| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.5 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹6.6 L+₹11,412.26 (1.75%)Admitted-Fee/PreQual/Technical/Finance S O ABDUL RAHEES THUVVATTU THAZHAM EAVANNOOR PO NARIKKUNI KOZHIKKODE 673686 | KOZHIKODE | KOZHIKODE | KERALA | 673686 | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹6.9 L+₹41,750.44 (6.41%)Admitted-Fee/PreQual/Technical/Finance MANNAPADIKKAL MALAYAMMA | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹7.1 L
EMD Value
₹50,000
Closing Date
22 Sept 2026, 5:00 pmClosed
Assistintant Executive Engineer
Electrical Sub Division Kunnamangalam
Interlinking 11kV line from Parathapoyil to Erimala under Electrical Section Kattangal -HT covered conductor
2026_KSEB_868033_1
E-TENDER/ESD-KLM/2026-27/1 dt. 07-09-2026
Open Tender
Electrical Works
Percentage
Kattanagal
Please refer Tender documents.
6 documents required · 6 mandatory
₹5,900
Yes
₹50,000
Yes
3 Oct 2026
7 Sept 2026
24 Sept 2026
7 Sept 2026
22 Sept 2026
7 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. | 36 | No | 1,373.73 | ₹49,454.28 |
| 2 | Renewal of existing damaged/broken old LT stay in existing stay rod. | 1 | No | 434.91 | ₹434.91 |
| 3 | Providing one Coil Earth using No.8 GI earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. | 33 | No | 1,086.23 | ₹35,845.59 |
| 4 | Fitting and providing one Strut using HT PSC pole including digging and back filling pit in ordinary soil. | 11 | No | 3,056.91 | ₹33,626.01 |
| 5 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. | 33 | No | 1,923.64 | ₹63,480.12 |
| 6 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. | 7 | No | 1,008.86 | ₹7,062.02 |
| 7 | Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). | 4 | No | 4,143.14 | ₹16,572.56 |
| 8 | Dismantling (without damage) one LT PSC/RCC Strut pole including removal of clamps and stacking. | 4 | No | 1,589.09 | ₹6,356.36 |
| 9 | Dismantling one damaged LT PSC/RCC Strut pole including removal of clamps and stacking. | 1 | No | 944.05 | ₹944.05 |
| 10 | Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. | 22 | No | 1,778.32 | ₹39,123.04 |
stage.html
html • 0.02 MB
finance_1470098.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
BOQ_1470098.xls
BOQ • 0.32 MB
ktldoc.pdf
Tender Documents • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .