| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.8 LAccepted-AOC | ₹24.8 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹25.7 L+₹93,465 (3.78%)Rejected-Finance DOOR NO 15 1 141 BHAVANA ENCLAVE 1 NEAR HOTEL GRAND BAY MAHARANIPETA NOWAROJI ROAD VISAKHAPATNAM 530002 | VISAKHAPATNAM | VISAKHAPATNAM | ANDHRA PRADESH | 530002 | ₹25.7 L+₹93,465 (3.78%) | L2 | Rejected-Finance Being not L1 |
| 3 | L3₹26.0 L+₹1.3 L (5.24%)Rejected-Finance ASHOKA PARK PALLAVA PARK BVT INS VISHWAKARMA INDIAN NAVY OF GE ND VISAKHAPATNAM | VISAKHAPATANAM | ANDHRA PRADESH | 530001 | ₹26.0 L+₹1.3 L (5.24%) | L3 | Rejected-Finance Being not L1 |
| 4 | L4₹26.3 L+₹1.5 L (6.05%)Rejected-Finance | ₹26.3 L+₹1.5 L (6.05%) | L4 | Rejected-Finance Being not L1 |
| 5 | L5₹29.0 L+₹4.3 L (17.3%)Rejected-Finance D NO LIG 98 RAJEEV NAGAR KURMANNAPALEM VISAKHAPATNAM 530 048 | VISAKHAPATANAM | ANDHRA PRADESH | 530048 | ₹29.0 L+₹4.3 L (17.3%) | L5 | Rejected-Finance Being not L1 |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
14 May 2021, 6:00 pmClosed
Garrison Engineer Utility-I Visakhapatnam
Garrison Engineer Utility-I Near Samudrika Naval Base Post Visakhapatnam -530 014
MANNING AND OPERATION FOR HT 11 KV SUB STATION 104 AREA, M GEDDA AND 32 WEU/HFDF INCLUDING DG SET UNDER AGE E/M NO.II OF GE(UTILITY-I), VISAKHAPATNAM
2021_MES_438085_1
8307/E8
Open Tender
Electrical and Maintenance Works
Item Rate
330 days
Garrison Engineer Utility-I Visakhapatnam
CLASS D
10 documents required · 10 mandatory
₹500
Garrison Engineer Utility-I
₹80,000
Yes
13 Jul 2021
23 Apr 2021
20 May 2021
23 Apr 2021
14 May 2021
8 May 2021
Amount
Manning and operation for of HT 11 KV sub-station at 104 Area routine maintenance of HT feeders from MRS 9IRSD, HT VCBs , HT structures, RMUs, back up protection, Battery bank system, RMUs, distribution transformers etc located at 104 Area/ SVN colony/Nirman Park areas and electrical breakdowns to external electric supply network from 11 KV MRS to 11 KV/0.433 KV sub-stns, routine maintenance includes minor replacments like fuses, jumpers, insulation taping, applying petroleum jelly, termination of burnt LT cables of transformers out goining by using lugs etc of entire 104 Area/ SVN colony/Nirman Park area for smooth and trouble free operation round the clock in three shifts per day including Sundays and holidays complete all as specified and as directed by Engineer-in-Charge.
One skilled electrician in each shift
One semi skilled electrician in each shift
NOTE : The rate shall also include the following: (i) Any additional manpower for early restoration of supply is deemed to be included in the quoted rate. (ii) HT Complaints should be attended with in 30 min and rectification should be recorded. Necessary transportation should be provided by the contractor and the rate quoted is deemed to be included in Quoted rate. (iii) The rate quoted deemed to be inclusive of HT overheadlines binding with new wire, aluminium lugs, HT insulation taping, petroleum jelly complete .(iv) The rate quoted deemed to be inclusive of suitable capacity tinned copper HT fuse wires, HT discharge rod telescopic type -03 Nos, 11 KV tested HT Hand gloves -03 Nos at each location. (v) HT OH lines from respective APEPDCL sub station to take over point mentioned above to be patrolled once in a month for preventive breakdowns.(vi) Cost of minor consumables such as RYB indication lamps, PG clamps, PVC insulation tape, screws, washers, nails, teflon tape, fuse wire, clips, bolts, nuts etc for day to day maintenance and repairs.
(vii) Complaint register, log books, Job cards, safety shoes, helmet and transportation. (viii) Taking care of house keeping environmental cleanliness, cutting grass, small plants etc., and surrounding area of installation all round up to 10 meters shall be keep absolutely neat and clean. (ix) One emergency light and necessary tools should be available in a tool box with operator for smooth functioning.
Manning and operation for HT 11 KV sub-station 32 WEU/ HFDF area including DG sets, monitoring of HT take over point from APEPDCL and routine maintenance of HT structures, back up protection,LT distribution panel boards,external electric supply network of 11 KV and connected switch controls up to main distribution boards at buildings, distribution transformers, Power factor Control Panels, street light feeders and all other connected switchgears etc located at 32WEU/ HFDF area , including attending electrical breakdowns to external electric supply network from 11 KV MRS to 11 KV/0.433 KV sub-stns and connected switch controls up to main distribution boards at buildings, HT structures,HT over head lines,transformers, back up protection, street light feeders and all other connected items; routine maintenance includes minor replacments like fuses, jumpers, insulation taping, applying petroleum jelly, termination of burnt LT cables using lugs and tightening of busbars/terminations etc of entire 132WEU/ HFDF area for smooth and trouble free operation round the clock in three shifts per day including Sundays and holidays complete all as specified and as directed by Engineer-in-Charge.
One skilled electrician in each shift
One semi skilled electrician in each shift
NOTE :- (i) HT OH lines from respective APEPDCL sub station to take over point mentioned above to be patrolled once in a month for preventive breakdowns.Additnal manpower required for the same is deemed to be included in the quoted rate. Necessary transportation should be provided by the contractor and the rate quoted is deemed to be included in per shift rate. (ii) The rate quoted deemed to be inclusive of suitable capacity tinned copper HT fuse wires, HT discharge rod telescopic type -03 Nos, 11 KV tested HT Hand gloves -03 Nos at each location. (iii) The operator shall ensure by trail run and be alert to run the DG Set with in 1 min of supply failure.
(iv) The contractor shall be responsible for maintaining the complete area (i.e. inside boundary wall ) such as building/ DG Set area, lawn, garden, outside the bay yard , hard standing , foot path etc in neat and clean condition. (v) The DG Set if operated through a AMF panel the contractor shall ensure operation automatically with 2 seconds of supply failure. (vi) Filling of acid and distilled water in battery whenever required for smooth running of Gen set is to be done by the contractor.
(vii) The operator shall maintain log sheet for DG set and record hourly reading of supply parameters and breakdown details as directed by Engr in charge (viii) (a) HSD oil required for running DG Set will be issued under Schedule ‘B’ free for filling which will be made available at site by Department. (b) It is the contractor’s responsibility to maintain the minimum reserve of oil in tank at any time and as directed by EIC. (c) Necessary Men power required to load the HSD oil at Store yard and to unload the HSD Oil at site shall be arranged by contractor and the rate quoted shall include for the same.
SRIESWARI ENTERPRISES
GS ENGINEERS
GANGA SURAJ ENTERPRISES
MONITOR ENGINEERING WORKS
MVV Prasad
GVS ASSOCIATES
c devender reddy and co
M/s SS Engineering Enterprises
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .