Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹29.9 L+₹3,904 (0.13%)Rejected-Finance | L2 | Rejected-Finance L2, hence rejected | |
| 3 | Rejected-Technical | - | Rejected-Technical TEC REJECTED |
Tender Value
₹29.9 L
EMD Value
₹29,884
Closing Date
26 Aug 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
District Police Chief
District Police Office, Thrissur City
Camera project (Supply, installation, testing and commissioning) for Bus terminal at Sakthan Bus stand and KSRTC Bus stand terminal at Thrissur for public security
2023_KP_593102_1
G2-22300/2023/RC
Open Tender
Miscellaneous Works
Supply and Service
30 days
Sakthan Bus stand and KSRTC Bus stand
Please refer Tender documents.
10 documents required · 10 mandatory
₹5,700
Yes
₹29,884
Yes
24 Jan 2024
8 Aug 2023
2 Sept 2023
8 Aug 2023
26 Aug 2023
8 Aug 2023
8 Aug 2023 - 25 Aug 2023
Supply, installation, testing and commissioning of CCTV Cameras at KSRTC & Sakthan Bus Stand Thrissur
Supply, installation, testing and commissioning of 4 / 5 mega pixel 5 - 50 mm motorized verifocal bullet Camera with 5 year CAMC & Onsite Support, Down TIME Less than 6 hours. [camera * 1, weatherproofbox*1, RJ45 jack*2]
Supply, installation, testing and commissioning of 4/5 mega pixel 5 - 50 mm motorized verifocal bullet Camera with supplement 200 watts flood light with 5 year CAMC & Onsite Support, Down TIME Less than 6 hours. [camera * 1, 200W flood light*1, weatherproofbox*1, RJ45 jack*2]
Supply, installation, testing and commissioning of 4 / 5 mega pixel 2.8 - 12 mm motorized verifocal bullet Camera . [camera * 1, weatherproofbox*1, RJ45 jack*2]
Supply, installation, testing and commissioning of 4 / 5 mega pixel 2.8 - 12 mm motorized verifocal bullet Camera with supplement 200 watts flood light with 5 year CAMC & Onsite Support, Down TIME Less than 6 hours. [camera * 1, 200W flood light*1, weatherproofbox*1, RJ45 jack*2]
Supply, installation, testing and commissioning of 4 / 5 mega pixel AI Face Recognition motorized verifocal bullet Camera . [camera * 1, weatherproofbox*1, RJ45 jack*2,MMC*1]
Supply, installation, testing and commissioning of 4 / 5 mega pixel AI Face Recognition motorized verifocal bullet Camera with supplement 200 watts flood / hibay light with 5 year CAMC & Onsite Support, Down TIME Less than 6 hours. [camera * 1, 200W flood / hibay light*1, weatherproofbox*1, RJ45 jack*2,MMC*1]
Supply, installation, testing and commissioning of 8 Port Poe Switch 10/100, GIGA UP LINK with 5 year CAMC & Onsite Support, Down TIME Less than 6 hours.
Supply, installation, testing and commissioning of 24 Port Giga Poe Switch 100/1000 + 2 SFP with 5 year CAMC & Onsite Support, Down TIME Less than 6 hours.
Supply and installation of 6U 500 NETWORK RACK with Belkin 6 Socket PDU, Tray, Cooling Fan, Hardware Kit and Cable Manager. [ 6U 500D RACK *1, PDU*1, TRAY*1, Cable manager open *2, Cooling Fan *1, Hardware Kit *1 pkt]
Supply and installation of Weatherproof Metal box with fixing accessories, Tray, fan modules, side air vents and lock with POLE mount capability and mounting brackets
Supply, installation, testing and commissioning of Fibre Optic Media converter 10/100 with accessories. with 5 year CAMC & Onsite Support, Down TIME Less than 6 hours. [MC * 1 Pair, Patch Chord*1, Patch Box*2]
Supply, installation, testing and commissioning of Fibre Optic ONU with accessories. with 5 year CAMC & Onsite Support, Down TIME Less than 6 hours. [ONU * 1 , Patch Chord*1, Patch Box*2]
Supply, installation, testing and commissioning of 24V / 2KVA Inverter with 200 AH Solar Batteries. with 5 year CAMC & Onsite Support, Down TIME Less than 6 hours. [inverter * 1 , 200 AH Battery*2, Tray *2]
Suppying and laying of CCTV cabling outdoor CAT6 cables with stay wire including material cost and labour charges for running meter. [ Cable, Stay, Binding, Labour]
Suppying and laying of Fiber Optic 6 core cable with stay wire including material cost and labour charges for running meter. [ Cable, Stay, Binding, Labour]
Suppying and laying of 2 core Service Wire AL cable with Support Clamps including material cost and labour charges for running meter. [ Cable, Binding, stay, Labour]
Suppying and laying of 3*25 sqmm ABC Cable with Support Clamps including material cost and labour charges for running meter. [ Cable, Dead end Clamp, Labour]
Suppying and lnstallation of Electrical Items including material cost and labour charges. [ 6 WAY DB BOX * 1, ISOLATOR *1, ELCB*1, MCB *2, 16A POWER SOCKET * 2 ]
Suppying and laying of 3 * 2.5 SQMM cable with Conduiting, including material cost and labour charges for running meter. [ 3* Cable, Clamp, Conduits, Fisher, Screws, Labour]
Suppying and lnstallation of Weatherproof box 25* 20 size with material cost and labour charges. [ 25*20 BOX *1 ]
Supply and installation of 8 Meter Octogaonal camera pole made of hot dip galvanised GI sheet 70mm top diameter, 130mm bottom diameter, thickness 3mm. Base plate dimensions of 210mm X 210mm X 12mm including Foundation assembly : Foundation bolts M16 X 450mm X 4 Nos
Supply and installation of Cantilever arms - 3 Mtr 2" Dia cantilever arms with 2 support stay from top of pole (with galvanized steel 5/8 X 6 eye/eye turnbuckle and 6mm GI wire and hook) - One side
Supply and installation of Cantilever arms - 2 Mtr 2" Dia cantilever arms with 2 support stay from top of pole (with galvanized steel 5/8 X 6 eye/eye turnbuckle and 6mm GI wire and hook) - One side
Supply and installation of , RCC Foundation including earthwork excavation with pole earthing .
Supply and installation of camera pole mount bracket with clamp.
Supply and installation of AI NVR & 43" TV for Monitoring with 5 year CAMC & Onsite Support, Down TIME Less than 6 hours.
Supply and installation of 5 Mtr Length, 2" Dia round GI Appoxy coated Pole for cable support with RCC Footing
Supply, installation & Configuration of 12 TB SSD supporting Dell server Power Edge R540
Supply of Exacqvision VMS Licence
Configuration of Cameras & server
Supply and erection of Granite Slab engraved with Name of MP, Project name, cost, year of completion.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .