Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.9 LAccepted-AOC | L1 | Accepted-AOC L2 | |
| 2 | L2₹15.4 L+₹50,816.93 (3.30%)Accepted-AOC | L2 | Accepted-AOC L1 | |
| 3 | Rejected-Technical CALICUT ROAD KAKKATTIL CALICUT | KOZHIKODE | KERALA | 612906 | - | Rejected-Technical L4 | |
| 4 | Rejected-Technical | - | Rejected-Technical L3 |
Tender Value
₹17.8 L
EMD Value
₹30,000
Closing Date
10 Nov 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Executive Engineer,LID EW Division , Kalpetta
DP WAYANAD 2021-22-P.NO-265 AYURVEDA JUNCTION PADIKUNNU ROAD MAINTENANCE IN KANIYAMBETTA G P-RS.20 LAKHS.
2021_LSGD_448647_58
EE/LIDEW/WYD/06/2021-22
Open Tender
Civil Works - Roads
Item Rate
150 days
Kalpetta
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,950
Yes
₹30,000
Yes
18 Jan 2022
2 Nov 2021
15 Nov 2021
2 Nov 2021
10 Nov 2021
2 Nov 2021
45 days
Amount
Side Protection Work (DR)
2.7.D : Dismantling Stone Masonry as per Technical Specification Clause 202. Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.(D)Dry Rubble Masonry
11.1.1.1 : Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I.Ordinary soil (i)Upto 3 m depth
75.7.1 : DRY RUBBLE MASONRY _ Random rubble masonry with hard stone, including Through/Bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications.
od1226559/2021_2022 : DRY RUBBLE MASONRY _ Dry rubble without concrete leveling course masonry with DEPARTMENTAL rubble including packing to compactness to lines and levels cost and conveyance of all materials labor charges etc. complete as per direction of Departmental officers at site.
Cement Concrete Retaining Wall (ch 0/210-0/264)
11.1.1.1 : Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I.Ordinary soil (i)Upto 3 m depth
11.4.1.1 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I.P.C.C grade M 10 (i)Nominal mix 1:3:6
12.5.1.1 : Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m I.P.C.C grade M 15 (i)Nominal mix (1:2.5:5)
od1226561/2021_2022 : Providing Weep Holes to Cement Concrete Retaining Wall using 63mm 4kgf/cm2 PVC Pipes, as per the direction of Engineer-in-Charge.
Culvert ch 0/167
11.1.1.1 : Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I.Ordinary soil (i)Upto 3 m depth
od1226553/2021_2022 : DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
11.4.1.1 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I.P.C.C grade M 10 (i)Nominal mix 1:3:6
12.5.1.1 : Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m I.P.C.C grade M 15 (i)Nominal mix (1:2.5:5)
12.7 : Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
12.5.3 : Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m III.R.C.C grade M 20
13.3 : Supplying, fitting and placing TMT bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002,1010 and 1202
13.1.2 : Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5R.C.C M 25
od1226557/2021_2022 : DRY RUBBLE MASONRY _ Dry rubble without concrete leveling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labor charges etc. complete as per direction of Departmental officers at site.
od1226562/2021_2022 : Filling with contractor's own earth ( excluding rock) in OPEN AREAS in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge
od1226565/2021_2022 : Filling with contractor's own earth ( excluding rock) in TRENCHES,PLINTH, SIDES OF FOUNDATIONS etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge
od1226566/2021_2022 : Putting up RING BUND with earth filled gunny bags of top width 1.00 m bottom width 2.00 m height 2.00 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work etc complete.
od1226567/2021_2022 : Pumping or Bailing out water and removing slush etc by using Pump set including cost of labour, oil, hire charges of pump set etc complete
od1226569/2021_2022 : DOWEL BARS - Supplying and providing MS dowel bars of size 16mm dia, 2.00m long (1m in rock and 1m in concrete) including drilling holes of 20mm dia and filling the gap with cement grout (0.10kg/each) etc complete
75.8.1 : Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4 course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as required including compaction, finishing and tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixed in concrete mixer etc complete as per specification (i) Nominal mix (1:2:4)
HASHIM U K
TC VIJAYAN
KALPETTA ZONE LABOUR CONTRCT CO-OPERATIVE SOCIETY LTD
Bidder Name
NAMSHAD A.
TC VIJAYAN
KALPETTA ZONE LABOUR CONTRCT CO-OPERATIVE SOCIETY LTD
HASHIM U K
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_641815.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .