| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.7 L+₹16,124.20 (3.59%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹4.8 L
EMD Value
₹12,000
Closing Date
6 Dec 2019, 6:00 pmClosed
Assistant Executive Engineer
Minor Irrigation Sib Division Aluva
Annual maintenance of Uliyannoor and Kadungalloor L I Schemes under M.I Section Aluva for 2019-20 including cleaning of suction pit and canals.
2019_Irrig_325621_2
AEE/MISDN/ALY/15/ET/2019-20/S
Open Tender
Civil Works - Lift Irrigation Schemes
Item Rate
240 days
Aluva
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,100
Yes
online
₹12,000
Yes
24 Mar 2020
29 Nov 2019
7 Dec 2019
29 Nov 2019
6 Dec 2019
29 Nov 2019
29 Nov 2019 - 6 Dec 2019
Amount
Appendix-A 2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared etc complete as per the direction of departmental officers at site
2.6.1 : Earth work excavation in all classes of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, with all leads and lifts, disposed earth to be levelled and neatly dressed etc complete as per the direction of departmental officers at site
Appendix B 2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared etc complete as per the direction of departmental officers at site
2.6.1 : Earth work excavation in all classes of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, with all leads and lifts, disposed earth to be levelled and neatly dressed etc complete as per the direction of departmental officers at site
od24449/2019_2020/IA : Engaging manmazdoor for levelling the rubble work etc complete as per the direction of departmental officers at site
5.1.3 : Providing and laying in position specified grade of reinforced cement concrete 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size), excluding the cost of centering, shuttering, finishing and reinforcement all work up to plinth level etc complete as per the direction of departmental officers at site
5.22.1 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelMild steel and Medium Tensile steel bars l etc complete as per the direction of departmental officers at site
4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns l etc complete as per the direction of departmental officers at site
50.2.25.1 : Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m l etc complete as per the direction of departmental officers at site
50.10.2 : Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers l etc complete as per the direction of departmental officers at site
od48631/2019_2020/IA : Supplying and fixing plastic mesh to G I pipe frame including cost and conveyance of materials and labour charges etc complete
4.1.8 : Providing and laying in position cement concreteof specified grade 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) excluding the cost of centering and shuttering all work up to plinth level etc complete as per the direction of departmental officers at site.
4.1.5 Providing and laying in position cement concrete of specified grade 1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size excluding the cost of centering and shuttering all work up to plinth leve etc complete as per direction of of the departmental officers at site.
4.1.3 Providing and laying in position cement concrete of specified grade 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) excluding the cost of centering and shuttering all work up to plinth level etc complete as per the direction of departmental officers at site
13.16.1Providing and laying 6 mm thick cement plaster of mix:1:3 ( 1 cement : 3 fine sand) including labour charges,cost of all materials etc complete as per the direction of departmental officers at site.
WILSON THOMAS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_451039.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .