Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.1 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹4.9 L+₹85,977.61 (21.2%)Rejected-Finance | 2 | Rejected-Finance L2 | |
| 3 | 3₹5.5 L+₹1.4 L (35.4%)Rejected-Finance | 3 | Rejected-Finance L3 | |
| 4 | 4₹5.9 L+₹1.8 L (44.6%)Rejected-Finance | 4 | Rejected-Finance L4 | |
| 5 | 5₹5.9 L+₹1.9 L (45.6%)Rejected-Finance | 5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | JAYAKRISHNAN P R (J K ASSOCIATES) L3 | NAUFAL P L5 | PRASEEN APPURATH L4 | GIREESH .M L2 | PRABEESH T K L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00Branch cutting of trees | ||||||||
| 1.00 | OD354939/2025-2026:Clearing and removing grass, small bushes and other dirty matters from open terrace and sunshade of building and disposal of the debris to a safe distant place including all labour charges, scaffolding charges, hire charges etc. complete, | 192 | sqm | 182 ₹34,944 | 198 ₹38,016 | 190 ₹36,480 | 80 ₹15,360 Lowest | 136.17 ₹26,144.64 |
| 1.00 | OD354934/2025-2026:Engaging tipper for the removal of cut trees branches from the place to stacking yard. | 5 | Day | 5,374.5 ₹26,872.5 | 5,779 ₹28,895 | 5,700 ₹28,500 | 5,000 ₹25,000 | 3,958.65 ₹19,793.25 Lowest |
| 1.00 | OD354935/2025-2026:Hire charge for saw Machine | 45 | Day | 1,933 ₹86,985 | 2,080 ₹93,600 | 2,080 ₹93,600 | 1,500 ₹67,500 | 1,425.12 ₹64,130.4 Lowest |
| 1.00 | OD354941/2025-2026:Engaging Man Mazdoor for assisting wood wood cutters for cutting branches of trees | 35 | each | 920 ₹32,200 | 994 ₹34,790 | 990 ₹34,650 | 1,500 ₹52,500 | 680.89 ₹23,831.15 Lowest |
| 1.00 | OD354937/2025-2026:Labour Engaging for additional work | 10 | each | 920 ₹9,200 | 994 ₹9,940 | 990 ₹9,900 | 1,200 ₹12,000 | 680.89 ₹6,808.9 Lowest |
| 1.01 | OD354936/2025-2026:Fitter engaged for industrial work | 10 | Day | 1,123.6 ₹11,236 | 1,208 ₹12,080 | 1,200 ₹12,000 | 1,600 ₹16,000 | 827.62 ₹8,276.2 Lowest |
| 1.01 | OD354938/2025-2026:Engaging Plumber for repair works | 20 | each | 1,123.5 ₹22,470 | 1,208 ₹24,160 | 1,200 ₹24,000 | 1,200 ₹24,000 | 827.62 ₹16,552.4 Lowest |
| 1.01 | OD354940/2025-2026:Engaging Labour for Carpentry work | 20 | no | 1,123.5 ₹22,470 | 1,208 ₹24,160 | 1,200 ₹24,000 | 1,100 ₹22,000 | 827.62 ₹16,552.4 Lowest |
| 1.01 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 2,050 | sqm | 15.2 ₹31,160 | 16 ₹32,800 | 16 ₹32,800 | 10 ₹20,500 Lowest | 11.44 ₹23,452 |
Tender Value
₹5.9 L
EMD Value
₹14,822
Closing Date
29 Jul 2026, 3:00 pmClosed
Assistant executive engineer
PWD special buildings sub division kozhikode
GENERALPremonsoon 2026-27 -premonsoon works at various hostel attached to govt medical college kozhikode-premonsoon hostel 2026-27-General Civil Work
2026_PWD_860064_2
PWD/BLDG/TR/4823/2026_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
180 days
kozhikode
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,310
Yes
₹14,822
Yes
1 Sept 2026
23 Jul 2026
31 Jul 2026
23 Jul 2026
29 Jul 2026
23 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Branch cutting of trees | |||||
| 1.001 | OD354939/2025-2026:Clearing and removing grass, small bushes and other dirty matters from open terrace and sunshade of building and disposal of the debris to a safe distant place including all labour charges, scaffolding charges, hire charges etc. complete, | - | sqm | - | - |
| 1.002 | OD354934/2025-2026:Engaging tipper for the removal of cut trees branches from the place to stacking yard. | - | Day | - | - |
| 1.003 | OD354935/2025-2026:Hire charge for saw Machine | - | Day | - | - |
| 1.004 | OD354941/2025-2026:Engaging Man Mazdoor for assisting wood wood cutters for cutting branches of trees | - | each | - | - |
| 1.005 | OD354937/2025-2026:Labour Engaging for additional work | - | each | - | - |
| 1.006 | OD354936/2025-2026:Fitter engaged for industrial work | - | Day | - | - |
| 1.007 | OD354938/2025-2026:Engaging Plumber for repair works | - | each | - | - |
| 1.008 | OD354940/2025-2026:Engaging Labour for Carpentry work | - | no | - | - |
| 1.009 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1458217.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1458217.xls
BOQ • 0.25 MB
nit.pdf
Tender Documents • 0.03 MB
sbd.pdf
Tender Documents • 1.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .