Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | ₹4.2 L | L1 | Accepted-AOC Lowest Quoted Bid |
| 2 | L2₹4.4 LRejected-AOC | ₹4.4 L | L2 | Rejected-AOC Second Lowest Quoted Bid |
| Sl No | Description | Qty | Unit | Thakappan L2 | UNNIKRISHNAN.K. L1 |
|---|---|---|---|---|---|
| 1.00Road Maintenence | |||||
| 1.00 | OD357821/2024-2025:Preparation of Foundation for Embankment <br> Scarifying Existing Bituminous Surface
to a Depth of 150 mm by Mechanical Means and recompacting the aggregate received from scarifying witha three wheel 80-100 KN static roller | 432 | sqm | 7.34 ₹3,170.88 | 6.99 ₹3,019.68 |
| 1.00 | 4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead | 68.22 | cum | 3,503.72 ₹2,39,023.78 | 3,336.55 ₹2,27,619.44 |
| 1.00 | 75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 454.8 | sqm | 84.14 ₹38,266.87 | 80.02 ₹36,393.1 |
| 1.00 | 75.5.2.3pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | 454.8 | sqm | 18.42 ₹8,377.42 | 17.33 ₹7,881.68 |
| 1.00 | 75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 17.4 | sqm | 388.13 ₹6,753.46 | 369.96 ₹6,437.3 |
| 1.01 | 75.5.2.1pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 91.2 | sqm | 16.58 ₹1,512.1 | 14.47 ₹1,319.66 |
| 1.01 | 75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means Type A (II) Bitumen (S-65) | 546 | sqm | 270.55 ₹1,47,720.3 | 258.11 ₹1,40,928.06 |
Tender Value
₹4.2 L
EMD Value
₹10,591
Closing Date
15 Mar 2025, 6:00 pmClosed
B Jayakumar
Assistant Engineer,Vaikom Municipality 686141
GENERAL-Annual plan 2024-25 Vaikom Municipality CHETHIMANGALAM ROAD BALANCE PORTION MAINTANCE -ProjectNo 377/24-General Civil Work
2025_LSGD_747480_1
5870 2023 AE LID EW VKM-chethimangalam
Open Tender
Civil Works - Roads
VAIKOM
Please refer Tender documents.
9 documents required · 9 mandatory
₹935
Yes
₹10,591
Yes
24 Jun 2026
7 Mar 2025
17 Mar 2025
7 Mar 2025
15 Mar 2025
7 Mar 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid