Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹23.4 LAccepted-Finance BHALLA FARM NO 8 SHYAMPUR RISHIKESH DEHRADUN UTTARAKHAND | DEHRADUN | UTTARAKHAND | 248001 | ₹23.4 L | 1 | Accepted-Finance L1 |
| 2 | 2₹23.4 LAccepted-Finance | ₹23.4 L | 2 | Accepted-Finance L2 |
| 3 | 3₹24.1 LAccepted-Finance 10 AMIT GRAM GUMANIWALA RISHIKESH | RISHIKESH | DEHRADUN | UTTARAKHAND | ₹24.1 L | 3 | Accepted-Finance L3 |
| 4 | 4₹26.5 LAccepted-Finance | ₹26.5 L | 4 | Accepted-Finance L4 |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Ramesh Prasad L3 | M/S PRATAP SINGH RAWAT L1 | PURSHOTAM DATT VYAS L4 | M/S RAJ BUILDERS L2 |
|---|---|---|---|---|---|---|---|
| 1.00Laying and Jointing PVC Pipe. Heading | |||||||
| 1.01 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction. | 171 | cum | 307.43 ₹52,570.53 | 380 ₹64,980 | 381 ₹65,151 | 381.9 ₹65,304.90 |
| 1.02 | Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material, labour and T&P etc. required for proper completion of the work. as per
drawings and technical specifications Clause 802, 803, 1202 & 1203 | 19 | cum | 3,830.91 ₹72,787.29 | 4,750 ₹90,250 | 4,752 ₹90,288 | 4,758.9 ₹90,419.10 |
| 1.03 | Providing and Laying RCC Pipe NP4 as per Design in Double Row Providing and laying reinforced cement concrete pipe for culverts on first class bedding of granular material in double row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets as per Clause 1106 | 190 | RM | 11,546.68 ₹21.9 L | 10,875 ₹20.7 L | 12,600 ₹23.9 L | 10,879 ₹20.7 L |
| 1.04 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications.M 15(1:2:4). | 19 | cum | 4,928.77 ₹93,646.63 | 6,122 ₹1.2 L | 5,400 ₹1.0 L | 6,122.7 ₹1.2 L |
Tender Value
Refer Docs
EMD Value
₹70,740
Closing Date
20 Apr 2026, 3:00 pmClosed
MUNICIPAL COMMISSIONER
NAGAR NIGAM RISHIKESH
Construction of drain from near lane no 02 upto AIIMS boundary in shivaji nagar ward no 26
2026_NNR_93978_1
65/ENIVIDA-NIRMAN/2026-27
Open Tender
Civil Works
RISHIKESH
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,950
Account Officer Nagar Nigam
₹70,740
Yes
12 May 2026
8 Apr 2026
20 Apr 2026
8 Apr 2026
20 Apr 2026
8 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Laying and Jointing PVC Pipe. Heading | ||||||
| 1.01 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction. | - | cum | - | - | itemH1Code1 |
| 1.02 | Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material, labour and T&P etc. required for proper completion of the work. as per
drawings and technical specifications Clause 802, 803, 1202 & 1203 | - | cum | - | - | code1.02 |
| 1.03 | Providing and Laying RCC Pipe NP4 as per Design in Double Row Providing and laying reinforced cement concrete pipe for culverts on first class bedding of granular material in double row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets as per Clause 1106 | - | RM | - | - | itemH1Code2 |
| 1.04 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications.M 15(1:2:4). | - | cum | - | - | itemH1Code3 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
TENDERDOCUMENTS.pdf
Tender Documents • 2.50 MB
BOQ_111226.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid