| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹24.6 LAccepted-AOC | 1 | Accepted-AOC Agreement executed by him | |
| 2 | 2₹25.9 L+₹1.3 L (5.31%)Rejected-AOC | 2 | Rejected-AOC Second lowest | |
| 3 | 3₹26.4 L+₹1.8 L (7.45%)Rejected-Finance 869B INDIAN CENTRIFUGE ENGINEERING SOLUTIONS PRIVATE LIMITED ETTUMANOOR KOTTAYAM KOTTAYAM KERALA 686631 | KOTTAYAM | KERALA | 686631 | 3 | Rejected-Finance third lowest |
Tender Value
₹27.6 L
EMD Value
₹41,400
Closing Date
17 Sept 2021, 3:00 pmClosed
Executive Engineer
Office of the Executive Engineer, Sabarimala Development Project, TDB Building, Kumbazha Road, Pathanamthitta
S.D.P Pamba-M and M festival in 1197 ME. Disposal of garbages at Pamba.Overhauling and operation of Incinerator Unit II and III including supply of spares and labour.(New Incinerator.)
2021_TDB_438423_1
SDP/EE/ET-45/21-22
Open Tender
Civil Works - Others
Item Rate
90 days
Pamba
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,950
₹41,400
7 Feb 2023
9 Sept 2021
20 Sept 2021
9 Sept 2021
17 Sept 2021
9 Sept 2021
Amount
APPENDIX A Maintenance to the droplet separator unit of each Incinerator by dismantling the unit from the incinerator assembly , and de-ashing the same using suitable chemical solution, Re assembling the unit using new high quality gasket, nuts, bolts and painting using heat resistant hammer tone painting .The work includes repairing and cleaning of ‘U’ bend connecting the droplet separator with ID fan consumables.
Maintenance to the ventury scrubbing unit of each incinerator by dismantling all the water inlet connections from the unit, cleaning the spray nozzles, inside surface, damper mechanism, thermo well and re assembling the unit using new gaskets, nuts bolts etc. the defective gaskets, nuts bots , . The rate inclusive all taxes cost of consumables etc.
Dismantling, overhauling, cleaning, and minor repair works to the FD fan assembly .The work includes complete cleaning of the impeller, motor, coupling and re assembling , and necessary patch work to the casing and painting . The rate inclusive of all taxes transportation and cost of consumables.
Maintenance, repairing and complete overhauling of primary chamber. (2 set) Cleaning the refractory lined furnace walls, arch, Patch work to the refractory lining and insulation layer using fire create cement ,bricks etc , making good the refractory lined charging door and ash doors using castables, and ceramic wool. The rate also includes complete painting (2 coats) of primary chamber out surface using heat resistant aluminium paint. The rates inclusive of all taxes, charges for tools and tackles, consumables and transportation charges.
Maintenance, repairing and complete overhauling of secondary chamber . (2 set)Cleaning the refractory lined furnace walls, arch, Patch work to the refractory lining and insulation layer using fire create cement ,bricks etc , making good the refractory lined ash doors using castables, and ceramic wool. The rate also includes complete painting (2 coats)of secondary chamber out surface using heat resistant aluminium paint. The rates inclusive of all taxes, charges for tools and tackles, consumables and transportation charges.
Dismantling of horizontal refractory lined duct connecting the secondary chamber with ventury scrubber , removing the defective refractory layer form the duct, cleaning and re casting the duct using refractory cement (grade whytete/K). the work also includes providing necessary ‘Y’ type jagers inside the surface for strengthening the refractory lining. The rate inclusive of all taxes cost of consumables , all tools , tackles , like tri-pole for lifting the duct.
Complete dismantling of mono -bloc burner assembly in primary and secondary chamber for the incinerators, cleaning of electrodes, solenoid valves, blower fans, transformer, burner rod, nozzle, photocell, sight glass, diffuser plate, cone etc., Reassembling and tuning of burner assembly for proper combustion of system. The rate inclusive of all taxes.
Labour charges for cleaning of fuel day tank, fuel lines, fuel filter , Rectification of leakages to the fuel line, valves, fuel pump, Replacement of gland packing, gaskets, oil seal for both the incinerators . The rate is inclusive of all taxes etc
Labour charges for checking and necessary repairs of control panel board and related parts of Incinerator ensuring perfect and trouble free operation of all switches, contactors, OLR, MCBs, fuses, sequence controller, temperature controller, RTD, thermocouple, motors, photocell, visual and alarm monitors, limit switches, indication lamps, etc. and cleaning of all terminals using Carbon tetra chloride, painting of panel board.
Dismantling overhauling cleaning and minor repair works to the ID fan assembly. The work includes reassembling the blower unit, motor, shaft, impeller, bearing block, in proper alignment and carrying out necessary cleaning and surface finishing for the outer casing, , necesssary patch work to the casing and repainting using heat resistant hammer tone paint and labour charges for replacing of bearings ,greasing of bearing and dyanamic balancing of impeller .The rate inclusive of all taxes transportation and cost of consumables.
APPENDIX B - Spare Parts Thermocouple K Type (For primary chamber)
Thermocouple KER 710 (For secondary chamber)
Nozzle
V Belt B-97
RTD assembly for ventury outlet
Electrode Assembly
Hose Metallic Braided 3/8 x 40
Digital Temperature Controller 0-1200degC
Contactor 32 A,230 V coil
Contactor 12 A ,230 V coil
Overload Relay 14-23A
Overload Relay 4.5-6.5A
Overload Relay 1.4-2.3A
Coupling with spider bushL075
Roller bearing 1312 K
Sleeve H312
Star /delta timer
Fuel filter 0.5 litre
APPENDIX C - Labour Charges Engaging overall BANDHANI for 67days. (1 No. /shift for 3 shifts/day) (3*67=201 Nos.)
Engaging Scavanger for loading of garbages into the incinerator for 67 days.(2 Nos. of machines) (3 Nos./shift for 3 shifts/day /machine) (3*3*67*2)=1206 Nos.)
Engaging Scavanger to segregate bio-degradable waste and plastic materials from the garbages for 67 days. (5 Nos./shift for 3 shifts/day) (5*3*67)=1005 Nos.)
CINZAC ENGINEERS (INDIA) PVT LTD
Indian Centrifuge Engineering Solutions Private Limited
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_623300.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .