| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance DEHRADUN | UTTARAKHAND | 248001 | ₹1.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.0 CrAdmitted-Finance | ₹2.0 Cr | L2 | Admitted-Finance |
| 3 | L3₹2.1 CrAdmitted-Finance | ₹2.1 Cr | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Bidder did not submit the required document as per SBD. |
| Sl No | Description | Qty | Unit | RAJENDAR BHATT L1 | M/s Shiv Construction L2 | Daya Ram L3 |
|---|---|---|---|---|---|---|
| 1.00R/WALL & B/WALL | ||||||
| 1.01 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction | 298.37 | cum | 381.15 ₹1,13,723.73 Lowest | 401.85 ₹1,19,899.98 | 412.7 ₹1,23,137.3 |
| 1.02 | Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction | 413.49 | cum | 2,094.12 ₹8,65,897.68 Lowest | 2,207.9 ₹9,12,944.57 | 2,267.46 ₹9,37,572.04 |
| 1.03 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction | 320.92 | cum | 3,505.32 ₹11,24,927.29 Lowest | 3,695.77 ₹11,86,046.51 | 3,795.48 ₹12,18,045.44 |
| 1.04 | Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions of galvanized steel, of size 3mX1mX1m with two diaphragms at 1m interval, having mesh opening 100mmx120 mm, mesh wire diameter 3 mm for gabions, edge/selvedge wire diameter 3.9 mm and lacing wire diameter 2.2 mm. (The work includes filling boulders in the gabions). | 36 | No. | 7,641.09 ₹2,75,079.24 Lowest | 8,056.25 ₹2,90,025 | 8,273.6 ₹2,97,849.6 |
| 1.05 | Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction | 101.25 | cum | 3,662.37 ₹3,70,814.96 Lowest | 3,861.35 ₹3,90,961.69 | 3,965.53 ₹4,01,509.91 |
| 1.06 | Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) | 86.46 | cum | 961.29 ₹83,113.13 Lowest | 1,013.52 ₹87,628.94 | 1,040.86 ₹89,992.76 |
| 1.07 | Construction of coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work as per direction of Engineerin- charge. (As per PWD Uttarakhand specifications) | 68.33 | cum | 1,403.1 ₹95,873.82 Lowest | 1,479.33 ₹1,01,082.62 | 1,519.24 ₹1,03,809.67 |
| 2.00Road Surface work | ||||||
| 2.01 | WBM Grading 3
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.ByBy Mechanical Means | 334.62 | cum | 2,419.8 ₹8,09,713.48 | 2,296.14 ₹7,68,334.37 Lowest | 2,358.09 ₹7,89,064.08 |
Tender Value
₹1.9 Cr
EMD Value
₹3.8 L
Closing Date
5 Jun 2026, 3:00 pmClosed
Superintending Engineer, 9th Circle, PWD, Dehradun
Superintending Engineer, 9th Circle, PWD, Dehradun
Renewal by P.C. of Purodi Hayo Tagri motor road in Chakrata Constituency of Dehradun District under One Time Maintenance.
2026_pwd_94549_1
2220/1C-9/2026, Dated 18/04/2026
Open Tender
Civil Works - Roads
Item Rate
270 days
Kalsi Block
As per technical bid.
3 documents required · 3 mandatory
₹5,900
Executive Engineer, Temp. Div. PWD Chakrata
₹3.8 L
Superintending Engineer, 9th Circle, PWD, Dehradun
19 Jun 2026
25 Apr 2026
5 Jun 2026
25 Apr 2026
5 Jun 2026
8 May 2026
8 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1R/WALL & B/WALL | |||||
| 1.01 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction | 298.37 | cum | - | - |
| 1.02 | Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction | 413.49 | cum | - | - |
| 1.03 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction | 320.92 | cum | - | - |
| 1.04 | Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions of galvanized steel, of size 3mX1mX1m with two diaphragms at 1m interval, having mesh opening 100mmx120 mm, mesh wire diameter 3 mm for gabions, edge/selvedge wire diameter 3.9 mm and lacing wire diameter 2.2 mm. (The work includes filling boulders in the gabions). | 36 | No. | - | - |
| 1.05 | Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction | 101.25 | cum | - | - |
| 1.06 | Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) | 86.46 | cum | - | - |
| 1.07 | Construction of coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work as per direction of Engineerin- charge. (As per PWD Uttarakhand specifications) | 68.33 | cum | - | - |
| 2Road Surface work | |||||
| 2.01 | WBM Grading 3
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.ByBy Mechanical Means | 334.62 | cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.56 MB
SBD_PHT.pdf
Tender Documents • 1.94 MB
BOQ_111885.xls
BOQ • 0.56 MB
Document.pdf
PDF • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].