Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-Finance | L1 | Accepted-Finance LQ1 | |
| 2 | L2₹1.7 L+₹2,301.56 (1.36%)Rejected-Finance | L2 | Rejected-Finance HQ |
Tender Value
₹1.7 L
EMD Value
₹4,228
Closing Date
1 Nov 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BIJU VG
LID_EW SULTHAN BATHERY MUNICIPALITY
Annual Plan_PR NO_609_2023_2024_SULTHAN BATHERY MUNICIPALITTY 2023_2024 PR NO_609 CONSTRUCTION OF SEPTIC TANK AT PAZHERY COLONY
2023_LSGD_615465_8
ET_02_2023_24_AE_LIDEW_SBYMC
Open Tender
Civil Works - Roads
Item Rate
180 days
Sulthan Bathery Municipality
Please refer Tender documents.
8 documents required · 8 mandatory
₹555
Yes
₹4,228
Yes
10 Nov 2023
25 Oct 2023
3 Nov 2023
25 Oct 2023
1 Nov 2023
25 Oct 2023
Amount
Septic tank
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
OD204817/2023-2024:Providing and fixing pre cast well ring 2.10 m dia including all cost conveyance of materials and all labour charges etc.. complet
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.22.1:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelMild steel and Medium Tensile steel bars
OD205093/2023-2024: Engaging man madzoor for arranging the pre-cast items
50.18.9.9.1:Providing and fixing PVC pipes includings jointing of pipes with one step PVC solvent cement, trenching, refilling & testing of Joints complete as per direction of engineer in charge.110 mm dia 6Kgf/cm2
SURESH MANI
Bidder Name
SURESH MANI
BALAKRISHNAN C M
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_922095.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .