Tender Value
₹67.9 Cr
EMD Value
₹78 L
Closing Date
30 Jul 2026, 6:00 pmClosed
EXECUTIVE ENGINEER
O/O EE HPPWD DIVISION GHUMARWIN
Construction of way side amenities WSA at Auhar Phase-2 Distt-Bilaspur HP SH Heritage Haven AND Retail Block I/C landscaping, Furniture work, Electrical work, Plumbing work and Fire fighting work etc.
2026_PWD_139720_1
4112-18
Open Tender
Composite Works
Percentage
365 days
GHUMARWIN
AS PER SBD
27 documents required · 27 mandatory
₹80,000
EE GHUMARWIN DIVISION HPPWD
₹78 L
Yes
21 Sept 2026
23 Jul 2026
31 Jul 2026
23 Jul 2026
30 Jul 2026
23 Jul 2026
23 Jul 2026 - 29 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation work by mechanical means (hydraulic excavator)/ manual in all height and depths and in all kind of soil including saturated soils comprising of pick work, jumper work, pick jumper work, blasting work both in soft and hard rocks, chiseling/ wedging out of rock (where blasting is prohibited) and their intermediate classification of soil , setting out true to the required line, grades, width, cutting and trimming of side slopes as shown in the drawing and if water is met with in the excavation due to springs, seepage, rain and other causes it shall be removed by the suitable diversion pumping or bailling out and excavation shall be kept dry wherever so required by the contractor at his own cost as directed by the Engineer-In-Charge and disposal all surplus excavated soil in acquired width or at an approved dumping site ( to be arranged by the contractor) including its stacking leveling dressing including all lead and lifts by head load, mechnical transportation or by any other mode of transportation with all cost of labours, machineries and other incidentals to complete the work as per HP PWD specification. Any loss to the public/ private property during the course of execution and disposal of unserviceble metreial shall be the absolute responsibility of the contractor which shall have to be compensated by him in all case. The rate is including octroi, royality, Malkana, toll tax, GST or other taxes imposed by the Government. | 9,659.9 | Per Cubic Metre | 246.55 | ₹23,81,648.35 |
| - | Treatment of soil under floors using chemical emulsion @ one litre per hole, 300 mm (Three hundred milimetre) apart including drilling 12 mm (Twelve millimetre) diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor : With Chlorpyriphos/ Lindane E.C. 20% (twenty percent) with 1% (one percent) concentration. , including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 3,366.37 | Per Square Metre | 218.1 | ₹7,34,205.3 |
| - | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm (twenty centemetre) in depth, consolidating each deposited layer by ramming and watering, upto all lead and lifts. , including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 5,346.48 | Per Square Metre | 210.75 | ₹11,26,770.66 |
| - | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 506.31 | Per Cubic Metre | 2,055.4 | ₹10,40,669.57 |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering in 1:4:8 (one cement : four coarse sand : eight graded stone aggregate) 40mm ( forty millimetre) nominal size graded stone aggregate upto plinth level all work, including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 2,012.81 | Per Cubic Metre | 5,867.85 | ₹1,18,10,867.16 |
| - | Providing and laying damp-proof course 40mm ( forty millimetre) thick with cement concrete 1:2:4 ( one cement : two coarse sand : four graded stone aggregate 12.5mm ( twelve point five milimetre nominal size including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 200.56 | Per Square Metre | 350.5 | ₹70,296.28 |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering 1:2:4 (one cement : two coarse sand : four graded stone aggregate) 20mm ( twenty millimetre) nominal size graded stone aggregate upto plinth level all work , including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 32.56 | Per Cubic Metre | 7,044.88 | ₹2,29,381.29 |
| - | Providing and laying in position specified grade of Reinforced cement concrete including pumping of concrete to site of laying but excluding the cost of centering and shuttering finishing all work upto plinth level in machine batched and machine mixed designed mix M-25( M- Twenty Five) grade with minimum cement content not less than 330 Kg/cubic metre (Three Hundred Thirty kilogram per cubic metre), including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per design and technical specifications, including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 1,902.92 | Per Cubic Metre | 8,250.35 | ₹1,56,99,756.02 |
| - | Providing and laying in position specified grade of Reinforced cement concrete including pumping of concrete to site of laying but excluding the cost of centering and shuttering finishing all Work above to plinth level upto any floor level in machine batched and machine mixed designed mix M-25( M- Twenty Five) grade with minimum cement content not less than 330 Kg/cubic metre (Three Hundred Thirty kilogram per cubic metre), including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per design and technical specifications, including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 3,490.04 | Per Cubic Metre | 9,616.65 | ₹3,35,62,493.17 |
| - | Steel reinforcement of approved brand for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete work including cost of binding wire upto all floor level TMT of grade Fe-500D or more steel bars , including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 1,037.17 | Per Metrec Tonne | 1,00,351.62 | ₹10,40,81,689.72 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
cancelled_1.pdf
pdf • 0.41 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.71 MB
SBD70CRORE.pdf
Tender Documents • 5.73 MB
BOQ_207118.xls
BOQ • 2.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .