PROPOSED ESTIMATE FOR CONSTRUCTION ICONIC ROAD FROM RAMBHAROSA CHOWK TO JALESHWAR BRIDGE WITH BEAUTIFICATION AND ROAD FURNITURE AT VERAVAL, DIST. GIR-SOMNATH
324911
Muni./P.W.D./826
Open
Civil Works - Roads
Works
Gir Somnath
3 documents required · 3 mandatory
₹6,000
Veraval Patan Joint Municipality Veraval
₹4.1 L
17 Jul 2026
17 Jul 2026
17 Jul 2026
21 Aug 2026
17 Jul 2026
Name of Work : Proposed estimate for construction Iconic road from Rambharosa Chowk
to Jaleshwar Bridge with beautification and road furniture at Veraval,
Dist. Gir-Somnath
Estimated Unit Total Amount
Estimated Unit Total Amount
Quantities Rates according to
Item Estimated in Figure estimated
Item Descrption
No. but may be quantities.
Box cutting the road surface to proper
slope and camber for making a base for
road work including removing the
excavated stuff and depositing on the road
side slope as directed upto 50 M. (use
material spreding on the road side
Providing and laying compacted W.B.M.
150 mm. thick of Grading-II B.T. metal of
size 45 mm to 63 mm in two layers
including using 13% Stone screening
mm size and 7% stone dust as filler
including spreading, watering and
consolidation by vibratory roller etc.
Providing and laying 75mm thick Built up
spray grout in two layers using black
crashed stone aggregate as per gradation
and specification including using cationic
rapid setting emulsion for tack coat at the
rate of 4.00 kg./10 Sqm by mechanical
sprayer and bitumen of VG-30 grade for
mixing at the rate of 19.90kg/ M.T. by
weight of total mix (i.e. 1.99%) and mixing
the aggregate and bitumen by continuous
batching drum mix plant and spreading the
same by paver finisher and consolidation
by vibrator roller including cost of all
materials, fuel, labours, tools and plants,
using contractor's own machineries
Estimated Unit Total Amount
Estimated Unit Total Amount
Quantities Rates according to
Item Estimated in Figure estimated
Item Descrption
No. but may be quantities.
Providing and laying 50mm thick
compacted bitumenous macadam using
black crushed stone aggregate and filler
material as per gradation of M.O.R.T. & H.
specification including using catonic rapid
setting emulsion for tack coat at the rate of
2.50 kg/10 sqm., by mechanical sprayer
and bitumen of 60-70 grade for mixing at
the rate of 34.00Kg/M.T. by weight of total
mix (i.e.3.4%) and mixing the aggregate
and bitumen by continuous drum mix plant
and spreading the same by paver finisher
and consolidation by vibratory roller
including cost of all materials, fuel,
labours, tools and plants, using
contractor's own machineries.
Providing and laying 25mm thick semi
dence bitumenous concrete using black
crushed stone aggregate and filler
materials as per gradation of M.O.R.T & H.
specification including using bitumen of 60-
70 grade of mixing at the rate of
Kg/M.T. by weight of total mix (i.e. 5.00%)
and mixing the aggregate and bitumen by
continuous drum mix plant and spreading
the same by paver finisher and
consolidatoin by vibratory roller including
cost of all materials, fuel, labours, tools
and plants, using contractor's own
1318.19 machineries. 3632.97 M.T ₹
Providing and laying asphalt painting (VG-
30 grade) on B.T surface using bulk
asphalt @ 5.00 kg/10 sqm & spreading
6 stone dust @0.03 cum/10 sqm on painted
surface including cost of asphalt & stone
dust & all labour work incl. rolling with PTR
22925.00 roller etc complete. 34.34 Sq.Mt. ₹
Estimated Unit Total Amount
Estimated Unit Total Amount
Quantities Rates according to
Item Estimated in Figure estimated
Item Descrption
No. but may be quantities.
Road marking with hot applied
thermoplastic paints with reflectorising
glass beads on bitumin surface providing
and laying a hot applied thermoplastic
compound 2.5 mm thick including
reflectorising glass beads @ 250gms per
sqm area, thickness of 2.5mm is excluding
of surface applied glass beds as per
IRC:35-2015. The finished surface to be
level, uniform and free from streaks and
holes. zebra patta /bump patta lane/center
line/ edge line/cut patta. The white color
marking should provide liminance
coefficinet on cemend road shalll be min
130 mcd/m2/lux and Asphalt Road shall
be min 100 mcd/m2/lux during the service
life during the day time. The marking
should meet the performance criteria for
night time reflectivity, wet reflectivity and
skid resistance as mentioned in the
section-15 of IRC 35-2015. Warranty for
the Retro reflectivity should be two years.
Supplying and fixing cat eye (Stimsonite)
made out from Acrilo beautile sterine
injuction high compressed molding with
reflector made of MMC (prismatic type of
size 12cm x 6cm x 2.5cm) provided with
bituminous adhesive 100g. with each unit
for fixing. (Engineer grade)
Providing and laying cement concrete
1:3:6 (1- cement : 3- coarse sand : 6-
Crushed stone aggregate 40 mm. Nominal
size) and curing complete excluding cost
of form work in :(a) Foundation and plinth
Providing and casting in situ Controlled
trimix cement concrete M-250 for avg.150
mm thick road work laid as directed
including providing and laying using "C"
type Channel of road thickness with
necessary fixing as per width applying
10 plate vibrator (electric or diesel) on
channel by using all necessary
equipments & material & machinery for
levelling, floating and power trovelling
etc.curing and filling joints with bitumen as
directed etc.complete.
Tracing of old Manhole. All Types Of
73.00 Manhole at Every 30 Mt. 1214.02 No. ₹
Estimated Unit Total Amount
Estimated Unit Total Amount
Quantities Rates according to
Item Estimated in Figure estimated
Item Descrption
No. but may be quantities.
Excavation for foundation up to 1.5 Meter
depth including sorting out and stacking of
useful materials and disposing of
12 excavated stuff up to 50 Meter lead
(c)Hard Murrrum)
Providing and laying cement concrete
1:3:6 (1- cement : 3- coarse sand : 6-
Crushed stone aggregate 40 mm. Nominal
size) and curing complete excluding cost
of form work in :(a) Foundation and plinth
Providing & Installing Precast Concrete
Drain with inner dimension of 300mm x
300mm with lid at top having perforated
holes for drainage with all labour and
accessories required for it as directed by
1087.00 the engineer in charge. 5336.84 Rmt ₹
RCC precast M.H. Frame & cover
manufacture, supply & Delivery at store or
at site of work precast RCC M-200 frame
& cover suitable to drainage M.H. and as
per type design & Drawing including cost
15 of reinforcement M.S. angle or flate,
curing, mold work etc.
Heavy Duty frame & cover suitable of
50cm opening of MH-Inspection Chamber
Dismentaling tiled of stone floors laid in
mortar including stacking of serviceable
16 materilas and disposal of unserviceable
materials with all lead and lift.
Providing and laying cement concrete
1:3:6 (1- cement : 3- coarse sand : 6-
Crushed stone aggregate 40 mm. Nominal
size) and curing complete excluding cost
of form work in :(a) Foundation and plinth
Providing and fixing Pre-cast rubber dye /
steel dye inter locking concrete block
60mm thick with grade of concrete
350kg/cm^2 punmatic compressed by
mechanically pressed and as per
approved design confirming to IS
18 15658:2006 including 35mm sand layer for
levelling and filling the joints with sand in
proper line and level asper guidlines of
IRC : 63-2018 etc Complete as directed by
Engineer in Charge.
BRICK R Grey DL CP
Estimated Unit Total Amount
Estimated Unit Total Amount
Quantities Rates according to
Item Estimated in Figure estimated
Item Descrption
No. but may be quantities.
Providing and fixing pre-cast concrete
kerb stone of gray cement based concrete
block 60cm length, 45 cm height and
15cm thick of M350 grade concret as per
approved design and including excavation
for fixing in proper line and level, filling the
joint with C:M 1:3 (1 cement : 3 fine sand)
K-HB GREY SLVWP
Providing and casting in-situ ordinary
cement concrete M-200 for kerb/kerb
blocks including formwork curing and
72.00 finishing complete.-For Vata 4189.48 Cu.Mt. ₹
Providing and fixing 3 Seater Pre-cast
concrete benches With Name plate size of
0.30m x 0.15m.Fixing Pre-cast Benches
leveliing and filling the joint cement Mortar
1:4(1-Cement : 4- Fine sand) in proper
line and level including taxes,
transportation,colour and installation
charges with all accessories required for it
etc. as directed by the consultant or
Engineer-in-chrage etc. completed.
Providing & Fixing round haped Hanging
SS 2 Bin mounted with 3 pole Dustbin
having height of 750mm and capacity of
50L with pole having 40mm dia and 1mm
pole pipe thickness as directed by
20.00 Engineer-in-charge 6479.15 Each ₹
Estimated Unit Total Amount
Estimated Unit Total Amount
Quantities Rates according to
Item Estimated in Figure estimated
Item Descrption
No. but may be quantities.
Place ideatification sign :-Providing and
fixing sing boards made out of 2mm
aluminium sheet; size 150 x 90cms.
rectangle as as per the design of IRC-67-
1977 pre treated with phospheting
process & acid etching; coated with one
coat of epoxy primer and two coats of best
quality epoxy paint; reflectorised with retro
refiective sheeting as per latest M.O.S.T.
Specifications; Letters and numerals
should be as per IRC-30-1968, 3.1m long
(2 nos) stand post and frame fabricated
23 from suitable size iron angle of
50x50x5mm 75x75x6mm as required;
painted with best quality epoxy coatings in
black and white bends. the details of
symbol or inscription / numerals for each
board shall be as per the instruction of
engineer in charge. The fixing at site shall
be in 1:2:4 CC block of size 45 x 45 x
60cms. for each leg. including excavation
curing etc. complete under the supervision
of engineer in charge.(A) Engineer Grade
Palm Tree supply & plantation are to be
planted as per the detailed planting
drawing & as specified, labour charges, for
digging of pit as per detailed specification
filling of organic manure, fertilizer,
insecticide etc. and planting of plant as
shown in the drawing, filling the pit, proper
pressing, supporting and watering and
maintain for 3 year after completion of
work as directed by Enginee-in-charge
Minimum Height 12 feet
Estimated Unit Total Amount
Estimated Unit Total Amount
Quantities Rates according to
Item Estimated in Figure estimated
Item Descrption
No. but may be quantities.
Providing, Fixing of Xtreme Media
Nits Brightness, Outdoor Die Cast
Aluminium Led Display System, Length of
LED Display System (cm) 391 -
Height of LED Display System (cm) 191 -
200 Brightness -Calibrated Minimum (Nits)
5000 Life of Light Source (Hours)
Type of LED Display System Outdoor
Material of the Cabinet Die Cast
Aluminium Aspect Ratio 16:9 LED
Configuration RGB 3 in 1 SMD Maximum
Pixel Pitch (mm) 10 Length of LED Display
System (cm) 391 - 400 Height of LED
Display System (cm) 191 - 200 Maximum
Depth of LED Display System (cm)
Pixel Density Minimum (Per Square Metre)
28477 Horizontal Resolution (Pixel)
Vertical Resolution (Pixel)(in mm)
Horizontal Viewing Angle (degree)
Vertical Viewing Angle (degree)
Refresh Rate (Hz) 3840Response Time
(milliseconds) 10 Frame Frequency (Hz)
50 - 60 Brightness -Calibrated Minimum
(Nits) 5000 Contrast Ratio 10000 :1
Uniformity of Brightness across the
Screen 95 Gray Scale Processing (Bit)
Life of Light Source (Hours)
Dimming Capability 256 levels Fanless
Design Yes Availability of Data Power
Redundancy No Mean Time Between
Failure (MTBF)(Hours) >10000 IP Rating
(Front) IP65 Maintenance Rear Duty Cycle
24x7 Availability of Smart PDU Yes LED
Make Nationstar Power Input (Volt)
Vac +/- 10%, 50-60 Hz Maximum Power
Consumption (Per Square Meter)
Mounting Arrangement Wall/Pole
Availability of Receiver Card Yes Earth
Leakage Current <3mA
Filling in foundation and plinth with black
90.00 Cotton Soil in any thickness completede 309.06 Cu.Mt. ₹
Estimated Unit Total Amount
Estimated Unit Total Amount
Quantities Rates according to
Item Estimated in Figure estimated
Item Descrption
No. but may be quantities.
Supply and development of carpeted lawn,
preparation of land for lawn and soil mount
as per drawing, watering heavily, digging,
spreading, surface shall be leveled
uniformly, after preparation of the land
make it ready for the lawn plantation.
27 Planting of semi carpeted lawn by dibbling
method 20-30 cm distance. dibbled lawn
shall be lightly rolled and thoroughly
watered so as to keep the soil moist till the
grasses are established and maintain for
1.5 years after complition of work
Providing & fixing ralling in Stainless Steel
304 grade of standard make 900mm high
from finished floor or surface with
compatible rust proof welding, including
floor plate and fitted with SS fasteners etc
complete, including installation as
required. (Using 50mm dia, 304 grade SS
pipe as hand rail, 38mm dia 316 grade SS
pipe as baluster at 1.00m c\c. and 25mm
dia 316 grade SS pipe in three horizontal
Providing & Installing decorative Precast
rectangular Flower pot having 90cm length
and 45cm width and 45cm Height with
black Cotton soil in it with 3 Shurbs in it as
directed by Enginee-in-charge
All the work shall be carried out as per MOST specification and specification on the division or as
Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all
2) respects and held gross for under all conditions, site moisture weather etc.
The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-
3) 73 with detail of specification and details of work and amount involved at site without any
payment as directed by the Engineer in charge.
Testing of materials be as per statement attached with the Specifications, the materials shall be
tested in G.E.R.I. Bill for testing shall be paid by the CHIEF OFFICER and 1% of the (one
4) percent) of amount put to tender after shall be recovered from the running account bills of the
works. (As per G.R. (R&B) Deptt., No. TNC/1085/4/C dtd. 20.12.91.
5) The contractor shall quote even "NIL" if no reduction is proposed.
Estimated Unit Total Amount
Estimated Unit Total Amount
Quantities Rates according to
Item Estimated in Figure estimated
Item Descrption
No. but may be quantities.
One precent of estimated cost put to tender for this work shall be recovered from the contract
payments as "LABOUR CESS". In terms of the Gujarat Government Gazette Extra ordinary
6) dated 12.12.04. Implementation of building and other construction workers regulation of
equipments and conditions of service Act-1996)
Photographs of before work and after work will be submitted by the contractor at the time of
7) Each bill submission.
The contractor is solely responsible to bare all applicable taxes. I.e. GST etc. and department
8) will not entertain any contractor representation to reimburse any financial burden due to
applicable taxes : i.e. GST etc.
Signature of contractor
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
001_DTP_06_R0.pdf
002_Schedule-B Upload_06_R0.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .