Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 CrAccepted-AOC | ₹6.4 Cr | L1 | Accepted-AOC Lowest Rate Quoted |
| 2 | L2₹6.4 Cr+₹6.6 L (1.03%)Rejected-Finance | ₹6.4 Cr+₹6.6 L (1.03%) | L2 | Rejected-Finance High Rate Quoted |
Tender Value
Refer Docs
EMD Value
₹5.7 L
Closing Date
9 Mar 2024, 6:00 pmClosed
Chief Engineer Project Pushpak
HQ CE (P) Pushpak, CO 99 APO, Zemabawk, Aizawl, Mizoram
PDG AND LYG OF HMP READY MIX BC 30 MM TH INCL CLNG RD SURFACE APPLYING TACK COAT, CORRECTION WKS WITH BM 75 MM INCL RD MARKING FOR RE-SURF WKS ON VARIOUS LOC BET KM 40.00 AND KM 60.00 (NET LENGTH 19.855 KM) ON L-D-P RD UNDER 71 RCC PRO PSK IN MIZORAM
2024_BRO_643152_1
NIT-02 OF 2024-25
Open Tender
Civil Works - Roads
Item Rate
180 days
KM 40.00 AND KM 60.00 ON L-D-P RD
As per Tender Documents
8 documents required · 8 mandatory
₹0
₹5.7 L
Yes
HQ CE (P) Pushpak, CO 99 APO, Aizawl, Mizoram
22 May 2024
19 Feb 2024
11 Mar 2024
20 Feb 2024
9 Mar 2024
1 Mar 2024
20 Feb 2024 - 29 Feb 2024
24 Feb 2024
Amount
RESURFACING WORK ON LAWNGTLAI-DILTLANG-PARVA ROAD KM 40.00 AND KM 60.00 (NET LENGTH 19.855 KM)
Providing and laying of HMP ready mix Bituminous Concrete (BC) 30 mm thick compacted with bitumen VG-30 as per clause 507 of MoRT&H Specifications (Fifth revision) for road and bridge work , tack coat as per clause 503 of MoRT&H Specifications (Fifth revision) on the existing BT surface, correction work with BM 75 mm thick compacted as per clause No 504 of MoRT&H Specifications (Fifth revision) including Prime Coat as per clause 502 of MoRT&H Specifications (Fifth revision ) duly maintaining the road profile with paver finisher and rolled as per clause 501.6 and 501.7 of MoRT&H Specifications (fifth revision) to achieve desired compaction including all labourers, materials and machinery as specified and directed by Engg-In-Charge. Note: 1. The specification given in clause 3004.2 of MoRT&H Specifications (Fifth revision) will be complied while carrying out correction work. 2. The maximum area of correction work with BM 75 mm thick compacted will be 10% of the cost of BC 30 mm thick.
Edge road marking with thermo plastic paint 2.5 mm thick confirming to clause 803.4 of MoRT&H Specifications (fifth revision) including all labourers, materials and machinery as specified and directed by Engg-In-Charge.
BHANWAR LAL
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .