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts. | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_110661.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.51 MB
Tendernotice_2.pdf
PDF • 3.86 MB
BOQ_110661.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .