Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.5 LAccepted-AOC | L1 | Accepted-AOC lowest | |
| 2 | L2₹9.8 L+₹34,130 (3.60%)Rejected-AOC | L2 | Rejected-AOC 2nd lowest | |
| 3 | Rejected-Technical ASSALIPARAMBIL PAMPADY KOTTAYAM | KOTTAYAM | KERALA | 686001 | - | Rejected-Technical 3rd lowest | |
| 4 | Rejected-Technical KOLATH NILAPOLA P O | KERALA | - | Rejected-Technical 4th lowest | |
| 5 | Rejected-Technical | - | Rejected-Technical 5th lowest |
Tender Value
Refer Docs
EMD Value
₹31,000
Closing Date
25 Jan 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Executive Engineer
MI sub division kottayam
EW
2021_Irrig_406855_1
53/AEE/MI/SUBDN/KTM/2020-2021
Open Tender
Civil Works - Others
Item Rate
180 days
kurichy
Please refer Tender documents.
5 documents required · 5 mandatory
₹3,100
Yes
₹31,000
Yes
16 Mar 2021
18 Jan 2021
28 Jan 2021
18 Jan 2021
25 Jan 2021
18 Jan 2021
60 days
Amount
SCHEME-1- DEEPENING Reach 1
2.1.1 : Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
2.33.1 : Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth
SCHEME -2- DEEPENING OF THODU - Reach 2
2.1.1 : Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
SCHEME-3 -DEEPENING Reach 3
2.1.1 : Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
SCHEME- 4 - DEEPENING Of Thodu Reach 4
2.1.1 : Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
SCHEME- 5 - DEEPENING of Thodu- Reach 5
2.1.1 : Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
SCHEME - 6 - DEEPENING OF THODU Reach 6
2.1.1 : Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
SCHEME - 7 - DEEPENING OF THODU Reach 7
2.1.1 : Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
SCHEME - 8 - DEEPENING OF THODU Reach 8
2.1.1 : Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
SCHEME - 9 - DEEPENING OF THODU Reach 9
2.1.1 : Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
Abraham Joseph
JACOB GEORGE
SMART LINE CONSTRUCTIONS AND DEVELOPERS
Bidder Name
Abraham Joseph
JACOB GEORGE
Joseph Thomas
SMART LINE CONSTRUCTIONS AND DEVELOPERS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .