Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹8.8 LAccepted-Finance AT UPPER BOOTY NEAR KRISHNA NURSING HOME P S SADAR RANCHI JHARKHAND 835217 | RANCHI | JHARKHAND | 835217 | ₹8.8 L | L 1 | Accepted-Finance Lowest bid. |
| 2 | L 2₹9.9 L+₹1.1 L (12.5%)Rejected-Finance BOOTY SADAR RANCHI 835219 | RANCHI | RANCHI | JHARKHAND | 835219 | ₹9.9 L+₹1.1 L (12.5%) | L 2 | Rejected-Finance Not lowest bid. |
Tender Value
₹9.7 L
EMD Value
₹19,500
Closing Date
11 Aug 2026, 1:30 pmClosed
GM TZ II Dumka
Campus 132 33kV Grid Sub Station, Maharo, DUMKA
Housekeeping work of 3x50 MVA, 132 33 kV Grid Sub Station, Maharo, Dumka for the period from 16.08.2026 to 31.03.2027 i.e. 7.5 months
2026_JSEB_116375_1
eNIT No 343/PR/JUSNL/2026-27
Open Tender
Housekeeping/ Cleaning
Works
228 days
Maharo Dumka
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,476
₹19,500
Yes
14 Aug 2026
21 Jul 2026
12 Aug 2026
21 Jul 2026
11 Aug 2026
21 Jul 2026
Manpower for regular cleaning of outside building, cleaning of unwanted plants/bushes around control room building, store, water drainage of GSS, cable trench, approach road, Entrace gate, rest premises of GSS as well as complete switchyard area of GSS Maharo and gardening work etc as per directon of E/I (2 Labour x 7.5 Month)= 15 Mandays
Cutting and removal of grass, putus, bushes and unwanted growth of plants in the 132/33 KV switchyard 03 times in the whole period of work. (This work include the complete cleaning/digging of grass, so that switchyard gravel must always be visible.) Total Cleaning Area :- 3.2 Hectare, (i.e 3.2 Hectare x 03 time =9.6 Hectare)
Cutting and removal of grass, putus, bushes and unwanted growth of plants in the 132/33 KV other then switchyard and rest of the GSS and outside along boundry wall beside roads 01 time in the whole period of work. Total Cleaning Area :- 7.08 Hectare, (i.e 7.08 Hectare x 01 time = 7.08 Hectare)
Cutting and removal of grass, putus, bushes and unwanted growth of plants in the grid residential colony campus Dumka and outside along the boundry wall beside the roads 03 times in the whole period of work. Total Cleaning Area :- 3.50 Hectare, (i.e 3.50 Hectare x 03 time = 10.5 Hectare)
Sub Total (A) for Sl No.1
Approximate increase in VDA during a year @ 10% on Sub Total (A)
Sub Total (B) (Sl. No.5+6)
Sub Total ( C ) for Sl No. 2 + 3 + 4
Contractor profit on Sub-Total (B) (To be quoted by bidder in digit only upto two decimal places only) (Note-Maximum 10% and not Below than 0%)
Overhead Expenditure on Safety PPE Kit and T&Ps @ 03 % on Sub Total (B)
Employer's ESIC Contribution @ 3.25% on Sub-Total (B)
EPF Contribution of Employer@12% on Sub-Total (B)
Administrative Charges @ 0.5% on Sub-Total (B)
Sub Total (C) (Sl. No.- 7+8+9+10+11+12+13+14)
CGST @ 09% on Sub Total (C)
SGST @ 09% on Sub Total (C)
Sub Total (D) (Sl. No.- 15+16+17)
Labour Cess @ 1% on Sub Total (D)
Grand Total (Sl. No.- 18+19)
Say Rs.
Rupees
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.47 MB
343Maharohousekeepingtenderdocument.pdf
Tender Documents • 1.46 MB
343MaharohousekeepingPricepartII.xls
Additional Documents • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .