| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 CrAccepted-AOC | ₹5.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹5.4 Cr+₹9.8 L (1.85%)Rejected-AOC | ₹5.4 Cr+₹9.8 L (1.85%) | L2 | Rejected-AOC L2 |
| 3 | L3₹5.7 Cr+₹44.1 L (8.32%)Rejected-Finance | ₹5.7 Cr+₹44.1 L (8.32%) | L3 | Rejected-Finance L3 |
Tender Value
₹6.1 Cr
EMD Value
₹2 L
Closing Date
17 Dec 2019, 3:00 pmClosed
Superintending Engineer
Kerala Water Authority, PH Circle, Kalmandapam , Palakkad
Supplying, Laying, Testing, Commissioning and Maintenance of distribution lines using DI ,PVC and GI Pipes including linking works , Road restoration and minor renovation works to existing OHSR
2019_KWA_324850_1
24/19-20/SE/PHC/PKD
Open Tender
Civil Works - Others
Lump-sum
180 days
Shornur municipality
As per NIT
3 documents required · 3 mandatory
₹11,200
online
₹2 L
Yes
PH Circle Palakkad
25 Feb 2020
26 Nov 2019
20 Dec 2019
26 Nov 2019
17 Dec 2019
26 Nov 2019
26 Nov 2019 - 6 Dec 2019
6 Dec 2019
Amount
KIIFB- UWSS to Shornur Municipality - Supplying Laying Distribution System from 12.50 LL OHSR , Zone-1, ( ShornurTown ) phase-I
1.. Supplying and laying of Distribution lines from 12.50LL OHSR Shornur in Shornur Municipality zone I using 450mm DI K9 to 150mm GI pipe (450mm DI K9 - 257m,400mm DI K9 - 51m,350mm DI K9 - 367m,300mm DI K9 - 1428m,250mm DI K9 - 337m,200mm DI K9 - 955m,450mm DI D/F pipe - 24m,400mm DI D/F pipe - 6m,350mm DI DD/F pipe- 6m,300mm DI D/F pipe - 18m,250mm DI D/F pipe- 12m,200mm DI D/F pipe 12m,450mm 10mmthick MS DD/F pipe - 14m,250mm10mm thick MS D/F Pipe 36m,160mm PVC CL 3 - 18920m,160mm PVC CL 4 - 10871m,150mm GI (M) - 186m, including spare,450mm CI D/F Valve 2No,350mm Valve 1No,300mm CI D/F Valve 1No,250mm CI D/F Valve 1No,200mm CI D/F Valve 2No,150mm CI D/F Valve 18No,100mmCI Air valve 2No,80mm CI Air valve 3No and 40mm CI Air Valve 20No,) and minor renovation work to existing OHSR,shifting water service connection to new line,road restoration and all other works mentioned in NIT volume 2.(Scope of work). (It is the responsibility of the contractor to complete all works in the scope of work, successfully, trial run and commissioning and maintain the entire work done by him for the maintenance period of 12 months after commissioning and handing over the scheme to KWA. The defect liability period (guarantee period) is 2 years from date of commissioning. The quoted amount shall be inclusive of all incidental charges, etc. for completion of all works in scope of work as per site conditions)
M ASHRAF
RISHAD P M
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .