Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹6.7 L
EMD Value
₹6,665
Closing Date
26 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Dy.Minicipal Commissioner - West Zone
Constructing Gazebo at Aman akash road Jambuvan garden under Muni. Counsiler budget in Vasna Ward West Zone.”
366486
3/26-27 (T.N. 41)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹900
Municipal Commissioner, Ahmedabad
₹6,665
18 Nov 2026
18 Nov 2026
18 Nov 2026
26 Nov 2026
18 Nov 2026
120 days
Name of work:- Constructing Gazebo at Aman akash road Jambuvan garden under
Muni. Counsiler budget in Vasna Ward West Zone.
1 Excavation for foundation up to1.5 m depth including
sorting out and stacking of useful materials and
disposing of the excavated stuff upto 50 mt. lead.(A)
Loose or soft soil (Ahmedabad City Building SOR
a 12.00 0 to 1.50 mt.depth
2 13.00 Providing and laying cement concrete1:4:8 (1-Cement:
4- coarses and:8-hand broken stone aggregates
40mm nominal size) and curing complete excluding
cost of formworkin (A) Foundation and Plinth (upto
ton). (Ahmedabad City Building SOR 2023-24)
3 Brick work using common burnt clay building bricks
having crushing strength not less than 35kg./Sq.Cm.in
foundation and plinth in Cement Mortar1:6 (1-Cement
:6 - fine sand) (Ahmedabad City Building SOR 2023-
A 4.00 (A) Conventional (upto 10 ton) 3981.21 Cmt
3 Extra Rate for brickwork in Above Item for super
structure above plinth level upto floor two level
(Ahmedabad City Building SOR 2023-24)
B 4.00 (A) Conventional (upto 10 ton) 272.25 Cmt
4 Providing and laying controlled cement concrete /
Ready Mix Concrete of M-200 and curing complete,
excluding the cost of form work and reinforcement for
reinforced concrete work in:(Ahmedabad City Building
9.00 (C) Slabs, landing shelves, Balconies, lintels, beams,
girders, and cantilever, up to floor Four level. 4460.36 Cmt
5 Providing form work in ordinary timber planking so as
to give a rough finish including centering,shuttering
strutting and propping etc height of propping and
centering below supporting floor to celling not
exceeding 4M &removal of the same fo in situ
reinforced or plain concrete work upto floor four level
(Ahmedabad City Building SOR 2023-24)
10.00 (H) Sides and soffits of Beams Beam Haunchings
cantilevers Girders Bressumers and Lintels not
exceeding 1 M. in Depth 192.15 Smt
6 250.00 Providing TMT Bar FE 415 reinforcement for R.C.C.
work including bending, binding and placing in position
complete upto floor two level (Ahmedabad City
Building SOR 2023-24)
7 5.00 Filling available excavated earth (excluding rock) in
trenches. plinth, sides of foundations etc. in layers not
exceeding 20 cm. in depth consolidating each
disposited layer by ramming and watering.
(Ahmedabad City Building SOR 2023-24)
8 0.00 Filling in plinth with sand under floors including
watering ramming, consolidating and dressing etc.
complete. (Ahmedabad City Building SOR 2023-24) 455.63 Cmt
9 60.00 Providing & Laying 18 mm th. Mirror polish granite
flooring for counter, stair -riser,tread,skirting, dedo etc.
machine cut or chiselled on bed of cement mortar 1:1
pointing with neat cement slurry incl.moulding
etc.comp. as per instruction of engineer in charge.
(Appr. Rate) 2690.00 Smt
10 55.00 P/F grouting with epoxy branded material filling with
groove cutting of 2 to 3 mm in tiles flooring and
cladding work etc. comp. by as per engineer incharg.
(Appr. Rate) 260.00 Smt
11 1400.00 Providing and fixing MS grills of required pattern to
wooden frames of windows etc. with M.S. flats at
required spacings and frame alround, square or round
bars with round headed bolts and nuts or by screws
(A) Plain Grill. (upto 10 ton) (Ahmedabad city Building
12 68.00 Providing 0.60mm thick Powder coated Naliya Pattern
G.I. Sheet roofing, and Fixing sheet in 45 degree
shape and Trepezoidal portion pattern & Fixed with
Leak proof Stud Bolts and washers. including cost of
side Ridge on Joint Portion of sheets. All Framming
work done on site with Cutter, generater etc. comp. as
directed by engg.incharge (As per RA)
13 25.00 Providing & Fixing MS Decorative Boarder patta in
Gazebo Purlins rate includes Cutting, welding & Fixing
etc. comp. as directed by engg.incharge 410.00 Rmt
14 1.00 Providing & Fixing Decorative colour full light in
Gazebo rate includes Wiring, Switch board, Switches,
MCB Piping etc. comp. as directed by engg.incharge 5960.00 Job
15 7.00 Providing and fixing Ornamental design decorative CI
garden benches incl. painting with synthetic enamal
paint and fixing FRP 4'5''x3" streep betten on sitting
portion LN KEY SS fasteeners for FRP streep fitting
MS rod 4.5 feet length etc.comp. incl. SS name plate
of councillour etc. comp. as directed by engg. in
charge (As per RA)
16 2.00 Councilor/MLA Name Granite Engraving Takti, Size: 2'
x 1' (Appr. Rate) 4000.00 Job
17 6.00 Providing & Fixing Stainless steel 304 grade 50mm
outer dia meter 14 guage Railing with 2 nos horizontal
& 1.20 mt. clear vertical pipe 1 mt. c/c with buffing SS
pipe. including cutting, bending fixing in position and
Fixing SS Article cap in bottom of pipe. Rate also
includes Fixing pipe in bottom with flling material of
bombay masala etc. Complete as per the instruction of
engg. in charge (Appr. Rate)
18 Providing and supplying of labour for necessary
excavation, cleaning, Shifting of Material Or any other,
or for any other work as directed by Engineer In
charge. (Ahmedabad City Building SOR 2023-24)
d 4.00 Mazdoor at Day Male 493.00 No
19 32.00 Supplying and fixing of 300 mm-L x 150 mm-B x
mm-H Kerb block for Footpath in M-20 grade using
20mm nominal (Appr. Rate) 350.89 Rmt
20 5.00 Conveyance charges of earth lime, murrum, building
rubbish, manure, garbage, sludge, excavated rock, fly
ash, aggregate of any kind etc. comp. upto 5 km lead.
(Ahmedabad City Building SOR 2023-24)
Seal and Signature of the Bidder Add.City Engineer
Date: (West Zone)
Tender Fee Rs.900.00
Earnest Money Rs.6665/-
Contractor’s Name & Address :
MEMORANDUM OF WORK IN BRIEF
Constructing Gazebo at Aman akash road Jambuvan
garden under Muni. Counsiler budget in Vasna Ward
1. Name of Work West Zone
Rs. 6,66,302.46 (exclusive of GST). GST will be paid extra by
2. Tender Estimated Cost
AMC/Authority at prevailing rate to the contractor.
1% of the Tender Cost in the form
3. Earnest Money
(D.D./Pay Order / Local Micr Check/B.G.)
4 Tender Fee Rs Demand Draft of Rs.900.00
6. Time-Limit 04 months
7. Validity Period 120 Days
8 Eligibility Criteria Register “E2” class in PWD in Govt. R&B/CPWD/AMC or equivalent
registration with any other state Govt. or institutions.
(i) Last Date of Submission of the Tenders from the AMC website www.amc.nprocure.com &
9 www.nprocure.com shall be down loaded from AS PER TENDER
Tender NOTICE INVITED
a) In Sealed cover in duplicate copies by Registered Post A.D,or by
(ii) Mode of Sending Courier.or hand delivery
b) Tender sent by ordinary post will be rejected out right.
(iii) Description essential to be
a) Name of work, Tender Notice No. & Tender No.
made on sealed cover b) Date of receiving tender by Corporations.
(iv) Mode of quoting rates in
The Price bid shall be submitted online only shall not be submitted
Schedule of Quantities and Rates Physically.
10 Date of Opening Tenders from the AMC website www.amc.nprocure.com &
www.nprocure.com shall be down loaded from AS PER TENDER
Submission of EMD. Tender fee and other Documents during office
Place of Submission & Opening
11. hours: West Zone, 2nd Floor, A.M. Office, Stadium Sub Zonal Office,
Nr. Panchshil Water Tank, Naranpura Railway Crossing Ahmedabad
(1) Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2)
Rs.2500 per day (for tenders amounting above 10 Lakhs and upto
12 Penalty Due to Delay of Lakhs), (3) Rs.5000 per day (for all tenders amounting
work above 30 Lakhs) but not more then 10% of bill
13 Defect Liability As per ‘B-1 Form Close
Whenever a work is allotted by Engineering staff, whether minor or
major of part thereof of any amount, the contractor shall be bound to
Time permitted to start parts start the works within 48 hours of intimation of work. Communication
14 ofwork done telephonically via SMS, Via Whatsapp and through letter / E-
mail shall be considered legal and binding for the same. Failure of
comply to start the works in 48 hours of intimation as above by
contractor the contractor shall be levied penalty of (1) Rs.1000/- per day
(for tenders amounting upto 10 Lakhs), (2) Rs.2500 per day (for tenders
amounting above 10 Lakhs and upto 30 Lakhs), (3) Rs.5000 per day
(for all tenders amounting above 30 Lakhs). Three times failures by
contractor shall makecontractor responsible to be black listed unless and
otherwise justified properly in writing / binding within 15 days of last
notice of penalty.
The staff of the contractor shall wear safety jackets, hoes, helmets etc.
while on duty and any violation will attract fine of Rs.5,000/- for each
15 Safety Failure to erect safety signage or trying to carry out he works without
proper precautions/safety measures as equired will attract a fine of Rs.
5,000/- for each incident.
16 Defect &Liability Period The contractor shall be responsible to make good and remedy at his own
expense any defect which may develop or may be noticed before the
period mentioned hereunder from the certified date of completion, The
within 15 days of receipt of the notice. In the case of failure on the part
of the contractor, the Engineer-in-charge may rectify or remove or re-
execute the work at the risk & cost of the contractor. The Engineer-in-
charge shall be entitled to appropriate the whole or any part of the
amount of security deposit towards the expenses, if any, Incurred by him
in rectification, removal or re-execution. The Defects Liability period
shall be as under(a) for all works costing upto Rs. 50,000 ( amount put to
tender), the period shall be 3 months from the certified date of
(b) for all works costing more than Rs. 50,000 and upto Rs. 1 crore
(amount put tender), the period shall be 6 months from the certified date
of completion or one monsoon, whichever is later.
(c) for major projects costing more than Rs. 1 crore, the period shall be
12 months from the certified date of completion which should include
(d) For building works, the period specified in (a), (b) or (c) above OR
elapse of monsoon period following the certified date of completion,
whichever is later. For the purpose of deciding the monsoon period, the
30th September may be treated as the last date.
17 Time permitted to start parts of work Whenever a work is allotted by Engineering staff, whether minor or
major of part thereof of any amount, the contractor shall be bound to
start the works within 48 hours of intimation of work. Communication
done telephonically via SMS, Via Whatsapp and through letter / E-mail
shall be considered legal and binding for the same. Failure of comply to
start the works in 48 hours of intimation as above by contractor the
contractor shall be levied penalty of (1) Rs.1000/- per day (for tenders
amounting upto 10 Lakhs), (2) Rs.2500 per day (for tenders amounting
above 10 Lakhs and upto 30 Lakhs), (3) Rs.5000 per day (for all
tenders amounting above 30 Lakhs). Three times failures by contractor
shall make contractor responsible to be black listed unless and
otherwise justified properly in writing / binding within 15 days of last
notice of penalty.
18 Compensation for Delay 10% of Remaining work (As per Circular)
19 Addendum/Corrigendum Addendum/Corrigendum If any Shall be Published 48 Hrs. Price To the
Final Submission Time And Date. The Same Shall From a part Of
Tender And The Same As to be Attached Along With The Tender
20 EPF Act As per Acoount Department circular no-37 Date:09/08/2018
21 GST GST will be paid extra by AMC/Authority at prevailing rate to the
Contractor's Sign Add.C.E.(west zone)
AMC Finance dept. circular No – 41, Dt.08/02/2022
(A) Guarantees issued by following banks will be accepted as SD/EMD on permanent basis.
(1) All Nationalized Banks
(B) Guarantees issued by following banks will be accepted as SD/EMD for the period up to March-
2022. The validity cut-off date in the GR is with respect to the date of issue of Bank Guarantee
irrespective of the date of termination of Bank Guarantee. Guarantees issued or Authorized by
Ahmedabad Branch Only.
(1) Commercial Banks:
(3) ICICI Bank.
(5) Kotak Mahindra Bank
(6) IndudInd bank
(8) Tamilnadu Mercantile Bank
(9) Ujjivan Small Finance bank
(10) A U Small Finance Bank
(11) Fedaral Bank Bank
(12) Equitas Small Finance bank
(13) Bandhan Bank
(14) Standard Chartered Bank
(2) Co-Operative & Rural Banks of Gujarat
1. The Mehsana Urban Co-operative Bank Ltd
2. The Ahmedabad Mercantile Co-Operative Bank Ltd
3. Nutan nagrik Sahakari Bank Ltd
4. The Kalupur Commerical Co-operative Bank Ltd
5. Rajkot Nagarik Sahakari Bank Limited
6. The Gujarat State Co-Operative Bank
7. Sarswat Bank
8. Saurashtra Gramin Bank
Seal and Signature of the Bidder Addl City Engineer
1. NOTICE INVITING TENDER (NIT)
TERMS & CONDITIONS
( A ) INSTRUCTIONS TO BIDDERS (ITB)
( B ) GENERAL TERMS & CONDITIONS
( C ) FINACIAL TERMS & CONDITIONS
( D ) MAIN CONDITION / FETURES OF THE WORK
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( A ) INSTRUCTIONS TO BIDDERS (ITB)
1. Procedure for Submission of Tender
a). The Bidder should quote the price bid in tender form before schedule time Tender Document, tender
fee & EMD (Draft /DD) and all other enclosures as asked in tender.
b).The bidder shall submit the following Tender documents physically in hard copy in two separate
envelope (marked as “original” and other marked as “Duplicate”) in schedule time by RPAD/ Speed
Post/ Hand Delivery in duplicate. The Bid envelopes shall be marked as follows:-
Tender Document
Registration certificate of class
c).The envelope shall be addressed to the Employer at the following address:
Asst. Manager (Admin) West Zone,
2nd Floor,Dr. Ramanbhai Patel Bhavan,
Usmanpura, Ahmedabad Municipal Corporation,
W.Z. Office, Ahmedabad-380013
d).Bear the following identification:
“TO BE OPENED ONLY IN PRESENCE OF THE EVALUATION COMMITTEE”
e). Indicate the name and address of the bidder.
If the outer envelope is not sealed and marked as above, the Employer will assume no responsibility
for the misplacement or premature opening of the bid.
f).All information has to be typed or hand written legibly. All pages of the Bid have to be initialed by
g) All The Bid Document Essentially Needs to be Properly binded/steppled
2. Assessment of Submission
2.1 The Employer will open the technical bid of physically submitted document of all the bids received
for the package (except those received late) containing the sealed Tender volume and other
enclosures then announce the names of bidders in the presence of bidders or their representatives
who choose to attend on the date and time mentioned in the NIT In the event of specified date of bid
opening being declared as a holiday for the Employer, the Tender will be opened at the appointed
time and location on the next working day.
2.2 In Physical submission, Bidders detailed and tender fee, E.M.D. shall be opened first. The Employer
at the opening will announce bidder’s names, , the presence/or absence of EMD, the amount and
validity of EMD furnished with each bid, is valid registration and such other details, as the
Employer may consider appropriate.
2.3 The Employer will determine whether the bid is accompanied by the required EMD.
2.4 If the EMD furnished does not conform to the amount and validity period as specified in the
Invitation for Bid and has not been furnished in the form, the bid shall be rejected by the Employer
as non-responsive and the Tender volume will be returned to the bidder.
2.5 Subject to confirmation of the EMD by the issuing bank, the Tender volume accompanied with
valid EMD will be taken up for further evaluation. In case, the Bank does not confirm the EMD, the
bid shall be rejected as non-responsive and no further evaluation carried out.
2.6 The tender volume will further be examined to determine whether the bid has been properly signed,
meets the eligibility and qualification criteria, has the required available bid capacity, is
accompanied by the requisite certificates, undertaking and other relevant information specified in
the bid documents and is substantially responsive to the requirement of the bidding documents and
provides any clarification for ascertaining the correctness of the information/details.
2.7 If the Tender volume is not substantially responsive, it will be rejected by the Employer and will not
subsequently be made responsive by correction or modification or withdrawal of the nonconforming
deviation or reservation.
3. Evaluation and Comparison of Tender volume
The Employer will evaluate and compare only those Tender volumes which are determined to be
substantially responsive in accordance with Clause 2 and qualified for award of Contract in
accordance with Clause 5 (General Terms and Condition).
4. Procedure for Tender Opening
Received copies of tender in physical form with in schedule time, will be open on schedule date and
time. In the event of specified date of bid opening being declared bidders who qualify the criteria
then bidder bid will be considered for opening of price bid.
5.1 The Employer will award the Contract to the bidder whose bid has been determined to be
substantially responsive to the bidding documents and who has offered the lowest Evaluated Bid
Price, provided that such bidder has been determined to be (i) eligible in accordance with the
provisions of Clause 3(General Terms and Condition); and (ii) qualified in accordance with the
provisions of Clause 5(General Terms and Condition).
6. Notification of Award
6.1 Prior to expiration of the period of bid validity prescribed by the Employer, the Employer will
notify the successful bidder by cable/fax and confirmed by registered letter that his bid has been
accepted. This letter shall name the sum which the Employer will pay the Contractor in
consideration of the execution, completion and maintenance of the Works by the Contractor as
prescribed by the Contract.
6.2 The notification of award will constitute the formation of the Contract.
7. A successful Bidder has to deposit security deposit / Bank Guarantee as per Circular after receiving
letter of Indent. Time limit of work will commence from the date of issue of work order.
8. Clarification of Bids
8.1 To assist in the examination, evaluation and comparison of bids, the Employer may, at his
discretion, ask any bidder for authentication the correctness of the information/details furnished by
him in his bid. Such request by the Employer and the response by bidder shall be in writing or by
8.2 Subject to above clause, no bidders shall contact the Employer on any matter relating to his bid from
the time of bid opening to the time contract is awarded.
8.3 Any effort by the bidder to influence the Employer in the Employer’s bid evaluation, bid
comparison or contract award decisions may result in the rejection of his bid.
9.1 Information relating to the examination, clarification, evaluation and comparison of bids and
recommendations for the award of a contract shall not be disclosed to bidders or any other persons
not officially concerned with such process until the award to the successful bidder has been
announced. Any effort by a bidder to influence the Employer's processing of bids or award
decisions may result in the rejection of his bid.
10.1 The bidder is advised to visit and examine the Site of Works and its surroundings and obtain for
itself on its own responsibility all information that may be necessary for preparing the bid and
entering into a contract for construction of the Works. The costs of visiting the Site shall be at the
bidder’s own expense.
10.2 The bidder and any of its personnel or agents will be granted permission by the Employer to enter
its premises and lands for the purpose of such inspection, but only upon the express condition that
the bidder, its personnel and agents, will release and indemnify the Employer and its personnel and
agents from and against all liability in respect thereof and will be responsible for death or personal
injury, loss of or damage to property and any other loss, damage, costs and expenses incurred as a
result of the inspection.
11.0 Cheklist for submition of Technical Bid.
11.2 valid Registration Copy.
11.3 Valid E.M.D
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( B ) GENERAL TERMS & CONDITIONS
1. Scope of Bid
1.1 The Ahmedabad Municipal Corporation hereinafter called "the Employer" invites Tender document
for the construction of works (as defined in these documents, hereinafter referred to as "the Works")
detailed in the table given in the IFB.
1.2 The Works consist of: “as Above "
Source of Funds
1.1 The expenditure on these Works will be met by AHMEDABAD MUNICIPAL
3. Eligible Bidders
3.1 This invitation for bids is open to bidders who has necessary bid capacity and who meet the
following requirements:
A bidder shall not be under a declaration of ineligibility for corrupt or fraudulent practice.
The bidders shall have a registration with State PWD, and/or CPWD for "E2" class and or
equivalent. If contractor is not registered with AMC in the relevant class, on award of contract
he shall be required to register himself with AMC within 3 month's time.
Bidders shall provide such evidence of their continued eligibility satisfactory to the Employer, as the
Employer shall reasonably request.Subject to Submition of Succsesful Submition as per Clause –II of
4. Eligible Material, Equipment and Services
4.1 At the Employer's request, the bidder having offered the lowest evaluated financial bid may be
required to provide evidence of the origin of materials, equipment, and services to the satisfaction of the
4.2 For purposes of Sub Clause 4.1, "origin" means the place where the materials are mined, grown,
produced or manufactured; similarly for equipments and from where the services are provided.
5. Qualification of the Bidder
To be qualified for award of Contract, bidders shall:
a) Submit a written power of attorney authorizing the signatory of the bid to commit the bidder; and
AHMEDABAD MUNICIPAL CORPORATION
T he w or k s h a l l b e c omp l et e d wi t h 0 4 M o n th s aft er t he or der t o sta r t t he w or ks .
T he d et a i ls of r ei nf or c em e nt o f R. C. C . w or k s ha ll be a s p er de si gn a n d i ns tr uc t i ons of Ci t y
E ngi n e er /A d d l . C it y E n g in e er a n d hi s or d er wi l l be c on si d er e d f i nal .
T he c on t rac t or s ha l l ha ve t o m ai n ta i n a cc ou n t of s te el, ce m e nt a nd ot he r m at e r ia l s t hat ma y be
br ou gh t b y h i m on s i te. T h i s acc ou n t s ha l l be r e gu l arl y m a i n ta i ne d a nd ke pt ope n f or i ns pe c ti on b y
M u n ic i pa l St a ff. Wa t eri n g of all t h e i t e m s s ha l l b e a s per i n s tr uc ti ons . M i xi n g of c oncr et e s ha l l be
don e b y c on cr et e m i xer mac h i ne. Arra n g e me nt s of b i n di n g vi br a t or f or R. C. C. w or ks i f re q ui r e d
T he c on t r ac t o r s hal l be r e m ai n re s p on s i bl e f or W or km e n ’ s c omp e nsa t i on i f a n y w he n s uc h cas e
oc c ur s. T h e c on tr act or s ha ll a r ra n ge f or me d a mpe rs a n d i n n i gh t a nd he s ha ll be r e s p ons i bl e f or an y
da m a ge of l if e a n d li m b or pr op e rt y i f a n y h a p p en, d ur i n g t he e xec ut i on of w or k. I n ca se of di s put e
f or u n s e e n or ove rl o o k e d i te m s t he dec i si on of th e c i t y E n gi n ee r / A dd l. Ci t y E ngi neer s ha ll be f ina l.
T he c on tr act or s h al l h a v e t o gi ve s i te c le a n o f a ll r u b bi sh on c om pl e ti on of w or k a nd ha ve over th e
bui l di n g w it h fi n a l f i ni s hi n g of t h e w or k a s di r ect e d . Al l t h e r e j e cte d ma t eri al s s ha l l be r e m ove d
f rom s it e w i t h i n 2 4 h ou r s b y c o n t ra ct or at t hi s r i s k a n d c os t .
For m i xi n g mor tar e i t he r f or m a s on r y or f o r p la s t er or f o r a n y ot her pur p ose c ont rac t or s ha l l ha v e t o
pr e p ar e t h r o u gh of b i g g e r si z e a n d m i x t he mor t ar i n t he r e q u ir e d pr op or ti on. In on ca s e he s ha l l be
all ow e d t o m i x t h e m or t ar ei t her on fl o o r or a n y f i ni s he d s urf ace s .
pa y t he wa t e r c har ge s as p e r w a ter me t er.
If a n y e x t ra i t e m cr op s u p d ur i n g t he pr o gr e s s of w or k t h e sa m e s ha ll be c ar r i e d out b y t he
c on tr a c t or a n d h e s ha l l b e pa i d at t he ra t e f i xe d b y C .E . /A dd l. C i t y E ngi nee r a s pe r t he ra t e
an al ys i s b as e d on c u rre n t mar ke t r a t e s .
If i n t h e i n ter e s t of t he C or p or at i on it i s n e ce s sa r y t o c ha n ge e i t her a n y si te or t he de si gn of t h e
pr op os e w or k t he c on tr a ct or s ha l l car r y ou t t h e sa m e a t h is q u ot e d r a t e s wi t ho ut c har ge s a n y e xt r a
an d t h e c on t r a c t or w il l ha ve t o c arr y ou t t he w o rk s a n d he w i l l b e pa i d at t he r at e q uot e d b y hi m a n d
T he c u b ic al c on t e nt s of th e c e me n t ba g s ha l l be t a ke n a s 1- 2 0 c f t. Pe r ba g a n d t h e c ontr a c t or s s ha l l
ha ve t o p r e par e t h e me a s ur e s b ox e s ac c or d i n g t o t h i s m ea s ur e.
T he R. C. C. or s pe c i fi e d w or k s hal l n ot be d o n e on S u n d a y a n d hol i d a y e x c e pt i ng e me r ge n c y or
w he n tec hn i c al r e q ui r e me n t s a re s uc h t h at c on t in u i t y of wor k s h oul d b e ma i nta i ne d a nd t ha t t o w i ll
be w i t h pri or per mi s si on of t he c om p e te n t a u t h or it y.
Re te n ti on m on e y a t t h e r ate of 2 % s hal l b e de d uc te d f r om e ve r y r u nni n g bi l l of t he c ont ra c t or an d
w hic h w i ll be pa i d a t t h e ti m e of fi na l bi ll .
C on t r ac t o r wi ll be f u ll y r e s p on s i bl e f or c om p l ia n ce of t h e var i ous p re vi si on un der c ont r act Ac t .
19 7 0 a n d t h e R ule s fr a m ed f or t o u n d er .
T he te n der f or t h e w or k s h al l re m a i n op e n f or a per i od ( 1 2 0) da ys f r om the d a te of ope ni ng of th e
te n der s f or t hi s w or k a n d t he te n de r er s hal l n ot be al l ow e d t o wi t hdr a w on m odi f y t he off e r on hi s
ow n d ur i n g t h e pe ri o d . If a n y t e n de re r wi t h dra w or ma ke s a n y m od i f i c at i ons ( s) or a ddi ti on ( s) i n
th e ter m s a n d c on d i t i on s of h i s t e n de r n ot a c ce pt a bl e t o t he M u nici pa l C or por a t i on , t he M un ic ipa l
C or p or a t i on s h a l l wi t h o ut p re ju d i ce t o a n y r i gh t o r r e m e d y b e at l i ber t y t o f or f e i t i n f ull t h e s a i d
ear ne s t m on e y a b s ol u t el y.
As p e r Cir c u la r No. M C R 2 1 7 6 (9 6 ) 2 4 1 8 ( ii ) G HH da te d 3 1- 0 3- 7 7 i ss u ed b y G o ve rn m e nt of G uj ar a t
c on tr a c t ors ar e re q u e s t ed t o pr od u c e t he i r q u ar r y m at e r ia l s f or c on s tr uct i on w or k t hr ou gh l e ga l
s our c e s. i .e. on l y f or m th e q ua rr y l ea s e h ol d e r s, per mi t h ol d er or m i d dl e ma n w h o s a ti s fi e s t he
c on tr a c t or as t o t he le ga l i t y of t h e s our c e of p ur ch as e b y h i m on t he se m at er ia ls .
If t he wor k i s n ot c ar ri ed ou t wi t hi n t h e s p ec i f i e d t i me l i mi t p e na lt y w il l be c har ge d a p pli c a bl e a s
per A M C R ul e s .
ii) Al l t e n de rs ar e t o be su b mi tt e d i n d u pl i c ate wi t h ou t w hi c h t he t e nd ers a re l i a bl e t o be
iii ) I n c a se of t e n der d ow n l oa d e d fr om we b si t e, te n de r f ee & E M D s h oul d be s ub mit te d i n f or m
i v) C on d i t i on of f or m B 1 St an da r d S pec if ic a ti o n of ma te ri a l & c o de of pr a ctic e w il l be
a pp l i c abl e. F or m B 1 & B 2 c a n b e i s a v a i l a ble i n we b s i t e. C ond it io n of F or m B- 1 F o r
Def ect l i abil it y C l a u s e is n o t a p p l i c a b l e F or t hi s W o r k.
t hi s W o r k & A s P e r i ns t r uc t i o n o f E n g g .i nc h a g e & a ls o Ge ner a l T ec h ni c a l Sp ec i f i c a t i ons f or
B ui l d i n g Works b ook a va i l a b l e from Gu j a r a t Book Stores (Pvt.) Ltd. Sector-
21,Gandhinagar,DE T A I L E D G E NE R A L T E C H N I C A L SP E C I F I C A T I O N S ca n be a vai l a bl e f r om
A h me da b a d M u n ic i pal C or p or a ti on w e bs it e “ ww w .e g o va m c. c om ” .
C o nt r ac t or’ s S i gn at ur e Ad d. Ci t y E ngi nee r
( W e st Zon e)
General information
All individual firms must complete the information in this form. Nationality information shall be
provided for all owner(s) or applicant(s) that are partnership or individually owned firms.
1 Name of firm:
2 Head office address With Contact no.:
3 Local office address (if any) With Contact no.:
4 Telephone/ Contact With name :
5 E-mail address:
6 Place of incorporation/registration:
7 Year of incorporation/registration:
Additional information regarding litigation, debarment, arbitration, etc.
Authorised Signeture Bidder
5.3 Disqualification
Even though the Bidders may meet the above criteria, they are subject to be disqualified for any of the
following reasons:
a) Misleading or false representation in the forms, statements and attachments submitted and included
b) Record of poor performance such as abandoning the work, rescinding of contract for which the
reasons are attributable to the non-performance of the contractor, consistent history of litigation
awarded against the applicant or financial failure due to bankruptcy.
c) Has been identified by the Employer as poor performer in implementation of ongoing AMC works.
d) The bidder fill (tender) in percentage rate above or below and total amount (both in figures and
d) The bidder fill (tender) in percentage rate above or below and total amount (both in figures and
words) only in E-Tender (Online) Not to fill in hard copy of Tender documents
5.4 Debarment/Black listing
Notwithstanding the above, the Employer may debar or blacklist any of the bidder(s) for their
misleading or false representations in the forms statements etc. for the period to be decided by the
6. One Bid per Bidder
6.1 Each bidder shall submit only one bid per contract package either by himself or as a partner in a
joint venture. A bidder who submits or participates in more than one bid for a contract package will be
7. Bidding Documents
The bidder is expected to examine carefully the contents of all the above bid documents. Failures to
comply with the requirements of bid documents will be at the bidder's own risk. Pursuant to Clause
bids which are not substantially responsive to the requirements of the bidding documents will be
8. Language of Bid
The bid, and all correspondence and documents related to the bid exchanged between the bidder and the
Employer shall be written in the English language. Supporting documents and printed literature
furnished by the bidder may be in another language provided they are accompanied by an accurate
translation of the relevant passages in the English language, in which case, for purposes of
interpretation of the bid, the English translation shall prevail.
9.1. Unless stated otherwise in the bidding documents, the Contract shall be for the whole works as
described in bidding documents, based on the percentage rate amount in the Bill of Quantities
submitted online by the bidder.
9.2. The bidder shall fill (tender) in percentage rate above or below and total amount (both in figures
9.2. The bidder shall fill (tender) in percentage rate above or below and total amount (both in figures
and words) for overall items of the Works provided in the Bill of Quantities
10. Bid Validity
10.1 Bids shall remain valid as per Instruction to Bidders (ITB) after that deadline date for bid
submission specified in Clause. The Employer as non-responsive shall reject a bid valid for a
shorter period.
10.2 In exceptional circumstances, prior to expiry of the original bid validity period, the Employer may
request the bidders to extend the period of validity for a specified additional period. The request
and the responses thereto shall be made in writing or by fax. A bidder may refuse the request
without forfeiting his bidder agreeing to the request will not be required or permitted to modify his
bid but will be required to extend the validity of his Bid Security for the period of the extension,
and in compliance with Clause 2 ( Financial Terms & Conditions) in all respects.
11. Format and Signing of Bid
11.1 The bidder shall prepare two copies of the documents comprising the bid as described in
Instructions to Bidders.
11.2 The bid shall be typed or written in indelible ink and shall be signed by a person or persons duly
authorized to sign on behalf of the bidder.
11.3 The bid shall contain no alterations, omissions or additions, except those to comply with
instructions issued by the Employer, or as necessary to correct errors made by the bidder, in
which case the person or persons signing the bid shall initial all such corrections.
11.4 All witnesses and sureties shall be persons of status and probity and their full names,
Occupations and addresses shall be printed below their signatures.
12. Deadline for Submission of Bids
Bids must be received by the Employer at the address specified above not later than the time and date
specified in the NIT.
Any bid received by the Employer after the deadline for submission of bids will be returned unopened
14. Signing of Agreement
At the same time that the Employer notifies the successful bidder that his bid has been accepted, the
Employer will direct him to submit the Performance Security and attend the Employer's office on a date
determined by the Employer for signing the Form of Agreement.
15. The selection process will lay high emphasis on the ability and competency of contractors to do high
quality work within the given time schedule.
16. The onus of providing, all necessary company / project related information, in appropriate manner
and medium, so as to demonstrate the competency of the bidder and to allow proper evaluation, will rest
entirely on the Bidder.
17. All clause shall be operative from the date of issue of work order and up to the expiry of original
and extended time limit.
18. Legal Condition:-
Corrupt or Fraudulent Practices
The Employer will reject a proposal for award if he determines that the Bidder recommended for
award has engaged in corrupt or fraudulent practices in competing for the contract in question. The
Employer will declare the firm ineligible, either indefinitely or for a stated period of time, to be
awarded a contract by AHMEDABAD MUNICIPAL CORPORATION if it at any time determines
that the firm has engaged in corrupt or fraudulent practices in competing for the contract, or during
“corrupt practice” means behavior on the part of officials in the public or private sectors by
which they improperly and unlawfully enrich themselves and/or those close to them, or induce
others to do so, by misusing the position in which they are placed, and it includes the offering,
giving, receiving, or soliciting of anything of value to influence the action of any such official in
the procurement process or in contract execution; and
“fraudulent practice” means a misrepresentation of facts in order to influence a Procurement
process or the execution of a contract to the detriment of the Borrower, and includes collusive
practice among bidders (prior to or after bid submission) designed to establish bid prices at
artificial non-competitive levels and to deprive the Borrower of the benefits of free and open
Municipal Commissioner reserves the rights to reduce/increase the scope of work and contract
without assigning any reason thereof.
If Ahmedabad Municipal Corporation is convinced that the Bidder has resorted to material
misrepresentation or provided fraudulent information / statement, the said Bidder will be liable for
disqualification / rejection at any stage.
Proof for fulfillment of eligibility criteria should be submitted along with Tender volume. If the
Tender volume is submitted without valid documents and without proof of eligibility criteria it will
Those who do not meet with the eligibility criteria need not submit the Tender document.
Tenders, which do not fulfill all or any of condition or are submitted incomplete in any respect or
are conditional tenders, will be rejected.
Contractor shall be responsible to obey all Labour Laws, Environmental and Safety Laws.(the
existing laws as well as framed from time to time). Any penalties laid due to violation of such laws
shall be directly deducted from the contractor's outstanding.
19. Administrative Conditions:-
Safety and Signage
Contractor has to arrange for the complete safety of the persons working for project, users of the
road i.e. public and vehicles also. All the arrangements of traffic drums, metal / fiber cones, traffic
blinkers, traffic signs as per design, safety tapes etc. to be arranged at site. Necessary florescent
marking on traffic signs to be provided so that it should be visible at night. During night working
hours safety in charge personnel shall be provided with florescent jackets. This shall be Provided
at no extra cost by the bidder under attaché with specified in the tender documents under
Liaison with local authority for electrical connections for the AMC
The contractor is responsible for liaison with local authority for change in supply connection or new
connection on behalf of AMC. It includes filling the necessary application to power Supply
Company, follow up and getting the supply, filling the necessary test reports to the power supply
company. All official fees including security deposits and other expenses shall be of initially paid by
the contractor. AMC may support to get the temporary connection and may at its diseretien get
the same converted to permanent connection at the same of AMC if desired do,and contractor
shall as no extra cost support the same. In this case AMC my be as the remaining cost subject
20 :- CONTINGENT FEE:
The Contractor warrants that he has not employed any person to solicit or secure the contract
upon any agreement for a commission, percentage, brokerage or contingent fee. Breach of this
warranty shall give the Municipal Commissioner the right to cancel the contract or to take any
other measure as the Municipal Commissioner may deem fit. The warranty does not apply to
commissions payable by the contractor to establish commercial or selling agent for the purpose
of securing business.
No officer, employer of the Municipal Corporation be admitted to any share or part of this
contract or to any benefit that may rise there from.
21:- OVERPAYMENT AND UNDERPAYMENT:
Whenever any claim fourths payment of a sum to the Municipal Corporation arises out of or
under this Contract against the contractor the same may be deducted by the Municipal Corporation
from any sum then due or which at any time thereafter may become due to the contractor under
this contract and failing that under any other contract with the Municipal Corporation or from any
sum due to the contractor with the Municipal Corporation (which may be available with Municipal
Corporation), or from his retention money, or he shall pay the claim on demand. The Municipal
Corporation reserves the right to carry out post payment audit and technical examination of the
final bill including all supporting vouchers, abstracts, etc.
The Municipal Corporation further reserves the right to enforce recovery of any over payment
when detected not withstanding the fact that the amount of the final bill may be included by the
If as a result of such audit and technical examination any over payment is discovered in respect of
any work done by the Contractor or alleged to have been done by him under the contract, it shall
be recovered by the Municipal Corporation from the contractor by way of all the means prescribed
above or if any under payment is discovered by the Municipal Corporation, any amount due to the
contractor under this contract or under payment may be adjusted against any amount then due or
which may at any time thereafter become due before payment is made to the contractor from him
to the Municipal Corporation on any other contract account whatsoever.
If, at any time, there should be evidence of any lien or claim for which owner might have become
liable and which is chargeable to the contractor, the owner shall have the right to retain out of any
payment then due or thereafter to become due an amount sufficient to completely indemnify the
owner against such lien or claim or if such lien or claim be valid the owner may be or become due
and payable to the contractor. If any lien or claims remaining, unsettled after all payments are
made, the contractor shall refund or pay to the owner all money that the latter may be compelled to
pay in discharging such lien or claim including all cost and reasonable expenses.
Contractor shall not sub-let the work without permission of the authority.
Joint venture and subcontracting shall not be allowed under this tender
Addendum or corrigendum conveying any change or correction in respect of the work shall form the
part of the contract documents. The full consideration shall be given to such addendum or corrigendum
before submission of tender duly filled in by the contractor. Therefore, the contractors shall have to
kindly refer the tender for such addendum or corrigendum published by AMC through its website
www.amc.nprocure.com & www.nprocure.com 48 hours prior to the deadline of submission of the
tender. Tenderers shall verify the number of addendum issued and enclose the same with the tender
documents , failing which the tenders shall be liable for rejection and no any complaint in respect to this
shall be entertained under any circumstances.
Seal and Signature of the Bidder Addl. City Engineer
Date: (West Zone)
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( C ) FINACIAL CONDITION
1. Cost and Currencies of Bidding
The bidder shall bear all costs associated with the preparation and submission of his bid and the
Employer will in no case be responsible or liable for those costs.
Currencies of Bid and Payment
The rates and the prices shall be quoted by the bidder entirely in Indian Rupees
All payments including advances, if any, shall be made in Indian Rupees.
2. Earnest Money Deposit :-
2.1 Bank guarantees (and other instruments having fixed validity) issued as surety for the bid shall be
valid for 28 days beyond the validity of the bid.
2.2 The EMD of the unsuccessful bidders, except for L1,L2 and L3 bidders, will be returned as
promptly as Early as possible as but not later than 28 days after the expiration of the period of bid
2.3 The EMD of the successful bidder, along with second and third lowest tenders, will be returned
when the bidder has furnished the required performance security and signed the agreement.
2.4 Earnest Money Deposit may be forfeited
a) if the bidder withdraws his bid during the period of bid validity;
b) in the case of a successful bidder, if the bidder fails within the specified time limit to
i) Furnish the required Performance Security or
ii) Sign the Agreement.
3. (A) Security Deposit :-
Within 15 (fifteen) Working days of the date of receipt of the Letter of Intent (LOI) the successful
bidder shall deliver to the Employer, a Initial Security Deposit Shall be submitted as per C.E.
Circular.in the form of a Bank Guarantee/ DD/Locle MICR cheque for an amount equivalent to
5% (five percent) of the Contract Price .
Failure of the same shall make the contractor liable for any penalty as decided by AMC. At present a
policy is framed by Audit department of AMC to charge 4% interest for the balance period and
discontinuity period.
The Security Deposit to be provided by the successful bidder in the form of a bank guarantee as
per format shall be issued as per Memorendum of work.
(E) Retention :-
a). Retention @ 2% of the value of work done will be deducted from each RA bill. It will be released
along with release of payment of Final Bill.
4. Approved Bank: - As per Annexer -I
5. No advance for machinery or materials will be given.
6. Mobilization advance will not be given.
7. Quantities in B.O.Q. may vary up to any extent and contractor shall not claim any extra rate for the
8. Penalty: - 10 percent of the balance work on Date of Completion Date or extended time limit. &
As per AMC Rule
9. Tax, Duties on Materials
All charge on account of Octroi ,excise duties, terminal tax, sales tax. Service tax, VAT (exculding
GST) etc. on material procurement or any other component for the works from any source shall be
borne by the contractors.
Special Clause:
As per construction works welfare cess Act – 1996 non-refundable one percent of tender amount
shall be deducted against works welfare cess.
Seal and Signature of the Bidder Addl. City Engineer
Date: (West Zone)
General terms & conditions
1. Tenderer should be registered in PWD/ in Govt. R&B /CPWD / AMC or equivalent
registration with any other state Govt. or institutions. Copy of registration should be attached
with tender document. Tenderer who was not registred in AMC must be get registred in
panel of approved AMC contractor.
2. A booklet of FORM B-1 of Gujarat State Roads & Building Department / Water Resources
Department with the correction slips made up to 15-08-1999 may be referred. (only English
version) Clause No. -2 liquidated damages for delay shall be overrule by A.M.C.’s
M.C.circular no.- 9 dt. 18/05/2012.
3. In the specification “as directed" / "approved" shall be taken to mean "as directed /
"approved" by the Engineering in charge.
4. Wherever a reference to any Indian standard appears in the specifications, it shall be taken to
mean as reference to the latest edition of the same of force on the date of agreement.
5. In "Mode of measurement" in the specifications wherever a dispute arises in the absence of
specific mention for a particulars point / aspect, the same in the relevant Indian Standards
shall be referred to.
6. All measurement and computations, unless otherwise specified shall be carried out nearest to
the following limits :-
i) Length, width and depth, Height 0.01 Meter
ii) Areas 0.01 Sq.mts.
iii) Cubic contents 0.01 Cu. mts.
In recording dimensions of work, the sequence of length, width and height (Depth) or thickness
shall be followed.
7. Definite particulars covered in the items of work, though not mentioned or elucidate in its
specifications shall be deemed to be included therein.
8. Approval of the samples of various materials given by the Engineer in charge or AMC's
Consultant shall not absolve the contractor from the responsibility of replacing defective
materials brought on site or materials used in the work found defective at a later date. The
contractor shall have no claim to any payment or compensation whatsoever on account of
any such materials being rejected by the Engineer in charge.
9. The contractor’s rate for the item of work shall be for the work completed in all respect.
10. All materials including those of electrical shall be got approved by the Engineer in charge/
Architect before using them in the work.
11. Materials as and when rejected by the Engineer in charge or AMC's Consultant shall be
removed from the site of work within 24 hours.
12. All work shall be carried out in a manner as per standard engineering practice.
13. All tools, templates, machinery and equipment for correct execution of the work as well as
for checking lines, levels, alignment of the works & all precautionary measures during
execution shall have to be kept in sufficient numbers and in good working condition at the
site of the work. All excavated trench shall be kept covered with barricade and caution tap.
14. Special modes of the construction not adopted in general Engineering practice, if proposed
to be adopted by the contractor shall be considered only if the contractor provided
satisfactory evidence that such special mode of construction and completion of work to the
required strength and quality. Acceptance of the same by the Engineer in charge shall not
however, absolve the contractor from the responsibility of any adverse effect and
concordance of adopting the same in the course of exaction or completion of the work.
15. The contractor shall be responsible for observing the rules and regulation imposed under the
"Minor Mineral Act", and such other laws and rules prescribed by the Government from
16. All necessary safety measures and precautions (incl. those laid down in the various relevant
Indian Standard) shall be taken to engrave the safety of men, materials and machinery on the
work and also of the work itself.
17. Quantity measured in the tender is approximate. It may increase or decrease looking to the
quantum of actual work for which no any claim shall be entertained by A.M.C.
18. Contractor shall have to execute extra item if required or as per need of AMC.
19. The work in general shall be carried out as per standard specifications of the relevant items
to be executed & as per the instruction of Engineer in charge & as per the guidance of
AMC's Consultant for this project.
20. The general terms & conditions of the contract shall be applicable & shall be binding on the
contractor. The contract agreement shall have to be executed between AMC & the agency to
which work is awarded for execution.
21. For Tender amounting below 10 lakh LOI shall be issues within 3 days after received of
sanctioned tender and resolution.Within 10 days contractor has to submit SD and after
reciveing SD Work order shall be issue to contractor and the time limit shall be start from
the date of issue of the written work order to the contractor.
For Tender amounting above 10 lakh LOI shall be issues within 3 days after received of
sanctioned tender and resolution .Within 15 days contractor has to submit SD and after
reciveing SD work order shall be issue to contractor and the time limit shall be start from the
date of issue of the written work order to the contractor.
Security Deposit of 5% of sanctioned tender amount shall be deposited by pay order /
demand draft / cheque or Bank Guarntee of nationalized bank/scheduled bank only.
Contractor shall have to sign contract paper with AMC. The contractor shall be fined 4% of
interest per year for delay in submission of S.D and shall be deducted from contractor’s bill.
22. In case of any ambiguity in specifications mentioned in this tender, the interpretation given
by M.C. Or His Designeted Officer will be final and binding to the Contractor.
23. The contractor shall take no advantage of any apparent error or omission in drawing or
specification and the Engineer -in-charge shall make such corrections and interpretations as
necessary to fulfill the intent of the plants and specifications.
24. The quantities of items in BOQ (Bill of Quantities) may vary in case of necessity arises.
25. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the Municipal
Corporation. will be payable by the contractor.
26. No any kind of price rise / price escalation / price variation for cement, steel or labour shall
27. Contractor is requested to see the site physically before tendering. He is also requested to
quote the rates keeping in view of all the points mentioned in relevant pages of tender
28. Water Supply: The contractor shall arrange at his own cost, a suitable supply of piped water
for the construction of the works and provide a satisfactory supply of potable water for
drinking, washing, sanitation and cleaning down. The contractor will be responsible for all
the costs where applicable of connection, meter installation, water consumed, water required
for testing purposes, disconnection and the laying, maintenances and ultimate removal of
any distribution system around the site.
29. Electricity: Electric supply will be made available at the site by the Contractor and the
contractor must make his own arrangements with the Corporation and Electricity Supply
Authorities and with other contractors to connect and to take a supply from such services,
paying all costs in connection therewith.
The Contractor shall be entitled to use supply Electricity as may be available on the site for
purpose of the work and shall pay such charges as is fixed by the appropriate supply
In case there is any delay in supply of power site of any interruption or fault in the power
during the work. No compensation shall be paid for idle labor staff, machineries and for use
of diesel operating sets etc. as the case may be.
30. Tenders shall submit all the valid/certified documents in support of their initial/eligibility
criteria mentioned above along with the bid. They shall have also to submit the income tax
clearance certificate and solvency certificate.
31. No advance such as secured advance machinery advance, mobilization advance or materials
advance will be given.
32. The contractor shall get the electrical works executed through the authorized Government
approved licensed electrical person or firm in appropriate category in accordance to
contractual provisions.
33. The electrical works shall be carried out strictly in accordance with the directives issued by
Engineer in charge.
34. Contractors shall not have any dispute or claim for any kind of compensations
(i) If the quantity stipulated in the tender items varies or the scope of work changes & thereby
total amount of work increases/ decreases.
total amount of work increases/ decreases.
(ii) If the work gets delayed/ postponed for some administrative/ technical decision what so
35. In case of any dispute, decision of Municipal Commissioner shall be final and binding on the
36. Tenders which do not fulfill all or any of conditions or are submitted incomplete in any
respect will be rejected. Municipal Commissioner reserves the right to increase/decrease the
scope of work. No any claim to that effect shall be entertained. The Municipal
Commissioner also reserves the right to reject any or all the tenders without assigning any
reason thereof.
37. The contractors are requested to quote their rates considering above tender conditions.
38. The contractor shall have to execute the contract agreement after received work order.
Even though in special case, If work is not started because of monsoon or any other
special reason (like site is not available and due to unavoidable circumstances arise), after
evaluation of situation the actual date of starting of work will be consider after approval of
Dy.M.C. (West zone)
39. The Contractor shall not claim for increase or decrease in the quantity of the BOQ item or
the scope of work.
40. The R.A bill / final bill payment shall be made as per the latest A.M.C policy / circular for
the work done by the contractor.
41. Conditional tenders will not be accepted.
Signature of contractor with seal Additional City Engineer (W.Z)
Date Ahmadabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
ENGGNIERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 04 months after the order to start the works. Progress of work should
be in proportion to time limit. The details of reinforcement of R.C.C. work shall be as per design and
instructions of Add. City Engineer and his order will be considered final.
The contractor shall have to maintain account of steel, cement and other materials that may be brought
by him on site. This account shall be regularly maintained and kept open for inspection by Municipal
Staff. Watering of all the items shall be as per instructions otherwise no payment shall be made to
contractors. Mixing of concrete shall be done by concrete mixer machine. Arrangements of binding
vibrator for R.C.C. works if required shall have to be made by the contractor.
The contractor shall be remain responsible for Workmen’s compensation if any accident. The
contractor shall arrange for barricading at night and arrangement of Pagi at night to direct the traffic.
He shall be responsible for any damage to public. If any incident happen, during the execution of work.
In case of dispute for unseen or overlooked items the decision of the Dy. City Engineer shall be final.
The contractor shall have to give site clean of all rubbish during the work and at the time of completion
of work and hand over the site with final finishing of the work as directed. All the rejected materials
shall be removed from site within 24 hours by contractor at this risk and cost. Debris shall have to cart
daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose contractor shall have to
prepare through of bigger size and mix the mortar in the required proportion. In on case he shall be
allowed to mix the mortar either on floor or any finished surfaces. The contractor shall have to make
his own arrangement for water required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the contractor
and he shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest SOR or if item
is not available in SOR than based on current market rates. In case of extra item decision of Add. City
Engg. shall remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the propose
work the contractor shall carry out the same at his quoted rates without charges any extra and the
contractor will have to carry out the works and he will be paid at the rate quoted by him. No claim for
extra rate for subsequent changes in site and design is entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors shall have
to prepare the measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will be
fully responsible for compliance of the various provisions under contract Act. 1970 and the Rules
framed the to under.
The tender for the work shall remain open for a period (180) days from the date of opening of the
tenders for this work and that the tenderer shall not be allowed to withdraw on modify the offer on his
own during the period. If any tenderer withdraw or makes any modifications or addition in the terms
and conditions of his tender not acceptable to the Municipal Corporation the Municipal Corporation
shall without prejudice to any right or remedy be at liberty to forfeit in full the said earnest money and
black list the contractor.
If work is not started within specified time limit the penalty as per rule & tender condition delay of start
shall be recovered separately from the immediate bills payable to the contractor. Contractor has to
make his own arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully:-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be rejected.
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in form of
iv) Condition of Form - B1 Standard Specification of material & code of practice will be
applicable. Form B1 can be is available in website. Specification shall be as per ' R& B Dept. -
Govt. of Gujarat booklets of Building Works & and Road Works Specifications published by
Gujarat Book Depot, Sector-21. Gandhinagar.
CONTRACTOR'SSIGNATURE ADD.CITY ENGINEER
& STAMP (West Zone)
TECHNICAL SPECIFICATIONS
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
TECHNICAL SPECIFICATIONS OF WORK
Excavation for foundation upto 1.5 M depth including sorting out and stacking useful materials disposing
of the excavated stuff upto 50 meter lead in loose or soft soil.
Any soil which generally yields to the application of ackaxes and shoves, phawaras rakes or any such ordinary
excavating implement or organic soil, gravel silt, sand turfloam, clay, peat etc., fall under this category.
Clearing the site :
The site on which the structure is to be built shall be cleared and all obstructions, loose stone, materials and
rubbish of all kind, bush, wood and trees shall be removed as directed. The materials so obtained shall be
property of the Government and be conveyed and stacked as directed. within 50 M. lead. The roots of the trees
coming in the sides shall be cut and coated with a hot asphalt.
The rate of site clearance is deemed to be included in the rate of earth work for which no extra will be paid.
After clearing the site, the center lines will be given by the Engineer-in-charge. The contractor shall assume full
responsibility for alignment, elevation and dimension of each and all parts of the work. Contractor shall supply
laborers, materials, etc. required for setting out the reference marks and bench marks and shall maintain them as
long as required and directed.
The excavation in foundation shall be carried out in true line and level and shall have the width and depth as
shown in the drawings or as directed. The contractor shall do the necessary shoring and shutting or providing
necessary slopes to a safe angle, at his own-cost. The payment for such precautionary measures shall be paid
separately if not specified. The bottom of the excavated area shall be 1 evened both longitudinally and
transversely. as directed by removing and watering as required. No earth filling will be allowed for bringing it to
level, if mistake or any other reason excavation is made. deeper or wider that shown on the plan or directed. The
extra depth or width shall be made up with concrete of same proportion as specified for the foundation concrete
at the cost of the contractor. The excavation up to 1.5 m. depth shall be measured under this item.
Disposal of the excavated stud :
The excavated stuff of the selected type shall be used in filling the trenches and plinth or leveling the ground in
layer including ramming and watering etc.
The balance of the excavated quantity shall be removed by the contractor from the site of work to a place as
directed with lead upped 50 M. and all lift.
Mode of measurement and payment :
The measurement of excavation in trenches for foundation shall be made according to the sections of trenches
shown on the drawing or as per sections given by the Engineer-in-charge. No payment shall be made for surplus
excavation made in excess of above requirements or due to slopping and sloping back as found necessary on
account of conditions of soil , and requirements of safety.
The rate shall be for a unit of one cubic meter.
Providing and laying cement concrete1:4:8 (1-Cement: 4-coarses and:8-hand broken stone aggregates
40mm nominal size) and curing complete excluding cost of formworkin (A) Foundation and Plinth (upto
Water shall conform to M-1. Sand shall conform M-6. Cement shall conform to M-3. Stone aggregate 40 mm.
nominal size shall conform to M-12.
Before starting concrete bed of foundation treaches shall be cleared of all loose materials, leveled, watered, and
rammed as directed.
Proportion of Mix :
The proportion of cement, sand and coarse aggregate shall be one part of cement, 4 parts of sand, 8 parts of
stone aggregates and shall so measured by volume.
The concrete shall be mixed in a mechanical mixer at the site of work. Hand mixing may however be allowed for
smaller quantity of work if approved by the Engineer-in-charge. When hand mixing is permitted by the Engineer-
in-charge incase of break-down of machinery’s and in the interest of the work. it shall be carried out on a water
tight platform and care shall be taken to ensure that mixing is continued until the mass is uniform in colour and
consistency. However in such cases 10% more cement than otherwise required shall have to be used without
any extra cost. The mixing in mechanical mixer shall be done for a period 1 to 2 minutes. The quantity of water
shall be sufficient to produce a dense concrete of required workability for the purpose.
Transporting & Placing the concrete :
The concrete shall be handled from the place of mixing to the final position in not more than 15 minutes by the
method as directed and shall be placed into its final position, compacted and finished within 30 minutes of mixing
with water i.e. before the setting commences.
The concrete shall be rammed with heavy iron rammers and rapidly to get the required compaction and to allow
all the interstriees to be filled with mortar.
After the final set, the concrete shall be kept continuously wet, if required by pounding for a period of not less
than 7 days from the date of placement.
Mode of measurement and payment :
The concrete shall be measured for its length breadth and depth, limiting dimensions to those specified on plan
or as directed.
The rate shall be for a unit of one cubic meter.
Brick work using common burnt clay building bricks having crushing strength not less than
35kg./Sq.Cm.in foundation and plinth in Cement Mortar1:6 (1- Cement :6 - fine sand) (A) Conventional
(upto 10 ton) (B) Modular
Extra Rate for brickwork in Above Item for super structure above plinth level upto floor two level
Materials: Water shall conform to M-1 Cement shall conform to M-3 Sand shall conform to M-6. Brick shall
conform to M-15 Cement mortar shall conform to M-11.
The proportion of the cement mortar shall be 1:6 (1 cement : 5 fine sand) by volume.
Wetting of bricks:
The bricks required for masonry shall be thoroughly wetted with clean water for about two hours before use or as
directed. The cessation of bubbles, when the bricks are wetted with water is an indication of through wetting of
Bricks shall be laid in English bond unless directed otherwise. Half or cut bricks shall not be used except when
necessary to complete to bond; closer in such case shall be cut to required size and used near the ends of walls.
A layer of mortar shall be spread on full width for suitable length of the lower course. Each brick shall first be
properly bedded and set home by gently tapping with handle of trowel or wooden mallet. It side face shall be
flushed with mortar before the next brick is laid and pressed against it. On copletion of course, the vertical joints
shall be fully filled form the top with mortar.
The walls shall be taken up truly in plumb. All courses shall be laid truly horizontal and all vertical joint shall be
truly vertical. Vertical joints in alternate course shall generally be directly one over the other. The thickness of
brick course shall be kept uniform.
The brick shall be laid with frog upwards. A set of tools comprising of wooden straight edges, mason’s sprit level,
square half meter rub, and pins, string and plumb shall be kept on the site of work for frequent checking during
the progress of work.
Both the faces of walls of thickness greater than 23 cms shall be kept in proper place. All the connected brick
work shall be kept not more than one meter over the rest of the work. Where this is not possible, the work shall
be raked back according to bond (and not left toothed) at an angle not steeper than 45 degrees.
All fixtures, pipes, outlets of water, hold fasts of doors and windows etc. which are required to be built in wall shall
be embedded in cement mortar.
Bricks shall be so laid that all joints are quite flush with mortar. Thickness of joins shall not exceed 12 mm. The
face joints shall be raked out as directed by taking tools daily during the progress of work, when the mortar is still
green so as to provide key for plaster or pointing to done.
The face of brick shall be cleaned the very day on which the brick work is laid and all mortar dropping removed.
Green work shall be protected from rain suitably. Masonry work shall be kept moist on all the faces for a period
seven days. The top of masonry work shall be kept well wetted at the close of the day
Preparation of foundation bed:
If the foundation is to be laid directly on the excavated bed, the bed shall be leveled, cleared of all loose
materials, cleaned and wetted before starting masonry. If masonry is to be laid on concrete footing, the top of
concrete shall be cleaned and moistened. The contractor shall obtain the engineer'’ approval for the foundation
bed, before foundation masonry is started. When puccas flooring is to be provided flush with the top to plinth, the
inside plinth offset shall be kept lower than the outside plinth top by the thickness of the flooring.
Mode of measurements and payment:
The measurements of this item shall be taken for the brick masonry fully completed in foundation up to plinth.
The limiting dimensions not exceeding those shown on the plans or as directed shall be final. Battered, tapered
and curved portions shall be measured net.
No deduction shall be made from the quantity of brick work nor any extra payment made for embedding in
masonry or making holes in respect of following items:
Ends of joints, beams, posts, girders, rafters, purlins, trusses, corbel steps etc. where cross sectional area does
not exceed 500 Sq. cm.
Opening not exceeding 1000 Sq. cm.
Wall plates and bed plates, bearing of slabs, chhajas an the like whose thickness does not exceed 10 Cms. and
the bearing does not extend to the full thickness of wall.
Drainage holes, and recesses for cement concrete blocks to embed hold fasts for doors, windows etc.
Iron fixtures, pipes up to 300 mm dia hold fasts and doors and windows built into masonry and pipes etc. for
concealed wiring.
Forming chases of section not exceeding 350 Sq. Cm. in masonry.
Apertures for fire places shall not be deducted nor shall extra labour required to make splaying of jambs,
throating and making Arches over the aperture be paid for separately.
The rate shall be for a unit of one cubic meter.
Providing and laying controlled cement concrete / Ready Mix Concrete of M-200 and curing complete,
excluding the cost of form work and reinforcement for reinforced concrete work in
1.0 Materials: Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6, Grit
shall conform to M-8 Graded stone aggregate 20 mm nominal size shall conform to M-12.
2.1 The concrete mix is not required to be designed by preliminary tests. The proportion of the concrete mix
shall be 1:2:4 (1 cement :2 coarse sand : 4 graded stone aggregate 10 mm nominal size) by volume.
Concrete work shall have exposed concrete surface or as specified in the item.
2.2 The designation ordinary M-100, M-150, M-200, M-250 specified as per I.S Correspond approximately to
1:3:6, 1:2:4, 1 1/2 :3 and 1:1:2 nominal mix of ordinary concrete by volume respectively.
2.3 The ingredients required for ordinary concrete containing one beg of cement of 50 Kg. by weight (0.0342
Cu. M) for different proportions of mix shall be as under:
Grade of Total quantity of dry aggregate by Proportion of fine Quantity of water
concrete volume per 50 Kgs, of cement to aggregate to coarse per 50 Kgs. of
be taken as the sum of individual aggregate cement maximum.
volume of fine and coarse
aggregates, maximum
M-100 (1:3:6) 300 Liters Generally 1:2 for fine 34 Liters
M-150 (1:2:4) 220 ” aggregate by volume 32 “
M-200 (1:1 1/2 :3) 160 “ but subject to and 30 “
M-250 (1:1:2) 100 “ upper limit of 1:1/2 and 27 “
lower limit 1:3
2.4 The water cement ratios shall not more than those specified in the above table. The cement content of
the mix specified in the Table shall be increased if the quantity of water in a mix has to be increased to
overcome the difficulties of placement and compaction so that the water cement ratio specified in the
Table is not exceeded.
2.5 Work ability of the concrete shall be controlled by maintaining a water cement ratio that is bound to give a
concrete mix which is just sufficiently wet to be placed and compacted without difficulty with the means
2.6 the maximum size of coarse aggregate shall be as large as possible within the limits specified but in no
case greater than surround all reinforcement thoroughly and to fill the corners of the form.
2.7 For reinforced concrete work, coarse aggregates having a nominal size of 20mm are generally
considered satisfactory.
2.8 For heavily reinforced concrete members as in the case of ribs of main beams the nominal maximum
size of coarse aggregate should usually be restricted to 5 mm less than the minimum clear distance
between the main bars, or 5 mm less than the minimum cover to the reinforcement whichever is smaller.
2.9 Where the reinforcement is widely spaced as in solid slabs, limitations of size of the aggregate may not
be important and the nominal maximum size may sometimes be as greater than the minimum cover.
2.10 Admixture may used in concrete only with approval of Engineer-in-charge based upon the evidence that
with the passage of time, neither the compressive strength of concrete is reduced nor are other requisite
qualities of concrete and steel impaired by the use of such admixtures.
3.0 Workmanship:
3.1 Proportioning: Proportioning shall be done by volume, except cement which shall be measured in terms
of bags of 50 Kg. weight. The volume of one such bag being taken as 0.0342 Cu. Meter. Boxes of
suitable sizes shall be used for measuring sand aggregate. The size of the boxes (internal) shall be
cms x 25 cms. and 40 cms deep. White measuring the aggregate and sand, the box shall be filled
without shaking ramming or hammering. The proportioning of sand shall be on the basis of its dry volume
and in case of damp sand, allowances for bulkage shall be made.
3.2.1 For all work, concrete shall be mixed in a mechanical mixer which along with other accessories shall be
kept in first class working condition and so maintained throughout the construction. Measured quantity of
aggregate, sand, cement required for each batch shall be poured into the drum of the mechanical mixer
while it is continuously running. After about half a minute of dry mixing, measured quantity of water
required for each batch of concrete mix shall be added gradually and mixing continued for another one
and half a minute. Mixing shall be continued till materials are uniformly distributed and uniform color of
the entire mass is obtained and each individual particle of the coarse aggregate shows complete coating
of mortar containing its proportionate amount of cement. In no case shall the mixing be done for less than
2 minutes after all ingredients have been put into the mixer.
3.2.2 When hand mixing is permitted by the Engineer-in-charge for small jobs or for certain other reasons, it
shall be done on the smooth watertight platform large enough to allow efficient turning over the
ingredients of concrete before and after adding water. Mixing platform shall be so arranged that no
foreign material gets mixed with concrete nor does the mixing water flow out. Cement in required number
of bags shall be placed in a uniform layer on top of the measured quantity of fine and coarse aggregate,
which shall also be spread in a layer of uniform thickness on the mixing platform. Dry coarse and fine
aggregate and cement shall then be mixed thoroughly by turning over to get a mixture to uniform color.
Specified quantity of water shall then be added gradually through a rose-can and the mass turned over
till a mix of required consistency is obtained. In hand mixing quantity of cement shall be increased by
percent above that specified.
3.2.3 Mixers which have been out of use for more than 30 minutes shall be thoroughly cleaned before putting
in a new batch. Unless otherwise agreed to by the Engineer-in-charge the first batch of concrete from the
mixture shall contain only two thirds of normal quantity of coarse aggregate. Mixing plant shall be
thoroughly cleaned before changing from one type of cement to another.
3.3 Consistency :
3.3.1 The degree of consistency which shall depend upon the nature of the work and methods of vibration of
concrete, shall be determined by regular slump tests in accordance with I.S. 1199-1959. The slump of
10mm to 25mm. shall be adopted when vibrators are used and 80mm when vibrators are not used.
3.4 Inspection:
3.4.1 Contractor shall give the Engineer-in-charge due notice before placing any concrete in the forms to
permit him to inspect and accept the false work and forms as to their strength, alignment, and general
fitness but such inspection shall not relieve the contractor of his responsibility for the safety of men,
machinery, materials and for results obtained. Immediately before concreting, all forms shall be
thoroughly cleaned.
3.4.2 Centering design and its erection shall be got approved from the Engineer-in-charge. One carpenter
with helper shall invariably be kept present throughout the period of concreting. Movement of labour and
other persons shall be totally prohibited for reinforcement laid in position. for access to different parts,
suitable mobile platforms shall be provided so that steel reinforcement in position is not disturbed. For
ensuring proper cover, mortar blocks of suitable size shall be provided so that steel reinforcement in
position is not disturbed. For ensuring proper cover, mortar blocks of suitable size shall be cast and tied
to the reinforcement. Timber kapachi or metal pieces shall not be used for this purpose.
3.5 Transporting and laying:
3.5.1 The method of transporting and placing concrete shall be as approved. Concrete shall be so transported
and placed that no contemination, segregation or loss of its constituent material takes place.
All form wok shall be cleaned and made free from standing water, dust, show or ice immediately before
placing of concrete.
No concrete shall be placed in any part of the structure until the approval of the Engineer-in-charge has
3.5.2 Concreting shall proceed continuously over the area between construction joints. Fresh concrete shall
not be placed against concrete which has been in position for more than 30 minutes unless a proper
construction joint is formed. Concrete shall compacted in its final position within 30 minutes of its
discharge from the mixer. Except where otherwise agreed to by the Engineer-in-charge concrete shall be
deposited n horizontal layers to a compacted depth of not more than 0.45 meter when internal vibrators
are used and not exceeding 0.30 meter in all other cases.
3.5.3 Unless otherwise agreed to by the Engineer-in-charge, concrete shall not be dropped into place from a
height exceeding 2 meters. When trunking or chutes are used they shall be kept close and used in such
a way as to avoid segregation. When concreting has to be resumed on a surface which has hardened, it
shall be roughened, swept clean, thoroughly wetted and covered with a 13 mm thick layer of mortar
composed of cement and sand in the same ratio as in the concrete mix itself. This 13 mm layer of mortar
shall be freshly mixed and placed immediately before placing of new concrete. Where concrete has not
fully hardened, all laitance shall be removed by scrubbing the wet surface with wire or bristle brushes,
care being taken to avoid dislodgment of any particles of coarse aggregate. The surface shall then be
thoroughly wetted, all free water removed and then coated with neat cement grout. The first layer of
concrete to be placed on this surface shall not exceed 150 mm in thickness and shall be well rammed
against old work particular attention being given to corners and close spots.
3.5.4 All concrete shall be compacted to produce a dense homogeneous mass with the assistance of vibrators,
unless, otherwise permitted by the Engineer-in-charge for exceptional cases, such as concreting under
water, where vibrators cannot be used. Sufficient vibrators in serviceable condition shall be kept at site
so that spare equipment is always available in the event of breakdowns.
Concrete shall be judged to be compacted when the mortar fills the spaces between the coarse
aggregate and begins to cream up to form an even surface. Compaction shall be completed before the
initial setting starts i.e. within 30 minutes of addition of water to dry mixture. During compaction, it shall
be observed that needle vibrators are not applied on reinforcement which is likely to destroy the bond
between concrete and reinforcement.
3.6 Curing: Immediately after compaction, concrete shall be protected from weather including rain, running
water, shocks, vibration, traffic, rapid temperature changes, frost and drying out process. It shall be
covered with wet sacking, hassain or other similar absorbant material approved, soon after the initial set
and shall be kept continuously wet for a period of not less than 14 days from the date of placement.
Masonary work over foundation concrete may be started after 48 hours of its laying but curing of
concrete shall be continued for a minimum period of 14 days.
3.7 Sampling and Testing of concrete:
3.7.1 Samples from fresh concrete shall be taken as per I.S. 1199-1959 and cubes shall be made, cured and
tested at 7 days or 28 days as per requirements in accordance with I.S. 516-1959. A random sampling
procedure shall be adopted to ensure that each concrete batch shall have a reasonable chance of being
tested i.e. the sampling should be spread over the entire period of concreting and cover all mixing units.
The minimum frequency of sampling of concrete of each grade shall be in accordance with following:
Quantity of concrete No. of Quantity of concrete in No. of samples
in the work samples the works
51 and above 4+ one additional for each additional 50 M. or part thereof.
NOTE : At least one sample shall be taken from each shift. Ten test specimens shall be made from each
sample, five for testing at 7 days and the remaining five at 28 days. The samples of concrete shall be
taken on each day of the concreting as per above frequency. The number of specimens may be suitably
increased as deemed necessary by the Engineer-in-charge when procedure of tests given above reveals
a poor quality of concrete and in other special cases.
3.7.2 The average strength of the group of cubes cast for each day shall not be less than the specified cube
strength of 150 Kg/Cm at 28 days. 20% of the cubes cast for each day may have value less than the
specified strength provided the lowest value is not less than 85% of the specified strength. If the
concrete made in accordance with the proportions given for a particular grade, does not yield the
specified strength; such concrete shall be classified as belonging to the appropriate lower grade.
Concrete made in accordance with the proportions given for a particular grade shall not, however, be
placed in a higher grade on the ground that the test strength are higher than the minimum specified.
3.8.1 The Engineer-in-charge shall be informed in advance by the contractor of his intention to strike the form
work. While fixing the time for removal of form work, due consideration shall be given to local conditions,
character for the structure, the weather and other condition that influence the setting of concrete and of
the materials used in the mix. In normal circumstances (generally where temperatures are above 20 C)
and where ordinary concrete is used, forms may be struck after expiry of periods specified in item No
9.1(A) for respective item of form work.
3.8.2 All form work shall be removed without causing any shock or vibration as would damage the concrete.
Before the soffit and struts are removed, the concrete surface shall be exposed, where necessary in
order to ascertain that the concrete has sufficiently hardened. Centering shall be gradually and uniformly
lowered in such manner as to permit the concrete to take stresses due to its own weight uniformly and
gradually. Where internal metal ties are permitted, the or their removable parts shall be extracted without
causing any damage to the concrete and remaining holes filled with mortar. No permanently embedded
metal part shall have less than 25 mm cover to the finished concrete surface. Where it is intended to re-
use the form work, it shall be cleaned and made good to the satisfaction of the Engineer-in-charge. After
removal of form work and shuttering, the Executive Engineer shall inspect the work and satisfy by
random checks that concrete produced is of good quality.
3.8.3 Immediately after the removal of forms, all exposed bolts etc., passing through the cement concrete
member and used for shuttering or any other purpose shall be cut inside the cement concrete member to
a depth of at least 25 mm below the surface of the concrete and the resulting holes be filled by cement
mortar. All fine caused by form joints, all cavities produced by the removal of form ties and all other holes
and depressions honeycomb spots, broken edges or corners and other defects shall be thoroughly
cleaned, saturated with water and carefully pointed and rendered true with mortar of cement and fine
aggregate mixed in the proportions used in the grade of concrete that is being finished and of as dry
consistency as is possible to use. Considerable pressure shall be applied in filling and pointing to ensure
thorough filling in all voids. Surfaces which are pointed shall be kept most for a period of 25 hours.
If rock pockets/honeycombs in the opinion of the Engineer-in-charge are of such an extent or character
as to effect the strength of the structure materially or to endanger the life of the steel reinforcement, he
may declare the concrete defective and require the removal and replacement of the portion of the
structure affected.
4.0 Mode of measurement and payment:
4.1 The consolidated cubical contents of concrete work as specified in item shall be measured. The concrete
laid in excess of section shown on drawings or as directed shall not be measured. No deduction shall be
(a) Ends of dis-similar materials such as joints, beams, posts, girders, rafters, purline trusses, corbels and
steps etc. up to 500 Sq. Cm. in section.
(b) Opening up to 0.1 Sq. M.
4.2 The rate includes cost of all materials, labour, tools and plant required for mixing, placing in position,
vibrating and compacting, finishing, as directed, curing and all other incidental expenses for producing
concrete of specified strength. The rate excludes the cost of form work.
4.3 The rate shall be for a unit of one cubic meter.
5.4.1 Providing and laying cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate
mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced
concrete work in :
(A) Foundation footing, base of columns and mass (B) Slabs, landings, shelves, balconies, internals beams
girders and cantilever up to floor two level (C) Columns, pillars, posts and struts up to floor two level (D)
Staircase up to floor two level (E) Vertical and horizontal fins up to floor two level.
1.0 Materials & Workmanship
1.1 The relevant specification of item No. 5.3.13 shall be followed except that the work shall be carried out
for reinforced concrete work for work as specified in item 1.2. In addition, the following stipulations shall
be followed for :
(a) The bars shall be kept in position by the following methods:
(i) In case of beam and slab construction, sufficient number of precast cover blocks in cement mortar 1:2 (1
cement : 2 coarse sand) about 4 cms x 4 cms section and of thickness equal to the specified cover shall
be placed between the bars and shuttering as to secure and maintain the requisite cover of concrete over
the reinforcement.
In case of cantilevered or doubly reinforce beams of slabs, the main reinforcing bars shall be held in
position by introducing chain spacers or supports bars at 1.0 to 1.2 meters centers.
(ii) In case of columns walls, the vertical bars shall be kept in position by means of timber temphtes with
slotes accurately out in them. The temphtes shall be removed after concreting has been done below it.
The bars may also be suitably tied by means of annealed steel wires to the shuttering to maintain their
position during concreting.
1.2 All bars projecting from pillars, columns beams, slabs etc., to which other bars and concrete are to be
attached or bounced to later on, shall be protected with a coat of thin neat cement grout, if the bars are
not likely to be incorporated with succeeding mass of concrete within the following 10 days. This coat of
thin neat cement shall be removed before concreting.
2.0 Mode of measurement and payment:
2.1 Relevant specifications of item No. 5.3.13 shall be followed.
2.2 The volume occupied by reinforcement shall not be deducted from R.C.C. work.
2.3 The rate shall be for a unit of one cubic meter.
Providing form work of ordinary timber planking so as to give a rough finish including centering
shuttering, strutting and propping etc. height of propping and centering below supporting floor to celling
not exceeding 4 m. and removal of the same for in site reinforced concrete or plain concrete work upto
floor four level ( a to h)
The shuttering to be provided shall be of ordinary timber planks and shall conform to M-26.
The dimensions of scantlings and battens shall conform to the design. The strength of the wood shall not be less
than that assumed in the design.
The form work shall conform to the shape lines and dimension as shown on the plans and be so constructed as
to remain sufficiently rigid during the placing and compacting of the concrete. Adequate arrangements shall be
made by the contractor to safe guard against any settlement of the form work during the course of concreting and
after concreting. The form work of shuttering, centering, scaffolding bracing etc shall be as per design.
Cleaning & Treatment of forms:
All rubbish, particularly chippings shaving and saw dust shall be removed from the interior of the form before the
concrete is placed and the form work in contact with concrete shall be cleaned and thoroughly wetted or treated.
The surface shall be then coated with soap solution applied before concreting is done. Soap solution for the
purpose shall be prepared by dissolving yellow soap in water to get consistency of paint. Alternatively a coat of
raw linseed oil or form oil of approved manufacture may be applied in case steel shuttering is used. Soap solution
or raw linseed oil shall be applied after thoroughly cleaning the surface. Care shall be taken that the coating does
not get on construction joint surface and reinforcement bars.
Stripping time:
In normal circumstances and where ordinary cement is used forms may be struck after expiry of following
Sides of walls columns and vertical faces of beam 24 to 48 hours.
Beams soffits (Props left under) 7 days.
Removal of props slabs
(i) Slabs spanning up to 4.5 m – 7 days (ii) Spanning over 4.5 mm 14 days
Removal of props to beams and arches
(i) Spanning up to 6 m – 14 days (ii) Spanning over 6 m 21 days
Procedure when removing the form work:
All form work shall be removed without such shock or vibration as would damage the reinforced concrete surface.
Before the soffits form work and struts are removed, the soffits and the concrete surface shall be exposed where
necessary in order to ascertain that the concrete has sufficiently hardened.
The centering to be provided shall be got approved. It shall be sufficiently strong to ensure absolute safely of the
form work and concrete work before, during and after pouring concrete. Watch should be kept to see that
behavior of centering and form work is satisfactory during concreting. Erection should also be such that it would
allow removal of forms in proper sequence without damaging either the concrete or the forms to be removed.
The props of centering shall be provided on firm foundation or base of sufficient strength to carry the loads
without any settlement.
The centering and form work shall be inspected and approved by the Engineer-in-charge before concreting. But
this will not relieve the contractor of his responsibility for strength, adequacy and safety of form work and
centering. If there is a failure of form work or centering, contractor shall be responsible for the damages to the
work, injury to life and damage to property.
All scaffolding, hoisting arrangements and ladders etc required for the facilitating of concreting shall be provided
and removed on completion work by contractor at his own expense. The scaffolding, hoisting arrangements and
ladders etc. shall be strong enough to with stand all live, dead and impact loads expected to act and shall be
subject to the approval of the Engineer-in-charge. However, contractor shall be solely responsible for the safety
of the scaffolding, hoisting arrangement, ladders, work and workman etc.
The scaffolding hoisting arrangements and ladders shall allow easy approach to the work spot and afford easy
The rate is applicable to all conditions of working and height up to 4 mts. The rate shall include the cost of
materials and labour for various operations involved such as:
Splayed edges, notching, allowance for overlaps and passing at angles, battens centering, shuttering propping,
bolting, nailing, wedging, easing, striking and removal.
Filleting to form stop chamfered edges or splayed external angles not exceeding 20 mm width to beams, columns
Temporary openings in the forms for pouring concrete, if required, removing rubbish etc.
Dressing with oil to prevent adhesion of concrete with shuttering, and
Raking or circular cutting.
Rate shall be paid in Sq.m
Providing thermo Mechanically treated bars (TMT BARS) confirming IS 1786/Fe 415 for R.C.C. wroks
including cutting , bending, binding and placing in position complete upto floor two level.
The scope of work consists of providing and laying mild steel reinforcement and TMT CRS Fe-500
reinforcement for RCC works of various components of the structure. This may be Tisco or any other approved
manufacturer branch and corrosion resistant steel bars approved by the Engineer Incharge. This includes
cuttings, bending, binding, placing, with all equipments and labour required for the work as directed by the City
Engineer, Ahmedabad and all operations covered within the intent and purpose of the specification.
Being of Reinforcement
Reinforcing steel shall conform accurately to the dimensions shown on relevant drawings and conforming
to the relevant IS codes (latest revision).
Bars shall be bent cold to the specified shape and dimensions or as directed by the City Engineer, AMC,
Ahmedabad using a proper bar bender, operated by hand or power to attain proper radii of bends.
Bars shall not be bent or straightened in a manner that will cause injury to the material.
Bars bent during transport or handling shall be straightened before being used on work; they shall not be
heated to facilitate bending.
The bending of the TMT bars shall be carried out as per the following:
S.No Operation Size TMT CRS-Fe-500
1 Bend Upto 22 mm dia 3d
Over 22 mm dia 4d
2 Rebend Upto 10mm dia 4d
Over 10 mm dia 5d
Placing of Reinforcement:
All reinforcing bars shall be accurately placed in the exact position shown on the drawings, and shall be
securely held in position during placing of concrete by annealed binding wire not less than 1 mm in size and
conforming to IS:280 and by using stays blocks or metal chairs, spacer, metal hangers, supporting wires or other
approved devices at sufficiently close intervals. Bars will not be allowed to sag between supports nor displaced
during concreting or any other operation over the work. All devices used for positioning shall be of non-corrodible
material. Wooden and metal supports will not extend to the surface of concrete, except where shown on the
drawings, placing bars on layers of freshly laid concrete as the work progresses for adjusting bar spacing will not
be allowed. Pieces of broken stone, brick or wooden blocks shall not be used. Layers of bars shall be separated
by spacer bars, precast mortar blocks or other approved devices.
Reinforcement after being placed in position shall be maintained in a clean condition until completely
embedded in concrete. Special care shall be exercised to prevent any displacement of reinforcement in concrete
already placed.
To protect reinforcement from corrosion, concrete cover shall be provided as indicated on the drawings.
All bars protruding from concrete to which other bars are to be spliced and which are likely to be exposed for an
indefinite period shall be protected by a thick coat of neat cement grout.
In the case of columns and walls, vertical bars shall be kept in normal position with timber templates
having slots accurately cut in for bar position. Such templates shall be removed after the concreting has
progressed upto a level just below them.
Bars crossing each other, where required, shall be secured by binding wire (annealed) of size not less
than 1 mm and conforming to IS;280 in such a manner that they do not slip over each other at the time of fixing
and concreting. As far as possible, bars of full length shall be used. In case this is not possible, overlapping of
bars shall be done as directed by the City Engineer, AMC, Ahmedabad. When practicable, overlapping bars shall
not touch each other, but be kept apart by 25 mm or 1 ¼ times the maximum size of the coarse aggregates
whichever is greater, by concrete between them. Where this is not feasible, overlapping bars shall be bound with
annealed steel wire, not less than [1 mm thickness twisted tight in eight shape around the lapped bars. The
overlaps shall be staggered for different bars and located at fixed locations only along the span where neither
shear nor being moment is maximum.
Welding of Bars
Welding of TMT bars can be permitted if specified on the drawings, joints of reinforcement bars shall be
butt welded so as to transit their full strength. Welded joints shall preferably be located at points where steel will
not be subject to more than 75 percent of the maximum permissible stresses and welds so staggered that at any
one section, not more than 33 per cent of the rods are welded. No –pre-warning or post heat treatment is
necessary. Interpass temperature should be limited to 200º C with low heat input and equivalent strength low
hydrogen type electrode. Suitable means shall be provided for holding the bars securely in position during
welding. It must be ensured that no voids are left in welding and when welding is done in 2 or 3 stages, previous
surface shall be cleaned property. Ends of the bars shall be cleaned of all loose scale, rust, grease, paint and
other foreign matter before welding. Only competent welders shall be employed on the work.
Welded pieces of reinforcement shall be tested. Specimens shall be taken from the actual site and their
number and frequency of tests shall be as directed by the City Engineer, AMC, Ahmedabad.
The TMT bars shall be tested for any or all of the following tests as directed by the Engineer Incharge
Alternate immersion test
Salt spray test
Atmospheric exposure test
Sulphur dioxide test
Potentio dynamic test
Filling available excavated earth in trenches, plinth, sides of foundation etc. incl. watering and ramming :
The earth obtained from excavation shall be filled in layers not exceeding 20 cms. in depth and water thoroughly
after each layer and shall be properly consolidated with rammers so that no hollow voids remain there. In
general the work shall be carried out in the best manner so that no hollow voids remain after work. Workmanship
in general confirm to C –2.
Mode of Measurement shall be on cubic meter basis.
Filling in plinth with sand under floors including watering ramming, consolidating and dressing etc.
Filling in plinth with sand under floors including watering ramming, consolidating and dressing etc. complete.
Mode of Measurement shall be on cubic meter basis.
Providing & Laying 18 mm thick Mirror polish granite flooring for counter , stair -riser , tread , skirting
dedo etc. machine cut or chiselled on bed of cement mortar 1:1 pointing with neat cement slurry incl.
moulding etc. comp. as per instruction of engineer in charge.
Providing & Laying 18 mm thick Mirror polish granite flooring for counter , stair -riser , tread , skirting , dedo etc.
machine cut or chiselled on bed of cement mortar 1:1 pointing with neat cement slurry incl. moulding etc. comp.
as per instruction of engineer in charge.
Mode measurements & payment :
flooring with various kinds of floors shall measured in sq. metre. The length and breadth shall be measured
between the finished face of skirting or dado or wall plaster. No deduction shall be made not extra shall be paid
for any openings in the floor or area upto 0.05 sq. mt. Nothing extra shall be paid for laying stone at different
levels in the same room. Treads and steps of stairs paved with granite stone slabs shall also be measured under
The rate shall be for a unit of one sq. metre
P/F grouting with epoxy branded material filling with groove cutting of 2 to 3 mm in tiles flooring and
cladding work etc. comp. by as per engineer incharg.
The rate shall be for a unit of one sq. metre
Providing and fixing M.S. grills of required pattern to wooden frames of windows etc. with M.S. flats at
required spacings and frame alround, square or round bars with round headed bolts and nuts or by
screws (A) Plain Grill. (upto 10 ton)
Materials: Red lead paint primer shall conform to I. S. : 102-1962.
The steel sections as specified or required shall be cut, square and to correct lengths, as per drawings and
design. The cut ends exposed to view shall be finished smooth. No. two pieces shall be welded or other wise
jointed to make up the required length of member, except as indicated in the drawings or as directed. All
straightening and shaping to form shall be done by application of pressure and not by hammering. Any bending
or cutting shall be carried out in such a meaner as not to impair the strength of the metal. All operations shall be
done in cold state unless otherwise directed/permitted.Steel riveted or bolted in built up sections, frame work.
The steel structure as shown in the drawings or as per direction of the Engineerin-charge shall be laid out one
level platform to full scale and to full size or in parts. A steel tape shall be used for measurements to ensure
maximum accuracy.
Wooden templates 12 mm to 19 mm thick or metal sheet template shall be made to correspond to each
connecting gussets plate and rivet holes shall be accurately marked on them and drilled.he template shall be laid
on the steel members, and holes of the steel members shall also be marked for cutting. The base of steel
columns and the position of Anchor bolts shall be carefully set out.
All stiffeners shall be formed by pressure and where practicable, the metal shall not be cut and welded in making
these. In major works or where so specified shop drawings giving complete details and information for the
fabrication of the component parts of the structure, including location type size, length and details of rivets, bolts,
or weld shall be prepared in advance of the actual fabrication and as approved. The drawings shall indicate the
shop and field rivets and bolts. The steel member shall be distinctly marked or stenciled with paint with the
identification mark as given in the shop drawings. The bars shall be thickened at the ends, so as to provide for
screwed threads and gradually tapered off to meet their normal section. Great accuracy shall be observed in
fabrication of various member, so that these can be assembled without being unduly packed, strained or forced
into position and when built up, shall be true and free form twist, bniks, buckles, or open joints. Before making
holes individual members for fabrication, the steel work intended to be riveted or bolted together shall be
assembled or clamped properly and tightly so as to ensure close abutting or lapping of the different members. All
stiffeners shall bear tightly both at top and bottom without being drawn or caulked. The abutting joints shall be cut
or dressed true and straight and fitted close together. Web splice plates and filters under stiffeners shall be cut to
fit within 3 mm or flange angles, web plates of girders shall have not cover plates, shall have their ends flush with
the top of angles forming the flanges unless otherwise required. The web plates when spiced shall have
clearance of more than 6 mm. The erection, clearance for cleared ends of members connecting steel to steel
shall preferably be not greater than 1.5 mm. The erection clearance at the ends of beams without web cleats
shall to be more that 3 mm at each end but where for a practical reason greater clearance is necessary, suitably
designed seating shall be provided. Pins and rollers shall be accurately turned to gauge. These shall be straight
and smooth and free from flows. The roller bearing shall be provided with adequate arrangement for holding the
girders or truss resting on it. In columns caps and bases, the ends of shafts together with the attached gussets
angles, channels etc., after riveting together shall be accurately mechanized so that the parts connected butt
against each other over the entire surfaces of contract connecting angles or channels shall be fabricated and
placed in position with greater accuracy so that they are not unduly reduced in thickness by machining. The ends
of bearing stiffeners shall be machanised or ground to fit tightly both at the top and bottom. All holes shall
generally be drilled to the required size and at the required size and at required position. Sub punching shall be
permitted, provided it is done 3 mm or less in diameter and remade thereafter to the required size. The holes for
rivets and bolts shall be larger by 0.4 to 6 mm than the nominal diameter of rivets or black bolts depending up on
the diameter of rivets.Holes shall have their axis perpendicular to the surface bored through. The drilling or
reamering shall be free form butts, and the holes should be clean and accurate. Holes for counter shunk bolts
shall be made in such a manner that their heads fit flush with the surface after fixing. The fabrication work shall
be completed in workshop as far as it is practicable to do so. Site joints shall be done with rivets and fitted bolts
or black bolts, as shown in the drawings or as directed.
Generally the following principles shall govern the use of rivets turned and fitted bolts, and black bolts.
(i) Rivets and turned and fitted bolts shall be used where the connection is such that slip
under load has to be avoided.
(ii) Black bolts may be used very sparingly where a force is carried through a connection without impact, vibration
or reversal of stresses.
Riveting: The parts assembled for riveting shall be in close contact with each other and the bearing stiffeners
shall bear tightly both at top and bottom without being drawn or caulked.Members to be riveted shall be properly
pinned or bolted and rigidly held together while riveting.Drifting of holes shall not be permitted except to draw the
parts together and the drifting tools so used shall have maximum diameter not exceeding the nominal diameter of
rivets or bolts. Drifting done during assembling shall not distort the metal or enlarge the holes.The shanks of
rivets shall project beyond the plate surface sufficiently so as to fill the hole thoroughly and from the required
head after riveting.
The riveting shall be done by hydraulic or pneumatic process. However where such facilities are not available,
hand riveting may be permitted. The rivet shall be heated red -hot, care being taken
to control the temperature of heating so as not to burn the steel. Riveting of diameter less than
mm may be fitted cold. Rivets shall be of heat finish with heads full and of equal size. All loose, burnt or badly
formed rivets with concentric or deficient heads shall be cut out and replaced. The heads of rivets shall be central
to shanks and shall grip the assembled members firmly. In cutting out rivets, care shall be taken so as not be
injure the assembled, members, caulking or recouping
shall not be permitted.For testing rivets, hammer weighing approximately 0.25 kg. shall be used of the rivets shall
be tapped, slack rivets will give a hollow sound and a jar. All rivet heads shall be painted with red lead paint
within a week of their fixing. Bolting all bolt heads and nuts shall be hexagonal and of equal size unless specified
otherwise. The screwed heads shall conform to I.S. : 1363:1960 and the threaded surface shall not be tapered.
The bolts shall be of such length so as to project two clear threads the nuts, when fixed in position and these
shall fit in the holes without any shakes. The nut shall be fit in the threaded ends of bolts properly. Where turned
and fitted bolts are required to be used in place of rivets they shall be provided with washers not less that 6 mm
thick so that the nut when tightened shall not bear on the unthreaded body of the bolt. Tapered washers shall be
provided for all heads and nuts bearing on leveled surfaces. The threaded portion of the bolts shall not be within
the thickness of the parts bolted together. The faces of the bolt and nuts abutting against steel members shall be
machine finished. Where there is a risk of the nut being removed or becoming loose due to vibrations or reversal
of stresses, these shall be secured from slackening by the use of locknuts, spring washers,cross cutting or
hammering down of threads as directed.Bolts, nuts and washers shall be thoroughly cleaned and dipped in
double boiled linseed oil before use. The whole steelwork shall be painted with a coat of priming coat of red lead,
as per relevant specifications of painting.
Mode of measurement and payment:
The steelwork shall be measured in general as under.
(a) All work shall be measured on the basis of finished dimensions as fixed at site and
measured net unless specified otherwise.
(b) The weight of steel sections, steel strips in finished work shall be calculated from standard weight on the
same basis on which steel is supplied to the contractor by department or those given in relevant I. S. if steel is
arranged by the contractor.
(c) The weight of steel plates and strips shall be taken from relevant I. S. based on 7.85 kg/sq. meter for every
millimeter sheet thickness if steel is supplied by the contractor, otherwise the eight shall be calculated on the
basis on which steel is supplied to the contractor by department.
(d) Unless otherwise specified weight of clearest, brackets, packing pieces, bolts, nuts, washers, distance pieces,
separators, diaphragm gusset (taking over all square dimensions) fish plates etc. shall be added to the weight of
respective items.
(e) In riveted work allowance to be made of weight of rivet hands. No deductions shall be made for rivet or bolt
holes excluding holes for anchor or holding down bolts.
(f) For forged steel and steel casting weight shall be calculated on the basis of 850 kg/cum.
(g) Unless otherwise specified an additional of 2.5 percent of the weight of structure shall be made for shop and
site rivet heads in riveted steel structure.
(h) Unless otherwise specified no allowance shall be made for the weld metal in case of welded steel structure.
(i) Dimensions other than cross sections and thickness of plates shall be measured to nearest 0.001 m
(j) Mill tolerance shall be ignored when weight is determined by calculation.
The rate includes cost of all material, labour, erection, hoisting, scaffolding protective measure, required
for proper completion of the item of work. This shall also included conveyance and delivery handling, loading,
unloading and storing etc. required for completing the item described above including necessary wastage
involved.The rate shall be for a unit of one kg.
Providing 0.60mm thick Powder coated Naliya Pattern G.I. Sheet roofing, and Fixing sheet in 45 degree shape
and Trepezoidal portion pattern & Fixed with Leak proof Stud Bolts and washers. including cost of side Ridge on
Joint Portion of sheets. All Framming work done on site with Cutter, generater etc. comp. as directed by
The rate shall be for a unit of one sq. metre
Providing & Fixing MS Decorative Boarder patta in Gazebo Purlins rate includes Cutting, welding & Fixing etc.
comp. as directed by engg.incharge
The rate shall be for a unit of one Running metre
Providing & Fixing Decorative colour full light in Gazebo rate includes Wiring, Switch board, Switches, MCB
Piping etc. comp. as directed by engg.incharge
The rate shall be for a unit of one Job
Providing and fixing Ornamental design decorative CI garden benches incl. painting with synthetic enamal paint
and fixing FRP 4'5''x3" streep betten on sitting portion LN KEY SS fasteeners for FRP streep fitting MS rod
feet length etc.comp. incl. SS name plate of councillour etc. comp. as directed by engg. in charge
The rate shall be for a unit of one Nos
Councilor/MLA Name Granite Engraving Takti, Size: 2' x 1'
The rate shall be for a unit of one Job
Providing & Fixing Stainless steel 304 grade 50mm outer dia meter 14 guage Railing with 2 nos horizontal &
mt. clear vertical pipe 1 mt. c/c with buffing SS pipe. including cutting, bending fixing in position and Fixing SS
Article cap in bottom of pipe. Rate also includes Fixing pipe in bottom with flling material of bombay masala etc.
Complete as per the instruction of engg. in charge
The rate shall be for a unit of one Running metre
Providing and supplying of labour for necessary excavation, cleaning, Shifting of Material Or any other, or for any
other work as directed by Engineer In charge.
Providing and Laying of Rubber Moulded Paver Block Grey/Coloured 60 mm thick, M-35 Grade of any
size shape (Usually Uni-Paver Blocks) using black trap good quality aggragate of 20 mm nominal size for
footpath, parking areas, service lanes and other areas as mentioned in the drawing / instruction of
engineer in charge. Cost includes formworks using rubber mould, Rate providing and laying paver
blocks as per required grading and specification. The paver block shall be mechanically compacted. The
work of paving blocks shall be executed in line and level by skill mason of flooring work only. It should
be laid in such a way that the no cutting of the paver block to be necessary. if cutting of paver block
necessary then it should be cut by machine only and carting. The finished surface of the paver block
shall have resonably good, plain finished. Paver blocks shall be compacted and shall be relaid if
necessary. Gravel or such type of materials shall not be allowed for production. Laying on 5 cms thick
sand bedding(As per ARC)
Paver Block Manufacturing Facilities :
The Paver Block shall be made in factory with following minimum facilities :
1.1 Concrete Block making Machines :
The machine should be capable of producing high quality Paver Blocks by obtaining high level of
compaction by application of hydraulic compaction and also by high intensity vibration to the moulds. The
machine should have automatic control panel for uniformity in strength.
1.2 Concrete Batching & Mixing Plant : (Not essential)
The concrete Mix Design should be followed for each batch of materials. The concrete ingredient should
be mixed in concrete Batching & Mixing plant with minimum capacity of 30 cum/hour. The plant should equipped
with automatic control panel for maintaining water cement ratio from batch to batch to obtain concrete of uniform
quality and strength. The plant should be equipped with adequate mechanism for mechanized loading of raw
materials into mixer and conveyor belt for transportation of concrete from mixer to concrete block making
machine to maintain quality of wet cement.
1.3. Curing:- The factory should have well designed curing area to ensure adequate curing of paver blocks.
Laboratory (Desirable but not essential) :
The factory should have the following:
Compression testing machine of adequate capacity.
Other tools and equipment for testing raw materials and paver blocks.
(1).Systematic record of test results of various paver blocks manufactured in the factory.
(2).Concrete Mix Design for various grade of concrete used for making of paver blocks.
II) SPECIFICATIONS FOR COLOURED PAVER BLOCKS :
Coloured concrete paver blocks shall be manufactured as per attached specifications using approved colour
Pigment of “BAYER” Make “BAYFERROX IRONOXIDE PIGMENTS” with minimum colour pigment of 3% by
weight of cement. The colour shade shall be “RED” as selected by HPCL before commencement of the work.
White cement shall be used for colored pavers to obtain the desired colour shade. The job also includes
providing 50 mm thick sand bedding to match the shade of the paver block.
The colour of the paver block shall be guaranteed against fading of colour for period of 12 months from the date
of laying of the same at site.
All other technical specifications & Procedure for testing, laying & sampling of coloured pavers will be as per
III) PAVERS BLOCK CHARACTERISTICS :
The concrete pavers should have perpendicularities after release from the mould and the same should be
retained until the laying.
The surface should be reasonably smoothe and of anti skid and anti glare type.
The paver should have uniform chamfers to facilitate easy drainage surface run off.
The pavers should have uniform interlocking space of 2mm to 3mm to ensure compacted sand filling after
vibration on the paver Surface.
The concrete mix design should be followed for each batch of materials separately and automatic batching plant
is to be used to achieve uniformity in strength and quality.
The pavers shall be manufactured in single layer only.
Skilled labour should be employed for laying blocks to ensure line and level of laying, desired shape of the
surface and adequate compaction of the sand in the joints.
The pavers shall be of cement gray colour without any pigment & for coloured pavers refer “specifications for
coloured pavers.”
The pavers are to be skirted all round with kerbing using solid concrete blocks of size 150mm X 250mm X
380mm. The kerbing should be embedded for 100mm depth. The concrete used for kerbing shall be cured
properly for 7 days minimum.
IV) Paver Block Dimensions :
Thickness 60mm or 80mm
Shape Uniregular (Uniform Shape with no
Hollow Or Creacks)
Chamfer 4mm to 6mm along top edges
Colour Natural cement grey colour without use
of any pigment.
For coloured pavers refer
“specifications for coloured pavers”
Dimensional Tolerance (+/-) 2mm for length & width,
(+/-) 3mm for Height (Thickness)
V) Testing of Paver Blocks :
SR. Average Values
NO. (Average of Minimum
Five Samples/Site)
1. Compressive Strength Min. 45 N/Sqmm for 80mm
thick OR Min. 30 N/Sqmm
2. Flexural Strength Minimum 4.5 N/Sqmm
3. Abrasion Resistance Maximum
4. Water Absorption Maximum 5.80%
380 Kg/Cum (Not
5. Minimum Cement Contact
* Sampling and Testing procedure as per enclosed specifications
SAMPLING AND TESTING PROCEDURES FOR PAVER BLOCKS.
INTERNAL – Average of minimum 3 samples per 5000 Blocks.
Essential – Minimum 2 Blocks per 10000 bocks. Average of minimum 8 blocks per site.
1. Sampling For Testing
Sampling for testing of paver blocks shall be done in accordance with Appendix-A.
Compressive Strength
Testing for compressive strength shall be undertaken in accordance with Appendix-B.
The average compressive strength of the bocks tested shall be 40 N/Sqmm.
Abrasion Resistance
Testing for abrasion shall be in accordance with IS 1237 (Specifications for Cement Concrete Floor Tiles) –
Flexural Strength
Testing for flexural shall be n accordance with IS 1237 (Specifications for Cement Concrete Floor Tiles) –
Water Absorption
Testing for water absorption shall be in accordance with IS 2185:1979 : Part I (Specifications for Concrete
Masonry Units) – Appendix E.
Supplying and fixing of 300 mm-L x 150 mm-B x 380 mm-H Kerb block for Footpath in M-20 grade using
Trenches of specified width and depth shall first be made along the edges of the wearing course of the road or
along the line of pave block flooring to receive the restraint blocks. The bed of the trenches shall be compacted
manually with steel rammers to a firm and even surface and then stones shall be set in P.C.C.
The edge restraint blocks shall be laid with their length running parallet to the paving edge, true in line
and gradient. The joints of blocks shall be not more than 10 mm and filled with the CM 1:3 ( 1 cement : 3 fine
sand ) which shall be cured for 7 days.
Finishing The edges shall be restored and all surplus earth including rubbish etc. disposed off as directed by
the Engineer-in Charge.
Measurements Length of the finished work shall be measured in running metre along the edge of the paving
correct to a cm.
Rate The rate shall include the cost of the materials and labour including stone of specified material involved in
all the operation described above. The rate shall be for a unit of one meter basis.
Conveyance charges of earth lime, murrum, building rubbish, manure, garbage, sludge, excavated rock,
fly ash, aggregate of any kind etc. comp. upto 5 km lead.
All the surplus earth etc. shall be carried away immediately from the site of work to a place within 5km.
distance or as directed and ordered by the Engineer, so as not to cause any inconvenience to the public traffic
finding which in view of public safety and traffic convenience. The corporation shall carry out the work by any
other agency at the contractor’s risk and cost. If the instructions are not completed within 7 days from the date of
order to cart the surplus materials and clear the site, the said work shall be carried out by the Municipal
Corporation at the risk and cost of the contractor and no claim or dispute shall be entertained in this respect.
If the filling in trenches after settlement of the earth filling in trenches is to be done and the same shall be
carried out by the contractor without asking any extra rate. The contractor shall have to cart the surplus earth
after the trenches we will watered and refilled with the sand. The rate of carting including carting of brickbats,
metal, rubble vegetable and garbage, if necessary to clear the road surface.
The rate shall be for a unit of cubic meter.
Contractor signature/Stamp Additional City Engineer
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
bntldh muJtmœl –vrùbÍtul
vrùb Ítul Ítulj ytuVem,
1. Wvhtuf< xuLzhtu su <u Jdobtk btLg hSMx[uNl ^htJ<t ftuLx[tfxh©eytuyu ChJt.
2. xuLzhle rlg< xuLzh Ve <&t R.yub.ze. ck^ fJhbtkk Wvh lt mhltbu ÁcÁ / hSMxh yu.ze./ MvezvtuMx/ fwhegh&e rlg<
mbgbtk btufjJtlt hnuNu.
3. ftuLx[tfxh©eytuyu xuLzhle mt&u BGþrlrmvj btLg hSMx[uNlle/ dJobuLx hSMx[uNlle ftuve, (xuLzh ftuve <&t yLg vwhtJt
mt&u) yawf mtbuj fhJtle hnuNu ylu fJh Wvh xuLzh lkch <&t ftuLxufx lkch sYh MvÐ œNtoJJtltu hnuNu.ck^ fhJh Wvh
xuLzh ltuxem lkch, xuLzh lkch, ftblwk ltb <&t, ftuLx[[tfxhle mkM&tlwk ltb <&t ftuLxufx lkch yJ~g œNtoJJtlt hnuNu.
ftuLx[tfxhtuyu xuuLzhbt cukfl wltb, Ft<t lkch, btRfh lkch ylu mhltb wMvÐ yûthtubtk jFJw.
4. xuLzh Ve vu ytuzoh / zebtLz z[tVx&e aqfJJtlehnuNu. œhuf xuLzh œeX yjd xuLzh xuLzhVe ChJtle hnuNu.
5. ytuAe hfble xuLzh Ve, R.yub.ze. fu xuLzh Ve, R.yub.ze. ÂJltlt xuLzhtu hœct<j (fuLmj) dKtNu.
6. xuLzh mt&u BþfJtbtk ytJ<e yluoMxble, xuLzhle hfblt 1% «btKu cukf duhLxe / zebtLz z[tVx / vu ytuzoh / jtufj btRfh
auf&e s MJefthJtbtk ytJNu. œhuf xuLzh œeX yjd R.yub.ze. ChJtle hnuNu. R.yub.ze. hfb Yt. yuf fhtuz mwDele
ykœtS< hfblt ftb btxu jtufj btRfh auf, rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle
ykœtS< hfblt ftb btxu R.yub.ze.le hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckuf duhkxelt MJYvbtk ytvJtle hnuNu.
7. cukf duhuLxe btºt ybœtJtœ Nnuhle s MJefthJtbtk ytJNu.
8. xuLzh Ve <&t R.yub.ze.le hfblt ze.ze./ aufle vtA¤ ftuLx[tfxh©eyu vtu<tle mkM&tlwk ltb <&t btuctRj lkch yJ~g
jFJtltu hnuNu. ftuLx[t¾xhu vtu<tle mkkM&tlt auf <&t ze.ze. xuLzh R~gw > <theF ctœlt s ytvJt.
9. Nh<e xuLzhtu hœ ct<j dKtNu.
10. stu xuLzhbtk MvÐ WÕjuF fhtguj ntug <tu atubtmtlu fthKu Ft<tfeg MËalt yLJgu ßgthu ßgthu ftb ck^ htFJtLþk &tg <u
mbglu ftble BþÆ<btk bshu ytvJtbtk ytJNu. vhkðþ yt yLJgu ftuE CtJ J^thtu ytvJtbtk ytJNu lne. sule ltuk^ >huf
11. xuuLzhtu ftuEvK fthK ytÃgt rmJtg MJefthJt fu lrnk MJefthJt <ule mkÃËKo m•tt BGþrlrmvj frbNlh©ele hnuNu.
12. xuLzhbtk stu ftuR mwDtht JDtht ntug <tu <u ykd xuLzh Ch<t vnujt AuÕju œJmu rlg< JucmtRx y&Jt fauheyu sYhe <vtm
fhelu s xuLzh btufjJw.
13. mefgtuhexe zevtuÍex/ vVtuboLm duhuLxele hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu jtufj btRfh auf, rzbtLz
z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu mefgtuhexe zevtuÍex/
vhVtuboLm duhkxele hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckufduhkxelt MJYvbtk ytvJtle hnuNu.
14. ytuljtRl yul-«tufgwh JucmtRx vh&e ChJtlt &<t xuLzhbtk ftuLx[tfxh/ yusLmeyu xuLzhle ntzo ftuvebtk CtJ Cgto
Jdhle mne mefft fhe mcbex fhJtle hnuNu. stu <ubtk CtJ Chuj nNu <tu <uJt xuLzh hœ fhJtbtk ytJNu.
15. mœh xuLzhbtk ” GST rl<e rlgb bwsc jtdw vzNu ” <u bwsc dK<he fhe xuLzhtu ChJtlt hnuNu.
16. mœh xuLzhbtk ” dwsht< mhfth ©e lt ©b,ftiNÕg rJftm ylu htusdth rJCtd,mraJtjg,dtk^eldh lt XhtJ ¢btkf:
LED/WRT/e-file/11/2024/0293/M2 Dt.15.02.2024” bwsc awM<vKu ybj fhJtltu hnuNu.
zebtLz z[tVx / auf “BgwÂlÂmvj fÂb§h, ybœtJtœ” lt ltbltu fZtJJtu.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP ( West Zone)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 41.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .