Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹6.7 Laccepted-aoc | accepted-aoc |
Tender Value
₹7.5 L
EMD Value
₹7,504
Closing Date
26 Aug 2026, 3:30 pmClosed
Executive Engineer PRI Visakhapatnam
VISAKHAPATNAM
Completion of Incomplete Anganwadi building at Kamakotam Village of Jalampalli GP of V.Madgula Mandal of Anakapalli District , Estimate cost of Rs.9.00 Lakhs. Grant : NTPC CSR Grant.
978283
Nit No.16/ NTPC CSR Grant /EEPRIAKP/2026-27/Dt.06.08.2026 (1st Call-Short tender))
OPEN - NCB
Buildings
ANAKAPALLI, ANDHRA PRADESH
5 documents required · 5 mandatory
₹266
₹7,504
1 Oct 2026
19 Aug 2026
19 Aug 2026
Earth Work Excavation for Foundations (Manual Means) of Buildings in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., complete for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308) Including contract profit, overhead charges, But excluding GST and Seigniorage charges .
Filling with Sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including all operational, incidental labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)Including contract profit, overhead charges, But excluding GST and Seigniorage charges .
Plain Cement Concrete (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) for foundations using 40mm size (SS5) hard,machine crushed granite metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations ramming in 15cm layers finishing top surface to the required level curing etc., complete for finished item of work. (APSS No. 402) Including contract profit, overhead charges, But excluding GST and Seigniorage charges .
Plain Cement Concrete (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using 40mm size (SS5) hard,machine crushed granite metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., complete for finished item of work. (APSS No. 402)Including contract profit, overhead charges, But excluding GST and Seigniorage charges .
Vibrated Reinforced Cement Concrete M-20 NominalMix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403) Footings Including contract profit, overhead charges, But excluding GST and Seigniorage charges .
Vibrated Reinforced Cement Concrete M-20 NominalMix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403) pedastals
Vibrated Reinforced Cement Concrete M-25 Design Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403) columns Including contract profit, overhead charges, But excluding GST and Seigniorage charges .
Refilling of available excavated Earth (excluding rock) with a lead of 50 mts in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including all operational, incidental labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
Random Rubble Stone Masonry, in CM (1:8) prop: (Cement: Sand) using hard granite stones from approved quarry including cost and conveyance of all materials like cement, sand, water, stones etc., from approved quarry to the site and including cost of seigniorage charges and all other taxes on all materials including labour for cutting stones to required size and shape, mixing of cement mortar, construction, scaffolding charges, curing etc., complete for finished item of work in Foundation and Basement (APSS No. 601& 615)Including contract profit, overhead charges, But excluding GST and Seigniorage charges .
Vibrated Reinforced Cement Concrete M-20 Nominal Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403)plinth beam Including contract profit, overhead charges, But excluding GST and Seigniorage charges .
Filling with Selected earth in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including all operational, incidental labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) Including contract profit, overhead charges, But excluding GST and Seigniorage charges .
Vibrated Reinforced Cement Concrete M-25 Design Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403)Roof beam Including contract profit, overhead charges, But excluding GST and Seigniorage charges .
Vibrated Reinforced Cement Concrete M-25 Design Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403)Roof Slab 125mm thick Including contract profit, overhead charges, But excluding GST and Seigniorage charges .
Providing Impervious Coat to exposed RCC Roof Slab surfaces to required slopes with CM (1:3) prop. 20mm thick (average) mixing with water proofing compound from reputed manufacturers as approved by Engineer-in- charge at 1 Kg/bag of cement laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cm x 45cm including cost and conveyance of materials like cement, sand, water proofing compound etc., to site, cost of seigniorage charges and all other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., complete for finished item of work (APSS No. 901 & 903)Including contract profit, overhead charges, But excluding GST and Seigniorage charges .
Vibrated Reinforced Cement Concrete M-20 Nominal Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403) lintels,Including contract profit, overhead charges, But excluding GST and Seigniorage charges .
Vibrated Reinforced Cement Concrete M-25 Design Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403)sunshades,Including contract profit, overhead charges, But excluding GST and Seigniorage charges .
Brick Masonry for panel walls in superstructure with CM (1:8) prop: (cement : sand) using second class traditional bricks of size 23x11x7 cm from approved quarry and having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504).For Super Structure,Including contract profit, overhead charges, But excluding GST and Seigniorage charges .Including contract profit, overhead charges, But excluding GST and Seigniorage charges .
Ornamental Plastering to Ceiling 12mm thick in single coat in CM(1:3) including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903) Including contract profit, overhead charges, But excluding GST and Seigniorage charges .
Plastering 12mm thick in Single coat for even surfaces in CM (1:5) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, cost of seigniorage charges and all other taxes on all materials, and operational, incidental charges and all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves etc. as directed by Engineer-in-charge, complete for finished item of work (APSS No. 901 & 904)Including contract profit, overhead charges, But excluding GST and Seigniorage charges .
Supplying , Fitting and Placing Fe 500 HYSD Bar Reinforcement in VRCC works complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel , binding wire etc., lifting charges of steel , placing in position, tying with binding wire , all tools etc., complete for finished item of work Including contract profit, overhead charges, But excluding GST and Seigniorage charges .
Supply and Fixing of Doors as per approved drawings with Sal Wood frame of section 100mm x 65 mm and ISI marked flush door shutter of 30mm thick Single Shutters with bond wood solid block board type Core having with Commercial ply on Both faces conforming to IS 2202 of shubdwara /Anand as standard specification) , including cost and conveyance to site of sal wood frame, flush shutter including supply and fixing 6 nos MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked M.S Powder Coated fixtures of 3 Nos butt hinges 150mm long , 1 No. aldrop 300mm x 16 mm dia, 1 Nos tower bolts of 300 mm x 12 mm dia at top, 1 No. tower bolt of 150mm x 12mm dia at bottom, 2 Nos. 150mm long handles, 1 Nos heavy duty door stoppers and 1 Nos rubber bushes including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc. complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) (Door of Size 1050mm x 2100mm) D1 including Over Heads & Contractor's Profit
Providing and fixing factory made uPVC white colour sliding glazed windowupto 1.50 m in height dimension comprising of uPVC multi-chamberedframe with in-built roller track and sash extruded profiles duly reinforcedwith 1.60 ± 0.2 mm thick galvanized mild steel section made from rollforming process of required length (shape & size according to uPVCprofile), appropriate dimension of uPVC extruded glazing beads anduPVC extruded interlocks, EPDM gasket, wool pile, zinc alloy (whitepowder coated) touch locks with hook, zinc alloy body with single nylonrollers (weight bearing capacity to be 40 kg), G.I fasteners 100 x 8 mmsize for fixing frame to finished wall and necessary stainless steel screwsetc. Profile of frame & sash shall be mitred cut and fusion welded at allcorners, including drilling of holes for fixing hardware's and drainage ofwater etc. After fixing frame the gap between frame and adjacent finishedwall shall be filled with weather proof silicon sealent over backer rod ofrequired size and of approved quality, all complete as per approved drawing& direction of Engineer-in-Charge inclusive of cost of Single / double glass panes, wire mesh and silicon sealent Two track two panels sliding window made of (small series) frame 52 x 44 mm &sash 32 x 60 mm both having wall thickness of 1.9 ± 0.2 mm and single glazing bead of appropriate dimension. (Area of window upto 1.75 sqm) BMT-P.80.AIncluding contract profit, overhead charges, But excluding GST and Seigniorage charges .
Ellispattern flooring with CC (1:5:10) 80mm thick using 40mm HBG metal existing and CC (1:2:4) using 20mm HBG metal 40mm thick and top plastered with CM (1:3) 7 mm thick including cost and Cost and Conveyance of water to site and all operational, incidental, labour charges, and other taxes etc, hire charges of T & P etc., complete for finished item of work. -10 SqmIncluding contract profit, overhead charges, But excluding GST and Seigniorage charges .
Supply & Fixing of M.S Grills to Doors, Windows and Compound Wall Gates etc using M.S Flats,M.S Square Rods, M.S Pipes including Cost and Conveyance of All Materials including Welding,Fabrcation and Fixing chares etc Complete as per the directions of the Engineering InchargeIncluding contract profit, overhead charges, But excluding GST and Seigniorage charges .
TOTAL 28 (Twenty Eight ) ITEMS
Earth Work Excavation for Foundations (Manual Means) of Buildings in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., complete for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308) Including contract profit, overhead charges, But excluding GST and Seigniorage charges .
Filling with Sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including all operational, incidental labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)Including contract profit, overhead charges, But excluding GST and Seigniorage charges .
Plain Cement Concrete (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) for foundations using 40mm size (SS5) hard,machine crushed granite metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations ramming in 15cm layers finishing top surface to the required level curing etc., complete for finished item of work. (APSS No. 402) Including contract profit, overhead charges, But excluding GST and Seigniorage charges .
Plain Cement Concrete (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using 40mm size (SS5) hard,machine crushed granite metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., complete for finished item of work. (APSS No. 402)Including contract profit, overhead charges, But excluding GST and Seigniorage charges .
Vibrated Reinforced Cement Concrete M-20 NominalMix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403) Footings Including contract profit, overhead charges, But excluding GST and Seigniorage charges .
Vibrated Reinforced Cement Concrete M-20 NominalMix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403) pedastals
Vibrated Reinforced Cement Concrete M-25 Design Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403) columns Including contract profit, overhead charges, But excluding GST and Seigniorage charges .
Refilling of available excavated Earth (excluding rock) with a lead of 50 mts in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including all operational, incidental labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
Random Rubble Stone Masonry, in CM (1:8) prop: (Cement: Sand) using hard granite stones from approved quarry including cost and conveyance of all materials like cement, sand, water, stones etc., from approved quarry to the site and including cost of seigniorage charges and all other taxes on all materials including labour for cutting stones to required size and shape, mixing of cement mortar, construction, scaffolding charges, curing etc., complete for finished item of work in Foundation and Basement (APSS No. 601& 615)Including contract profit, overhead charges, But excluding GST and Seigniorage charges .
Vibrated Reinforced Cement Concrete M-20 Nominal Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403)plinth beam Including contract profit, overhead charges, But excluding GST and Seigniorage charges .
Filling with Selected earth in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including all operational, incidental labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) Including contract profit, overhead charges, But excluding GST and Seigniorage charges .
Vibrated Reinforced Cement Concrete M-25 Design Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403)Roof beam Including contract profit, overhead charges, But excluding GST and Seigniorage charges .
Vibrated Reinforced Cement Concrete M-25 Design Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403)Roof Slab 125mm thick Including contract profit, overhead charges, But excluding GST and Seigniorage charges .
Providing Impervious Coat to exposed RCC Roof Slab surfaces to required slopes with CM (1:3) prop. 20mm thick (average) mixing with water proofing compound from reputed manufacturers as approved by Engineer-in- charge at 1 Kg/bag of cement laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cm x 45cm including cost and conveyance of materials like cement, sand, water proofing compound etc., to site, cost of seigniorage charges and all other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., complete for finished item of work (APSS No. 901 & 903)Including contract profit, overhead charges, But excluding GST and Seigniorage charges .
Vibrated Reinforced Cement Concrete M-20 Nominal Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403) lintels,Including contract profit, overhead charges, But excluding GST and Seigniorage charges .
Vibrated Reinforced Cement Concrete M-25 Design Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403)sunshades,Including contract profit, overhead charges, But excluding GST and Seigniorage charges .
Brick Masonry for panel walls in superstructure with CM (1:8) prop: (cement : sand) using second class traditional bricks of size 23x11x7 cm from approved quarry and having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504).For Super Structure,Including contract profit, overhead charges, But excluding GST and Seigniorage charges .Including contract profit, overhead charges, But excluding GST and Seigniorage charges .
Ornamental Plastering to Ceiling 12mm thick in single coat in CM(1:3) including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903) Including contract profit, overhead charges, But excluding GST and Seigniorage charges .
Plastering 12mm thick in Single coat for even surfaces in CM (1:5) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, cost of seigniorage charges and all other taxes on all materials, and operational, incidental charges and all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves etc. as directed by Engineer-in-charge, complete for finished item of work (APSS No. 901 & 904)Including contract profit, overhead charges, But excluding GST and Seigniorage charges .
Supplying , Fitting and Placing Fe 500 HYSD Bar Reinforcement in VRCC works complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel , binding wire etc., lifting charges of steel , placing in position, tying with binding wire , all tools etc., complete for finished item of work Including contract profit, overhead charges, But excluding GST and Seigniorage charges .
Supply and Fixing of Doors as per approved drawings with Sal Wood frame of section 100mm x 65 mm and ISI marked flush door shutter of 30mm thick Single Shutters with bond wood solid block board type Core having with Commercial ply on Both faces conforming to IS 2202 of shubdwara /Anand as standard specification) , including cost and conveyance to site of sal wood frame, flush shutter including supply and fixing 6 nos MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked M.S Powder Coated fixtures of 3 Nos butt hinges 150mm long , 1 No. aldrop 300mm x 16 mm dia, 1 Nos tower bolts of 300 mm x 12 mm dia at top, 1 No. tower bolt of 150mm x 12mm dia at bottom, 2 Nos. 150mm long handles, 1 Nos heavy duty door stoppers and 1 Nos rubber bushes including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc. complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) (Door of Size 1050mm x 2100mm) D1 including Over Heads & Contractor's Profit
Providing and fixing factory made uPVC white colour sliding glazed windowupto 1.50 m in height dimension comprising of uPVC multi-chamberedframe with in-built roller track and sash extruded profiles duly reinforcedwith 1.60 ± 0.2 mm thick galvanized mild steel section made from rollforming process of required length (shape & size according to uPVCprofile), appropriate dimension of uPVC extruded glazing beads anduPVC extruded interlocks, EPDM gasket, wool pile, zinc alloy (whitepowder coated) touch locks with hook, zinc alloy body with single nylonrollers (weight bearing capacity to be 40 kg), G.I fasteners 100 x 8 mmsize for fixing frame to finished wall and necessary stainless steel screwsetc. Profile of frame & sash shall be mitred cut and fusion welded at allcorners, including drilling of holes for fixing hardware's and drainage ofwater etc. After fixing frame the gap between frame and adjacent finishedwall shall be filled with weather proof silicon sealent over backer rod ofrequired size and of approved quality, all complete as per approved drawing& direction of Engineer-in-Charge inclusive of cost of Single / double glass panes, wire mesh and silicon sealent Two track two panels sliding window made of (small series) frame 52 x 44 mm &sash 32 x 60 mm both having wall thickness of 1.9 ± 0.2 mm and single glazing bead of appropriate dimension. (Area of window upto 1.75 sqm) BMT-P.80.AIncluding contract profit, overhead charges, But excluding GST and Seigniorage charges .
Ellispattern flooring with CC (1:5:10) 80mm thick using 40mm HBG metal existing and CC (1:2:4) using 20mm HBG metal 40mm thick and top plastered with CM (1:3) 7 mm thick including cost and Cost and Conveyance of water to site and all operational, incidental, labour charges, and other taxes etc, hire charges of T & P etc., complete for finished item of work. -10 SqmIncluding contract profit, overhead charges, But excluding GST and Seigniorage charges .
Supply & Fixing of M.S Grills to Doors, Windows and Compound Wall Gates etc using M.S Flats,M.S Square Rods, M.S Pipes including Cost and Conveyance of All Materials including Welding,Fabrcation and Fixing chares etc Complete as per the directions of the Engineering InchargeIncluding contract profit, overhead charges, But excluding GST and Seigniorage charges .
TOTAL 28 (Twenty Eight ) ITEMS
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Schedule Kamakutam Building.xls
TENDER_DOCUMENT • 0.13 MB
kamakotam BOQ.xlsx
TENDER_DOCUMENT • 0.06 MB
Kamakutam SBD.doc
TENDER_DOCUMENT • 0.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .