| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr | L1 | Accepted-AOC Agreement executed |
| 2 | L2₹1.5 Cr+₹20.2 L (15.9%)Rejected-AOC | ₹1.5 Cr+₹20.2 L (15.9%) | L2 | Rejected-AOC Agreement executed |
| 3 | L3₹1.6 Cr+₹37.2 L (29.2%)Rejected-AOC | ₹1.6 Cr+₹37.2 L (29.2%) | L3 | Rejected-AOC Agreement executed |
Tender Value
₹1.3 Cr
EMD Value
₹50,000
Closing Date
24 Aug 2021, 6:00 pmClosed
Superintending Engineer HESC TVM
Superintending Engineer, Harbour Engineering South Circle, Kamaleswaram, Manacaud (PO), Thiruvananthapuram-9
Construction of RCC drain, coconut piling, WMM, 20mm thick open graded pre-mix chipping carpet, filling with quarry muck
2021_HED_425403_2
01/HESC/2021-22/S
Open Tender
Civil Works - Roads
Item Rate
300 days
Mayyanad gramapanchayath in Eravipuram LAC
Please refer Tender documents.
5 documents required · 5 mandatory
₹6,570
Yes
₹50,000
Yes
18 Dec 2021
10 Aug 2021
26 Aug 2021
10 Aug 2021
24 Aug 2021
10 Aug 2021
Amount
APPENDIX -A -CONSTRUCTION OF DRAIN
3.3 : Construction of Embankment with Material Obtained from Roadway Cutting <br> Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5
14.1 : Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301
11.4.1.1 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203I.P.C.C grade M 10(i)Nominal mix 1:3:6
11.4.5 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203V. R.C.C. grade M 25
11.8 : Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
Appendix B Coconut pile
60.64.1 : Coconut Pile - Supplying and stacking well matured straight coconut post for driving down throug various strata bellow bed level including cost coveyance labour charges etc complete.
od7965/2020_2021 : Coconut Pile - Driving down coconut pile to lines and levels through soft to medium clay soil strata including all hire charges and labour for fixing , staging platform and all other appliances necessary for pile driving down after pointing the bottom end
60.64.6 : Cutting and removing the excess length of wooden piles to lines and levels and removing the cut end of piles and stacking within 150m
60.2.3 : Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
APPENDIX- C -Construction of Road
3.2 : Preparation of Foundation for EmbankmentScarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical MeansScarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
2.5.1.A : Dismantling of StructuresDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.(I)By Manual Means(A)Lime Concrete
od6419/2020_2021 : Wet Mix Macadam &lt;br&gt; &lt;br&gt;Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 &amp; 400.12 and Technical Specification Clause 406. &lt;br&gt; &lt;br&gt;By Mechanical Means with 1 km lead
5.1.1a : Prime Coat :- Low porosity <br> Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
5.2.3a : Tack Coat <br>Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
od6420/2020_2021 : 20mm thick Open - Graded Premix Carpet using Bituminous ( penetration grade/modified bitumen) binder - Bitumen S-65and Shredded waste plastic (7% Providing, laying and rolling of open-graded premix carpet of 20mm thickness composed of 13.20mm to 5.60mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 KN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508 - Case II By Mechanical Means :- Bitumen S - 65
5.12.B.3.2a : Seal Coat - Mechanical Means - Type C - Bitumen S-65 <br> Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 <br> B. By Mechanical Means :- Case - III : Type C <br> (II) Bitumen (S-65)
Filling With Quarry Muck
51.2.3 : Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
THE BUILDING CONSULTANT AND TECHNOLOGICAL SERVICE COOPERATIVE SOCIETY LTD T 1054
SAR CONSTRUCTIONS
Bidder Name
Thomas. K
SAR CONSTRUCTIONS
THE BUILDING CONSULTANT AND TECHNOLOGICAL SERVICE COOPERATIVE SOCIETY LTD T 1054
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_616886.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .