| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 CrAccepted-AOC 8 0 241 | SOUTH EAST | DELHI | 110003 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹7.7 Cr+₹13.2 L (1.73%)Rejected-Finance C O HOTEL VASUNDHARA PALACE KAILASH GATE MUNI KI RETI TEHRI GARHWAL | MUNI KI RETI | TEHRI GARHWAL | UTTARAKHAND | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | M/s Man singh Rautela L1 | M/S KAILASH HILLWAYS ENGINEERING ASSOCIATES L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. (DSR Item) | 1,801.29 | Cum | 250 ₹4,50,322.5 Lowest | 260 ₹4,68,335.4 |
| 2.00 | Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. All kinds of soil. (DSR Item) | 514.09 | Cum | 120 ₹61,690.8 Lowest | 125 ₹64,261.25 |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). (DSR Item) | 86.67 | Cum | 6,500 ₹5,63,355 Lowest | 6,810 ₹5,90,222.7 |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) (DSR Item) | 1.89 | Cum | 7,500 ₹14,175 Lowest | 7,750 ₹14,647.5 |
| 5.00Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.“(Note :- Minimum Cement content considered in this item is @ 330 kg/cum.) (DSR Item) | |||||
| 5.01 | Work Up to plinth Level | 924 | cum | 9,500 ₹87,78,000 | 9,400 ₹86,85,600 Lowest |
| 5.02 | Work above to plinth level upto floor V level | 1,167.85 | cum | 9,800 ₹1,14,44,930 | 9,750 ₹1,13,86,537.5 Lowest |
| 6.00 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. (DSR Item) | 310.95 | MT | 1,00,000 ₹3,10,95,000 Lowest | 1,04,000 ₹3,23,38,800 |
| 7.00 | Centring and shuttering for foundations, footings, bases of columns, etc. for mass concrete. (DSR Item) | 418.26 | Sqm | 380 ₹1,58,938.8 Lowest | 390 ₹1,63,121.4 |
| 8.00 | Centring and shuttering for Columns, Pillars, Piers, Abutments, Posts and Struts. (DSR Item) | 1,166.39 | Sqm | 920 ₹10,73,078.8 Lowest | 950 ₹11,08,070.5 |
Tender Value
₹8.0 Cr
EMD Value
₹16.0 L
Closing Date
6 Jun 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Office of the S.E., 8th circle, PWD, New Tehri
Construction of work Kaddukhal Vehicle parking (Civil work) in Dhanaulti constituency of district Tehri Garhwal.
2025_pwd_83826_1
2490/08Cash-Tender-8/2025 Dated 09-05-2025
Open Tender
Civil Works - Buildings
Item Rate
365 days
Thaytur (Tehri Garhwal)
As Per Tender Notice, Technical Bid and BOQ
2 documents required · 2 mandatory
₹5,900
E.E., TD, PWD, Thaytur
₹16.0 L
S.E., 8th circle, PWD, New Tehri
15 Dec 2025
13 May 2025
9 Jun 2025
13 May 2025
6 Jun 2025
24 May 2025
14 May 2025 - 19 May 2025
20 May 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. (DSR Item) | 1,801.29 | Cum | - | - |
| 2 | Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. All kinds of soil. (DSR Item) | 514.09 | Cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). (DSR Item) | 86.67 | Cum | - | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) (DSR Item) | 1.89 | Cum | - | - |
| 5Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.“(Note :- Minimum Cement content considered in this item is @ 330 kg/cum.) (DSR Item) | |||||
| 5.01 | Work Up to plinth Level | 924 | cum | - | - |
| 5.02 | Work above to plinth level upto floor V level | 1,167.85 | cum | - | - |
| 6 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. (DSR Item) | 310.95 | MT | - | - |
| 7 | Centring and shuttering for foundations, footings, bases of columns, etc. for mass concrete. (DSR Item) | 418.26 | Sqm | - | - |
| 8 | Centring and shuttering for Columns, Pillars, Piers, Abutments, Posts and Struts. (DSR Item) | 1,166.39 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_99725.xls
BOQ • 0.39 MB
170358842.pdf
Tender Documents • 2.03 MB
170358844.html
Tender Documents • 0.05 MB
Tehnicalbid_Praking.pdf
Tender Documents • 6.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .