Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.2 LAdmitted-Finance | +26.00% | ₹8.2 L | L1 | Admitted-Finance |
Tender Value
₹6.5 L
EMD Value
₹13,018
Closing Date
2 May 2026, 5:00 pmClosed
Registrar, NIT Agartala
NIT Agartala
As per tender document
2026_NITA_905008_1
08/NITA/Estate/2025-26
Open Tender
Civil Works
Works
120 days
NIT Agartala
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Yes
The Registrar, NIT Agartala
₹13,018
Yes
19 Jun 2026
10 Apr 2026
4 May 2026
10 Apr 2026
2 May 2026
10 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: | - | - | - | - |
| - | All kinds of soil | - | sqm | - | - |
| - | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. | - | - | - | - |
| - | All kinds of soil | - | cum | - | - |
| - | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | - | cum | - | - |
| - | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 1 | cum | - | - |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | - | - | - | - |
| - | 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| - | Centering and shuttering including strutting, propping etc. and removal of form work for : | - | - | - | - |
| - | Foundations, footings, bases for columns | - | sqm | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
3OutdoorGYM2.pdf
Tender Documents • 29.73 MB
BOQ_951302.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .