| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.5 LAdmitted-Finance | ₹12.5 L | L1 | Admitted-Finance |
| 2 | L2₹13.7 L+₹1.2 L (9.79%)Admitted-Finance | ₹13.7 L+₹1.2 L (9.79%) | L2 | Admitted-Finance |
| 3 | L3₹13.7 L+₹1.2 L (9.79%)Admitted-Finance | ₹13.7 L+₹1.2 L (9.79%) | L3 | Admitted-Finance |
| 4 | L4₹13.8 L+₹1.3 L (10.4%)Admitted-Finance | ₹13.8 L+₹1.3 L (10.4%) | L4 | Admitted-Finance |
| 5 | L5₹16.4 L+₹3.9 L (31.0%)Admitted-Finance | ₹16.4 L+₹3.9 L (31.0%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | CHANDRA MOHAN BORAH L1 | Swaraj Infrastructure L2 | ANIL KUMAR SINGH L5 | AMAR BORA L7 | KADIR ALI L3 | Pitambar Bora L6 | P.G.ENTERPRISES L4 | GDB Engineering L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Construction works | |||||||||||
| 1.01 | Complete clearing and grubbing of the construction site, including removal of all existing vegetation and debris. Segregation and off-site relocation of all old substation equipment and vehicles (e.g., ground wires, cables, angles, hydra-crane, tractors) to a designated area outside the construction zone. | 1 | job | 10,000 ₹10,000 | 19,967 ₹19,967 | 49,000 ₹49,000 | 5,000 ₹5,000 Lowest | 16,069.4 ₹16,069.4 | 45,500 ₹45,500 | 50,000 ₹50,000 | 61,750 ₹61,750 |
| 1.02 | Earth work in excavation by mechanical means (Hydraulic excavator)/
manual means over areas (exceeding 30 cm in depth, 1.5 m in width as
well as 10 sqm on plan) including getting out and disposal of excavated
earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.
2.6.1 All kinds of soil | 37.32 | cum | 300 ₹11,196 | 120 ₹4,478.4 Lowest | 165.2 ₹6,165.26 | 150 ₹5,598 | 150.42 ₹5,613.67 | 320.32 ₹11,954.34 | 127.38 ₹4,753.82 | 190 ₹7,090.8 |
| 1.03 | Providing and laying in position cement concrete of specified grade
excluding the cost of centering and shuttering - All work up to plinth level : | 2.89 | cum | 5,000 ₹14,450 | 6,500 ₹18,785 | 5,900 ₹17,051 | 6,550 ₹18,929.5 | 5,616.68 ₹16,232.21 | 5,460 ₹15,779.4 | 4,236.71 ₹12,244.09 Lowest | 6,175 ₹17,845.75 |
| 1.04 | One Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 8.35 | cum | 5,370 ₹44,839.5 | 7,100 ₹59,285 | 6,200 ₹51,770 | 6,500 ₹54,275 | 5,451.72 ₹45,521.86 | 6,188 ₹51,669.8 | 4,236.71 ₹35,376.53 Lowest | 6,460 ₹53,941 |
| 1.05 | Centering and shuttering including strutting, propping etc. and removal
of form work for :
4.3.1 Foundations, footings, bases for columns | 66.02 | sqm | 200 ₹13,204 | 200 ₹13,204 | 350 ₹23,107 | 310 ₹20,466.2 | 222.21 ₹14,670.3 | 318.5 ₹21,027.37 | 190.93 ₹12,605.2 | 190 ₹12,543.8 Lowest |
| 1.06 | 4.3.3 Columns, piers, abutments, pillars, posts and struts | 133.23 | sqm | 200 ₹26,646 | 250 ₹33,307.5 | 259.6 ₹34,586.51 | 450 ₹59,953.5 | 580.34 ₹77,318.7 | 318.5 ₹42,433.76 | 498.64 ₹66,433.81 | 190 ₹25,313.7 Lowest |
| 1.07 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D or more. | 3,009.37 | kg | 73 ₹2,19,684.01 | 70 ₹2,10,655.9 | 82 ₹2,46,768.34 | 60 ₹1,80,562.2 | 64.69 ₹1,94,676.15 | 74.62 ₹2,24,559.19 | 58.56 ₹1,76,228.71 Lowest | 104.5 ₹3,14,479.17 |
| 1.08 | Providing and laying in position specified grade of reinforced cement
concrete, excluding the cost of centering, shuttering, finishing and
reinforcement - All work up to plinth level :
5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural
sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 26.72 | cum | 5,500 ₹1,46,960 | 7,000 ₹1,87,040 | 6,500 ₹1,73,680 | 7,150 ₹1,91,048 | 6,035.6 ₹1,61,271.23 | 6,006 ₹1,60,480.32 | 5,185.8 ₹1,38,564.58 Lowest | 7,125 ₹1,90,380 |
| 1.09 | Providing and laying damp-proof course 40mm thick with cement
concrete 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural
sources : 4 graded stone aggregate 12.5mm nominal size derived from
natural sources) | 14.81 | sqm | 350 ₹5,183.5 | 250 ₹3,702.5 | 212.4 ₹3,145.64 Lowest | 340 ₹5,035.4 | 267.59 ₹3,963.01 | 364 ₹5,390.84 | 229.93 ₹3,405.26 | 332.5 ₹4,924.33 |
Tender Value
₹20.2 L
EMD Value
₹41,000
Closing Date
6 Jun 2026, 12:00 pmClosed
Deputy General Manager, Tezpur TnT Circle, AEGCL
Deputy General Manager Tezpur TnT Circle, Sonitpur 784154, Assam
Construction of New Open Shed cum Store Building at 132/33kV Depota GSS, AEGCL
2026_AEGCL_52362_1
NIT 323 Dated 16/05/2026
Open Tender
Civil Works
Works
180 days
Kunderbari
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Yes
₹41,000
Yes
30 Jun 2026
16 May 2026
10 Jun 2026
16 May 2026
6 Jun 2026
16 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction works | |||||
| 1.01 | Complete clearing and grubbing of the construction site, including removal of all existing vegetation and debris. Segregation and off-site relocation of all old substation equipment and vehicles (e.g., ground wires, cables, angles, hydra-crane, tractors) to a designated area outside the construction zone. | 1 | job | - | - |
| 1.02 | Earth work in excavation by mechanical means (Hydraulic excavator)/
manual means over areas (exceeding 30 cm in depth, 1.5 m in width as
well as 10 sqm on plan) including getting out and disposal of excavated
earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.
2.6.1 All kinds of soil | 37.32 | cum | - | - |
| 1.03 | Providing and laying in position cement concrete of specified grade
excluding the cost of centering and shuttering - All work up to plinth level : | 2.89 | cum | - | - |
| 1.04 | One Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 8.35 | cum | - | - |
| 1.05 | Centering and shuttering including strutting, propping etc. and removal
of form work for :
4.3.1 Foundations, footings, bases for columns | 66.02 | sqm | - | - |
| 1.06 | 4.3.3 Columns, piers, abutments, pillars, posts and struts | 133.23 | sqm | - | - |
| 1.07 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D or more. | 3,009.37 | kg | - | - |
| 1.08 | Providing and laying in position specified grade of reinforced cement
concrete, excluding the cost of centering, shuttering, finishing and
reinforcement - All work up to plinth level :
5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural
sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 26.72 | cum | - | - |
| 1.09 | Providing and laying damp-proof course 40mm thick with cement
concrete 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural
sources : 4 graded stone aggregate 12.5mm nominal size derived from
natural sources) | 14.81 | sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BIDdoc323.pdf
Tender Documents • 0.63 MB
BOQ_82786.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .