Tender Value
₹41.0 L
EMD Value
₹42,000
Closing Date
7 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, Petlad Irrigation Division Petlad
Restoration to Jalsan Distry by providing C.C. lining in between ch. 3200 to 3550 mt. & Construction of key wall in between ch. 3200 to 6300 mt.
283430
21 of 2025-26
Open
Miscellaneous Works
Anand
8 documents required · 7 mandatory · 1 optional
₹1,500
Yes
Executive Engineer Petlad Irrigation Division Petlad
₹42,000
Yes
9 Mar 2026
9 Mar 2026
9 Mar 2026
7 Apr 2026
9 Mar 2026
Name of work :- Restoration to Jalsan Distry by providing C.C.lining in between ch. 3200 to
3550 mt. & construction of key wall in between ch. 3200 to 6300 mt.
Sr.No Quntity Item Unit Estimated Rate without GST
Without GST Rs.
In figures In World
Dismantalling the C.C Lining including Rs. Eighty
Disposing off the dismentalled material Six & Fifty
as direct etc .complete. (a) 7.50 cm Paise Only
Earthwork in embankment using Rs. One
selected soil, soft & hard murrum Hundred
excavated from approved borrow area / Thirty Nine &
2 840.00 village tanks etc. Including conveying, CM 139.20 Twenty Paise
spreading in uniform layers, breaking Only
clods and dressing to the designed
canal section etc. with lead upto 500 m
and all lifts. ForItem
No.3having capacity
Trimming of the canal section Rs. Seventy
manually for preparing subgrade for Two & Eighty
laying cement concrete lining in all Paise Only
3 2303.00 sorts of soil and murrum including SM 72.80
watering and compacting bed etc.
Providing and laying polyethylene film
of 100 micron ( 400 gauge ) in bed and
slopes of canal at the required level
including providing and spreading Rs. Thirty
sand layer of 20 mm thick below Nine Only
polyethylene film etc. complete.
Providing and laying plain/reinforced
cement concrete lining of M 15 (MSA
20 mm) in bed, side slopes and
curvature including batching, mixing,
transporting, placing, vibrating,
smooth finishing, curing including
dewatering where
5 3633.00 SM 327.90 Twenty Seven
required.(MACHINERY BASED by
"FLORI" - WITHOUT PAVER WATER
CURING) (A)7.5 cm thick lining in Bed
Excavation for foundation in all sorts
of soil including yellow sandy gravelly
soils ,soft & hard murrum etc. in dry
condition including depositing the Rs. One
excavated stuff in uniform layers in Hundred Two
6 837.00 banks or as and where directed etc. CM 102.40
complete for lead up to 500m and all Paise Only
lift. (BY MACHINERY)Excluding
Providing & Laying in position Rs. Four
"DESIGN MIX" cement concrete using Thousand
cement sand and crushed aggregate One Hundred
for C.C./ R.C.C work by "FLORI" Ninety Only
including necessary formwork,
centering, scaffolding, compaction by
vibrator, curing as directed with all
lead & lift etc complete without
dewatering and excluding the cost of
7 80.00 steel reinforcement.(A) For Footing of CM 4190.00
column / Abutment / Pier / Bottom
slab of barrel / Plinth course / Coping
/ Approach Slab etc.(a) Concrete grade
M-15 and MSA-20 mm
Providing & Laying in position Rs. Four
"DESIGN MIX" cement concrete using Thousand
cement sand and crushed aggregate Four
for C.C./ R.C.C work by "FLORI" Hundred Fifty
including necessary formwork, Seven Only
centering, scaffolding, compaction by
vibrator, curing as directed with all
lead & lift etc complete without
8 427.80 dewatering and excluding the cost of CM 4457.00
steel reinforcement.(B) For Pier and
Abutments / Wing wall / Head wall /
Return wall / Dowel Wall etc.(g)
Concrete grade M-15 and MSA-20 mm.
Total Rs…(Without GST)
Rs. Forty One Lac Two Thousand Three Hundred Eighteen & Only
I / We am / are willing to carry out the work at………………..% above / below precent.
(Should be written in figure and words) of the estimate reates mentioned above.
Amount of my / our tender works out as under.
Estimated amount put Estimated amout put
to tender Rs……………. to tender Rs……………..
Deduct …………..% Add………………%
below Rs………… Above Rs……………
Net Rs……………….. Total Rs…………….
In words…………………………….. In words………………
Notes 1 - All work shall be carried out as per Public Works Department Handbook and specifications of Division or
as directed by supervisory staff.
Notes 2 - The persons of firm submitting the tender should see that the all the columns in the schedule should be
filled in inkand total of entries in last column should be struck by the contractor under his signature.
Notes 3 - Rates quoted include clearing of site (prior commencement of work and at its close ) in all respects and
hold good for work under all conditions, site, moisture, weather etc.
Note 4 - The meaning of abbreviationss used in units are as under. Hact - Hactare MT - Metric Tonne Rmt =
Note 5 - Basic Rate for Cement Difference Calculation of Mix Design will be Rs.5483.37/M.T. (Rate as per
CGWRD SOR 2023-24
Techanically Checked By me…................
Arithmetically Checked By me….....................
Deputy Executive Engineer Divisional Account Officer
Petlad Irrigation Sub Division Petlad Irrigation Division
Executive Engineer
Petlad Irrigation Division
Name of Restoration to Jalsan Distry by providing C.C.lining in between ch. 3200 to 3550 mt.
Work:- & construction of key wall in between ch. 3200 to 6300 mt.
CEMENT CONSUMPTION
Sr No. Item Description Quantity Unit consumptio Total Cement M.T.
Providing and laying plain/reinforced cement concrete lining of
M 15 (MSA 20 mm) in bed, side slopes and curvature including
batching, mixing, transporting, placing, vibrating, smooth
1 5 finishing, curing including dewatering where 3633.00 SM 0.02
required.(MACHINERY BASED by "FLORI" - WITHOUT
PAVER WATER CURING) (A)7.5 cm thick lining in Bed / Slope
Providing & Laying in position "DESIGN MIX" cement concrete
using cement sand and crushed aggregate for C.C./ R.C.C
work by "FLORI" including necessary formwork, centering,
scaffolding, compaction by vibrator, curing as directed with all
2 7 lead & lift etc complete without dewatering and excluding the 80.00 CM 0.30
cost of steel reinforcement.(A) For Footing of column /
Abutment / Pier / Bottom slab of barrel / Plinth course / Coping /
Approach Slab etc.(a) Concrete grade M-15 and MSA-20 mm
Providing & Laying in position "DESIGN MIX" cement concrete
using cement sand and crushed aggregate for C.C./ R.C.C
work by "FLORI" including necessary formwork, centering,
scaffolding, compaction by vibrator, curing as directed with all
3 8 lead & lift etc complete without dewatering and excluding the 427.80 CM 0.30
cost of steel reinforcement.(B) For Pier and Abutments / Wing
wall / Head wall / Return wall / Dowel Wall etc.(g) Concrete
grade M-15 and MSA-20 mm.
Section Officer Deputy Executive Engineer
Petlad-1 Section Petlad Irrigation Sub Division
Percentage Calculation
Name of work :- Restoration to Jalsan Distry by providing C.C.lining in between ch. 3200 to 3550 mt. & construction of key wall in between ch. 3200 to 6300 mt.
Quantity Item Rate Unit Total amount Labour Total Labour Cement Total Cement Steel per Total Steel Bitumen Total PoL Per Total PoL cost Machiner Total Other Total Other TOTAL cost Total Item Cost Total %
Quantity Item Rate Unit Total amount Labour Total Labour Cement Total Cement Steel per Total Steel Bitumen Total PoL Per Total PoL cost Machiner Total Other Total Other TOTAL cost Total Item Cost Total %
Sr. Estimated but according to estimated Rs. Per Cost Per Unit Cost Unit Cost Per Unit Bitumen Cost Unit y Per Unit Machinery Comodity Comodity Cost per Unit
No. may be more Rs. Unit Cost Per Unit
Dismantalling the C.C Lining including
Disposing off the dismentalled material as
Earthwork in embankment using selected
soil, soft & hard murrum excavated from
approved borrow area / village tanks etc.
Including conveying, spreading in uniform
layers, breaking clods and dressing to the
designed canal section etc. with lead upto
500 m and all lifts. For canals having
capacity up to 300 Cusec (By
Machinery).(Add. Lift of 0.50 to 2.5 Km)
Trimming of the canal section manually
for preparing subgrade for laying cement
concrete lining in all sorts of soil and
compacting bed etc. complete.
Providing and laying polyethylene film of
100 micron ( 400 gauge ) in bed and
slopes of canal at the required level
layer of 20 mm thick below polyethylene
film etc. complete.
Providing and laying plain/reinforced
cement concrete lining of M 15 (MSA
mm) in bed, side slopes and curvature
including batching, mixing, transporting,
placing, vibrating, smooth finishing,
curing including dewatering where
required.(MACHINERY BASED by "FLORI"
3633.00 - WITHOUT PAVER WATER CURING)
(A)7.5 cm thick lining in Bed / Slope
Excavation for foundation in all sorts of
soil including yellow sandy gravelly soils
,soft & hard murrum etc. in dry condition
including depositing the excavated stuff in
uniform layers in banks or as and where
and all lift. (BY MACHINERY)Excluding
Providing & Laying in position "DESIGN
MIX" cement concrete using cement sand
and crushed aggregate for C.C./ R.C.C
work by "FLORI" including necessary
formwork, centering, scaffolding,
compaction by vibrator, curing as directed
with all lead & lift etc complete without
dewatering and excluding the cost of steel
Abutment / Pier / Bottom slab of barrel /
Plinth course / Coping / Approach Slab
etc.(a) Concrete grade M-15 and MSA-20
Percentage Calculation
Name of work :- Restoration to Jalsan Distry by providing C.C.lining in between ch. 3200 to 3550 mt. & construction of key wall in between ch. 3200 to 6300 mt.
Quantity Item Rate Unit Total amount Labour Total Labour Cement Total Cement Steel per Total Steel Bitumen Total PoL Per Total PoL cost Machiner Total Other Total Other TOTAL cost Total Item Cost Total %
Quantity Item Rate Unit Total amount Labour Total Labour Cement Total Cement Steel per Total Steel Bitumen Total PoL Per Total PoL cost Machiner Total Other Total Other TOTAL cost Total Item Cost Total %
Sr. Estimated but according to estimated Rs. Per Cost Per Unit Cost Unit Cost Per Unit Bitumen Cost Unit y Per Unit Machinery Comodity Comodity Cost per Unit
No. may be more Rs. Unit Cost Per Unit
Providing & Laying in position "DESIGN
MIX" cement concrete using cement sand
and crushed aggregate for C.C./ R.C.C
work by "FLORI" including necessary
formwork, centering, scaffolding,
compaction by vibrator, curing as directed
with all lead & lift etc complete without
dewatering and excluding the cost of steel
reinforcement.(B) For Pier and Abutments
/ Wing wall / Head wall / Return wall /
Dowel Wall etc.(g) Concrete grade M-15
Signature of Contractor Deputy Executive Engineer Executive Engineer
Petlad Irrigation sub Division Petlad Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Notice 21 of 2025-26 online.pdf
1.Front page.pdf
3.Notice Inviting Tender.pdf
4.SBD.pdf
5.iTEMWISE SPECIFICATION.pdf
Schedule B.pdf
Download all tender documents and submit your bid