Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹53.5 LAccepted-AOC 1098 BAZAR KHOHAL GORAKHPUR UTTAR PRADESH | L1 | Accepted-AOC L1 | |
| 2 | L2₹60.0 L+₹6.5 L (12.2%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹63.8 L+₹10.4 L (19.4%)Rejected-Finance SHRI CHANDRAPAL SINGH VILLAGE BADRADURPUR POST KHEDA BUJURG DISTRICT ALIGARH | ALIGARH | UTTAR PRADESH | 202001 | L3 | Rejected-Finance L3 | |
| 4 | L4₹66.3 L+₹12.8 L (24.0%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹71.2 L+₹17.8 L (33.3%)Rejected-Finance | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | RAJENDRA SINGH L1 | CHANDRA PAL SINGH L3 | SS BUILDERS AND CONSULTANT L5 | M/S VEERA EXCLUSIVE L2 | NITISH AGARWAL L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00Laying and Jointing PVC Pipe. Heading | ||||||||
| 1.01 | Supply, Filling & Placing of GEO bags made of 240 GSM woven fabric confirming to IS 15351 (2015) 0f 1.05 mx0.69m after filling volume 0.125 cum filled with earth i/c cost of material carriage loading, unloading, stacking, all taxes etc. required for completion of work. | 11,493 | Nos. | 152 ₹17,46,936 Lowest | 187.85 ₹21,58,960.05 | 215 ₹24,70,995 | 175 ₹20,11,275 | 200 ₹22,98,600 |
| 1.02 | Supply of HDPE gabion rope case size 1.80 X 1.80 X 0.50 m, i/c cost of material carriage loading, unloading, stacking, all taxes etc. required for completion of work. | 986 | Nos. | 1,250 ₹12,32,500 Lowest | 1,748.7 ₹17,24,218.2 | 2,000 ₹19,72,000 | 1,500 ₹14,79,000 | 1,860 ₹18,33,960 |
| 1.03 | Supplying and laying mechanically woven double twisted Hexagonal shaped wire mesh gabion box/wire crate of size 3.00x1.5x1.00 m. with mesh size 10cmx12cm 10 SWG G.I. Wire | 142 | Nos. | 3,400 ₹4,82,800 | 3,360.9 ₹4,77,247.8 | 2,900 ₹4,11,800 | 3,500 ₹4,97,000 | 2,750 ₹3,90,500 Lowest |
| 1.04 | Supplying, Placing and packing of Boulders (20 to 40 Kg.) wt. in G.I. Wire crate Size (3.00x1.50x1.00 M) with placing in position i/c all cost of material, labour, carriage, T&P etc. | 639 | Cum. | 2,000 ₹12,78,000 | 1,968.03 ₹12,57,571.17 | 2,150 ₹13,73,850 | 1,900 ₹12,14,100 Lowest | 2,000 ₹12,78,000 |
| 1.05 | Supplying and laying RBM including cost of all material, labour and T&P etc. complete | 437 | Cum. | 1,250 ₹5,46,250 Lowest | 1,590.35 ₹6,94,982.95 | 1,850 ₹8,08,450 | 1,650 ₹7,21,050 | 1,700 ₹7,42,900 |
| 1.06 | Earth work for making Turning platform i/c cost of all material, labour and T&P etc. complete | 419 | Cum. | 140 ₹58,660 Lowest | 170.4 ₹71,397.6 | 208 ₹87,152 | 180 ₹75,420 | 205 ₹85,895 |
Tender Value
₹74.5 L
EMD Value
₹1.5 L
Closing Date
17 Mar 2026, 12:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer Irrigation Work Circle Tubewell colony Moradabad
LOT 04 Janpad Rampur ki Tahsil Swar mein Kosi nadi ke bayen kinare par gram Dhanauri ke sameep sthit Lalpur Dhanauri tatbandh ke km 14.485 se km 15.145 ke madhya baadh se suraksha hetu katav nirodhak karya.
2026_UPIDC_1122949_4
04/SEIWC/2025-26
Open Tender
Civil Works
Item Rate
90 days
RAMPUR
AS PER NIT
2 documents required · 2 mandatory
₹2,354
₹1.5 L
10 Apr 2026
9 Mar 2026
17 Mar 2026
9 Mar 2026
17 Mar 2026
9 Mar 2026
Laying and Jointing PVC Pipe. Heading
Supply, Filling & Placing of GEO bags made of 240 GSM woven fabric confirming to IS 15351 (2015) 0f 1.05 mx0.69m after filling volume 0.125 cum filled with earth i/c cost of material carriage loading, unloading, stacking, all taxes etc. required for completion of work.
Supply of HDPE gabion rope case size 1.80 X 1.80 X 0.50 m, i/c cost of material carriage loading, unloading, stacking, all taxes etc. required for completion of work.
Supplying and laying mechanically woven double twisted Hexagonal shaped wire mesh gabion box/wire crate of size 3.00x1.5x1.00 m. with mesh size 10cmx12cm 10 SWG G.I. Wire
Supplying, Placing and packing of Boulders (20 to 40 Kg.) wt. in G.I. Wire crate Size (3.00x1.50x1.00 M) with placing in position i/c all cost of material, labour, carriage, T&P etc.
Supplying and laying RBM including cost of all material, labour and T&P etc. complete
Earth work for making Turning platform i/c cost of all material, labour and T&P etc. complete
stage.html
html • 0.05 MB
techsummary_2091803.pdf
BOQ Comparative Chart
xlsx
finsummary_2091803.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.06 MB
BOQ_2091803.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .