Tender Value
₹4.2 L
EMD Value
₹10,557
Closing Date
19 May 2026, 3:00 pmClosed
Assistant Executive Engineer
O/o Assistant Executive Engineer Electrical Irrigation Sub Division Aluva
Urgent Rewinding of motors. -General Electrical Work-Maintenance of LI Scheme 2023-24 Urgent Rewinding under Electrical Wing (Minor Irrigation) Section Kalady.
2024_Irrig_665184_56
PWD/BLDG/KLDY/15521/2023-2024
Open Tender
Electrical Works
Item Rate
365 days
Aluva
Please refer Tender documents.
10 documents required · 10 mandatory
₹935
₹10,557
12 May 2026
12 May 2026
21 May 2026
12 May 2026
19 May 2026
12 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Rewinding of motors at various LI schemes | |||||
| 1.001 | OD212212/2023-2024:Disconnect all electric connections from the motor , decoupling the motor from pump and
remove the base bolts from motor and base plate and kept the motor at safe place , checking and
testing the stator and rotor winding. power up to 10 HP, leading the motor to the nearest
roadside using manpower, rope , chain, reaper etc. as required without getting damages to the
motor, including loading into the vehicle and unloading at workshop for repairs and to and fro
conveyance. | - | no | - | - |
| 1.002 | OD212211/2023-2024:Disconnect all electric connections from the motor , decoupling the motor from pump and
remove the base bolts from motor and base plate and kept the motor at safe place , checking and
testing the stator and rotor winding. power greater than 15 HP and up to 60 HP,leading the
motor to the nearest roadside using manpower, rope , chain, reaper etc. as required without
getting damages to the motor, including loading into the vehicle and unloading at workshop for
repairs and to and fro Conveyance.including resetting, refitting, coupling with pump, giving
connection, taking trial run with full load etc. complete | - | no | - | - |
| 1.003 | OD212210/2023-2024:Disconnect all electric connections from the motor , decoupling the motor from pump and
remove the base bolts from motor and base plate and kept the motor at safe place , checking and
testing the stator and rotor winding. power greater than 61 HP and up to 120 HP ,leading the
motor to the nearest roadside using manpower, rope , chain, reaper etc. as required without
getting damages to the motor, including loading into the vehicle and unloading at workshop for
repairs and to and fro Conveyance., resetting the rewound motor, refitting the motor on the base
plate, coupling with pump in correct alignment, giving wire connection , taking trial run on full
load. | - | no | - | - |
| 1.004 | OD212209/2023-2024:Disconnect all electric connections from the motor , decoupling the motor from pump and
remove the base bolts from motor and base plate and kept the motor at safe place , checking and
testing the stator and rotor winding, power above 120 HP, leading the motor to the nearest
roadside using manpower, rope , chain, reaper etc. as required without getting damages to the
motor, including loading into the vehicle and unloading at workshop for repairs and to and fro
Conveyance Charges,resetting the rewound motor, refitting the motor on the base
plate, couplin with pump in correct alignment, givin wire connection , taking trial run on full
load. | - | no | - | - |
| 1.005 | OD212213/2023-2024:Charges for rewinding the burnt rotor/stator - separate stater and rotor/stator, dismantling the damaged rotor/stator winding from the rotor/stator slots, cleaning the slots neatly, insulating the slots with correct class of insulating paper, winding the rotor/stator with good quality correct gauge of super enamelled copper winding wires, closing the rotor/stator slots with fibre wedges, putting proper inter layer insulation, connecting the coil end connection, providing new rotor/stator lead wire, steel binding the overhang with proper insulation at both ends, heating the coils and varnishing with good quality insulation varnish, keep it for drying, reassembling and test running(Less scrap copper) | - | kg | - | - |
| 1.006 | OD212340/2023-2024: Refitting upto 10 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load | - | each | - | - |
| 1.007 | OD212341/2023-2024:Refitting 11-30 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load | - | each | - | - |
| 1.008 | OD212342/2023-2024: Refitting 31-60 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load | - | each | - | - |
| 1.009 | OD212343/2023-2024:Refitting 61-110 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load | - | each | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.03 MB
Tendernotice_2.pdf
PDF • 0.10 MB
Tendernotice_3.pdf
PDF • 0.36 MB
NIT.pdf
Tender Documents • 0.03 MB
MAKE.pdf
Tender Documents • 0.28 MB
BOQ_1436608.xls
BOQ • 0.31 MB
SBD.pdf
Tender Documents • 1.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .