| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 LAdmitted-Fee/PreQual/Technical/Finance EDATHARA | ₹5.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹5.5 L+₹26,727.97 (5.16%)Admitted-Fee/PreQual/Technical/Finance | ₹5.5 L+₹26,727.97 (5.16%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | MANIKANDAN .P L2 | VISHNU M L1 |
|---|---|---|---|---|---|
| 1.00Civil work | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 57.28 | cum | 350 ₹20,049.75 | 342 ₹19,591.47 Lowest |
| 1.00 | 16.78.1:Construction of granular sub- base by Providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, Carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in- Charge.With Material conforming to Grade - I ( size range 75 mm to 0.075 mm) having CBR Value- 30 | 25.16 | cum | 3,333 ₹83,858.28 | 3,172 ₹79,807.52 Lowest |
| 1.00 | 16.42:Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size ) in pavements, laid to required slope and camber in panels as required including consolidation finishing and tamping complete | 4.39 | cum | 9,000 ₹39,528 | 8,815 ₹38,715.48 Lowest |
| 1.00 | OD92661/2026-2027:Providing and laying of Interlock concrete block pavements having thickness 80mm (M30) as per drawings and
technical specification clause 1504 confirming to IS 15658 and to be laid as per IRC SP63 excluding edge concreting | 251.6 | per sqm | 1,050 ₹2,64,180 | 1,040 ₹2,61,664 Lowest |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 9 | sqm | 370 ₹3,330 | 367 ₹3,303 Lowest |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.35 | cum | 9,000 ₹12,150 | 8,783.4 ₹11,857.59 Lowest |
| 1.01 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 585 | kg | 200 ₹1,17,000 | 169 ₹98,865 Lowest |
| 1.01 | OD462502/2025-2026:Supply and fixing Granite Name board | 1 | 1 nos | 5,000 ₹5,000 | 4,564 ₹4,564 Lowest |
Tender Value
₹5.5 L
EMD Value
₹13,637
Closing Date
16 Sept 2026, 4:00 pmClosed
SECRETARY
SECRETARY PALAKKAD BLOCK PANCHAYATH
Construction of open gym at puthukulangara Area ward 21 in Pirayiri grama panchayat
2026_CRD_868454_1
ET/SEC/1/1094/26
Open Tender
Civil Works - Others
Item Rate
PALAKKAD BLOCK PANCHAYATH
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,205
Yes
₹13,637
Yes
18 Sept 2026
9 Sept 2026
18 Sept 2026
9 Sept 2026
16 Sept 2026
9 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil work | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 57.29 | cum | - | - |
| 1.002 | 16.78.1:Construction of granular sub- base by Providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, Carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in- Charge.With Material conforming to Grade - I ( size range 75 mm to 0.075 mm) having CBR Value- 30 | 25.16 | cum | - | - |
| 1.003 | 16.42:Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size ) in pavements, laid to required slope and camber in panels as required including consolidation finishing and tamping complete | 4.39 | cum | - | - |
| 1.004 | OD92661/2026-2027:Providing and laying of Interlock concrete block pavements having thickness 80mm (M30) as per drawings and
technical specification clause 1504 confirming to IS 15658 and to be laid as per IRC SP63 excluding edge concreting | 251.6 | per sqm | - | - |
| 1.005 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 9 | sqm | - | - |
| 1.006 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.35 | cum | - | - |
| 1.007 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 585 | kg | - | - |
| 1.008 | OD462502/2025-2026:Supply and fixing Granite Name board | 1 | 1 nos | - | - |
stage.html
html • 0.02 MB
finance_1470818.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1470818.xls
BOQ • 0.30 MB
IPACT.pdf
Tender Documents • 0.23 MB
SBDDocument.pdf
Tender Documents • 1.78 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .