Annual maintenance Nesaragi-Somanatti Via Mekalamardi Road from km. 0.00 to 8.50 of Kittur Constituency of Bailhongal Taluk for the year 2026-27(Reserved for SC Category only).
PWD/2026-27/RD/WORK_INDENT42361
PWD/2026-27/RD/WORK_INDENT42361
Reserved
Roads
Electronic Documents, First(One Cover)
PWD Division Office Belagavi
9 documents required · 9 mandatory
₹500
₹6,900
12 Sept 2026
12 Sept 2026
28 Sept 2026
Bar charts showing the details of works on National Highway's coming under jurisdiction of NH Circle Dharwad.
Strengthening Work approved under Annual Plan for the year2021-22. Estimate under scrutiny at RO office. (Lane width:9m)
NH-63 Karwar NH Division Four lane Widening/improvement Work approved under Annual Plan for the year2021-22 Work completed on 12.12.2018.Under DLP period till 11.12.2021. Strengthening work completed. vide J.No.16-17-820. Foreclosure proposal submitted to Ministry office. (Lane width:7m) Under M&R
Widening work completed on 31.01.2021. Under DLP for next 3 years (Lane width:7m.) Under M&R
NH-206 (New NH-69) Karwar Divn. (Honnavar sub-divn)
Bar charts showing the details of works on National Highway's coming under jurisdiction of NH Circle Dharwad.
Name of City , Villages & Bridges Start point Tintani Bridge Golapalli bridge (MJB) Lingasusgur Maski MJB Sindhanur Shrirampura Junction MJB End Point Dadesugura Bridge
NH-150A Vijayapura Divn. (Hunagund sub-divn)
Periodical Renawal work Physically completed. Vide J.No.2019-20-29 DLP Upto 30-03.2021 (lane width 5.5 m) The Siad Streach is under 2021-22 Annual plan for widening, The proposal Submitted to CE office Periodical Renawal work Physically completed. Vide J.No.2019-20-29 DLP Upto 30-03.2021 (lane width 2 lane +PS) (Lane width:4 lane) CC Road Under DLP KRDCL Raech (Lane width:4 lane) CC Road Under DLP Lane width:2 lane+PS) CC Road Under DLP upto Under M&R (lane width 5.5m)
Periodical Renawal work Physically completed. Vide J.No.2019-20-19. (Lane width:2 Lane)
Periodical Renawal work Physically completed. Vide J.No.2019-20-19. (Lane width: 5.5 m)
NH-367 Vijayapura Divn. (Hunagund sub-divn) (Lane width: 3.75 m) Under M&R
FULL DETAILS BAR CHART (RIS ID: BAI222)
NAME OF THE ROAD : ANNUAL MAINTENANCE TO NESARGI-SOMANATTI VIA MEKALAMARDI ROAD FROM KM 0.00 TO 8.50 IN BAILHONGAL TALUK OF BELAGAVI DIST
ROAD CATEGORY: MDR SUB DIVISION : BAILHONGAL DIVISION : BELAGAVI CIRCLE :BELAGAVI
START LATITUDE: 15.907151 LONGITUDE: 74.776501 END LATITUDE: 15.904803 LONGITUDE:74.800204
Nesaragi Village CD CD CD CD CD CD CD Mekalamardi Village CD CD CD CD CD CD CD CD Somanatti Village
Last Five Year road Improvement Details
Carriage Way (WI:163119) Work 2022-23 WI-150685 improved under 5054 App-E for 2021-22 GSB-100 WMM-225 BM-50 SDBC-25 Wi:151573 GSB 100 for Box Cutting, WMM 250, BM 50,SDBC 25 Under 5054 MDR Imp for 2022-23 5054 MDR Imp for 2022-23 (WI:163119)
5.50 m 3.75 m No Improvement
Proposed year Details
Annual Maintenance for 2026-27 More than 5 years
5.50 m Annual Maintenance for 2026-27 (Last 5 Year Developed Length) Annual Maintenance for 2026-27 (Last 5 Year Developed Length) Annual Maintenance for 2026-27 (Last 5 Year Developed Length)
Legends Desciption Silent Features 3).Proposed works under Annual Works 2).Maintenance for 2026-27 Village/City Limit
Completed Works & Under DLP Lane Width Details Total Length (in Km) HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) Name of Village/ City From To L (in Km)
Annual Maintenance Less than 5 years Single Lane Km 5.75 to 8.50 2.75 - - - - - 3054 0.000 5.75 Maint 5.750 Nesaragi 0.00 0.30 0.30
Annual Maintenance More than 5 years Intermediate lane 5.5 Km (Km 0.00 to 5.75) 5.75 5.75 8.50 Maint 2.750 Mekalmardi 4.70 5.10 0.40
Work Under progress Two lane 0.00 Km 0.00 Somanatti 8.20 8.50 0.30
Non Feasible Reach Two lane + PS 0.00 Km 0.00 Total Length (in Km) 0.00 Total Length (in Km) 8.500 Total Length (in Km) 1.00
Major Bridges Four lane 0.00 Km 0.00 4). On going works 1). Completed Works and under DLP
Minor Bridges Major Bridges 0.00 Km 0.00 HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) Other Department Works
CD Minor Bridges 0.00 Km 0.00 - - - - 0.00 0.000 RS 0.00 Under From To L (in Km)
Village/ City Name Railway Crossing 0.00 Km 0.00 KRDCL 0.00
Railway Crossing Overlap Length 0.00 Km 0.00 KSHIP 0.00
Works Under Annual Maintenance 2025-26 (less than 5 years) Total Length (in Km) 8.50 Total Length (in Km) 0.00 SHDP 0.00
5). Eligible for Renewal Total Length (in Km) 0.00 Total Length (in Km) 0.00
2026-27 Maintenance Abstract HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km)
Description Length 0.00 0.00 Ren 0.00 No. Details Length
Annual Maintenance Less than 5 years 5.75 1 1). Completed Works and under DLP 0.00
Annual Maintenance More than 5 years 2.75 2 2).Maintenance for 2026-27 8.50
Total Maintenance length 8.50 3 3).Proposed works under Annual Works 0.00
Total Length of the Road 8.50 4 4). On going works 0.00
5 5). Eligible for Renewal 0.00
Total Length (in Km) 8.50
Bar charts showing the details of works on National Highway's coming under jurisdiction of NH Circle Dharwad.
NH-63 Karwar NH Division PR work proposed. Work completed on 12.12.2018. Strengthening work completed. vide J.No.16-17-820 PR work proposed. Work sanctioned under PR for the year 19-20. work completed. Ylp town limit 16-17-008 Work sanctioned under PR for the year 19-20.Estimate to be submitted from division.
EPC work under progress. (J.No.KNT-16-17-838) From Km.142.75 to 267.600 handed over to NHAI. Only one time improvement from Km.187.00 to 193.50(Gadag city limit) and 248.30 to 255.16(Koppal city limit) is taken up by NH Dept. and works are completed.
NH-63 Hubli NH Division Work nearing completion. KNT-16-17-832 * The work Construction of minor bridge @ Km.112.30 with approaches from Km.110.00 to 112.800 -tender under process & * PR work from Km.112.800 to 128.85-estimate submitted to Ministry.
Chainage 106.00 110.00
IL PR Work completed on 28/12/2018. DLP was upto Dec-2019.
NH-206 Karwar Divn. (Honnavar sub-divn) Widening from Single/Intermediate Lane to two lane from Km 299.600 to 348.00 is under Progress & it will be completed on 28/02/2020
Vijaypur (4.4 to 56) & Hubli (56 to 193.35) EPC work is under progress and is nearing completion. (Job No.KNT-16-17-836) EPC work is under progress and is nearing completion. (Job NO.KNT-14-15-775) EPC work is under progress and is nearing completion. (Job NO.KNT-14-15-776) EPC work is under progress and is nearing completion. (Job NO.KNT-2012-735)
* Construction of 4-lane ROB @ Km.15 on NH-218:For land acquisition, 3(D) notified.
ROB at CH 0.50 work under progress 2L+PS-Work completed in 2017.DLP completed on 31 Mar-2020. 2L+PS-Work under progress. (Job No.17-18-869) 95 % work completed. 2L 2L Under M& R
IL-5.5m width IL
NH-367 Hubli (0.00 to 104) Estimate submitted under Annual plan 2021-22 2L+PS-Work under progress. (Job No.19-20-905) Work under progress. Estimate submitted under Annual plan 2021-22 PR work under progress
* Construction of 4-lane ROB @ Km.0.517 -Revised cost estimate/Financial bid submitted to Ministry.
0.00 to 71.00 is ylb and remaining ch. Comes under Naragund Sub-divn.
NH-367 Vijaypur (104 to 157.80) PR work proposed for the year 2019-20.
Widening to 4-laning work completed by KRDCL.
NH-766C Hubli Widening work estimate submitted to Central office. PR works from 170.2 to 177, from Km.179 to 189.7 & Km. 195.00 to 196.00 approved.The reach from Km. 177 to 179 & 189.7 to 195.00 are under DLP.
Work physically completed.J.No.16-17-800 4L
Work physically completed. J.No.16-17-800 2L
IL IL PR work estimate submitted to Ministry.
PR work costing 12.90 crores technical bid submitted to Central office on 27.12.2019.
NH-150A Kalaburagi (50 to 89.30)& Vijaypur (89.30 to 142.00)
* NH-150A from Km.0.00 to 50.00 handed over to NHAI.
* Construction of minor bridge @ Km 127.537 is under progress.( Est cost: 4.73 Crores)
* Widening of major bridge proposed @ Ch.171.60/Estimate costing 21.21 Crores submitted under Annual plan 19-20.
* FDR work- to Tungabhadra major bridge @ Km.198.24 costing Rs.1.25 Crores- Tender called.
Work under progress. 60% work completed. (J.No.KNT-16-17-823) Work under progress. 30% work completed. (J.No.KNT-16-17-816)
NH-50 Kalaburagi NH Division
*Construction of 4-lane ROB @ Km.66.90-agreement executed. Due to land acquisition appointed date is not issued.
*Humnabad town limit from Km.96.64 to 100.00 PR work estimate submitted.
* FDR work from Km.62.87 to 63.27 costing 45.00 Lakhs sanctioned- Tender to be called.
PR work costing 10.33 crores technical bid submitted to Central office on 27.12.2019. 2L+PS
NH-150E Kalaburagi NH Division
Work under progress. 70% work completed. (J.No.KNT-16-17-828) Yadgir town limit PR work submitted Work under progress. 80% work completed. (J.No.KNT-16-17-817)
NH-150 Kalaburagi NH Division
Widening to 2L+PS work-estimate submitted to Ministry under Annual plan.
NH-548B Vijaypur NH Division
IL Providing bitumen wearing course under M&R - Work completed in Dec-2019.
NH-161A Kalaburagi NH Division
SL-Single Lane-3.75m width
IL-Intermediate Lane-5.5m width
NH-752K Kalaburagi NH Division 2L-Two lane-7.0m width
2L+PS-Two lane along with Paved shoulder-10.00m width
0.00 48.20 6L- Six lane
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
3 Detailed Estimate.pdf
Others - 3 Detailed Estimate.pdf • 0.72 MB
Formats and govt GOs.zip
Others - Formats and govt GOs.zip • 20.38 MB
3 NESARAGI SOMANATTI BC.xlsx
Others - 3 NESARAGI SOMANATTI BC.xlsx • 0.06 MB
MDR Approved programme 2026-27.pdf
Others - MDR Approved programme 2026-27.pdf • 8.49 MB
MDR approved programme letter.pdf
Others - MDR approved programme letter.pdf • 1.94 MB
42361 BID DOC SC KW-1.doc
Tender Document • 1.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .