Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.6 LAccepted-AOC 4TH FLOOR 417 VIPUL BUSINESS PARK ROAD NO 02 SECTOR 48 GURUGRAM HARYANA PIN 122018 | GURUGRAM | GURUGRAM | HARYANA | 122018 | ₹9.6 L Quoted ₹8.1 L | 1 | Accepted-AOC TCR APPROVED IN FO L1 BIDDER. |
| 2 | Rejected-Technical | - | - | Rejected-Technical HIGHER RATE |
| 3 | Rejected-Technical | - | - | Rejected-Technical HIGHER RATE |
| 4 | Rejected-Technical | - | - | Rejected-Technical HIGHER RATE |
Tender Value
₹13.2 L
EMD Value
₹16,500
Closing Date
9 May 2026, 3:00 pmClosed
STAFF OFFICER CIVIL KUJU AREA
CIVIL DEPT. GM OFFICE CCL KUJU AREA KUJU RAMGARH JHARKHAND
Provision of RCC guard wall with speed breaker near RFID check posts under Topa OCP of Kuju Area.
2026_CCL_358827_1
GM(K)/SO(C)/e-NIT/2026-27/42
Open Tender
Civil Works - Others
45 days
TOPA COLLIERY
Please refer NIT.
3 documents required · 3 mandatory
₹16,500
29 May 2026
27 Apr 2026
11 May 2026
29 Apr 2026
9 May 2026
29 Apr 2026
29 Apr 2026 - 3 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 0 | Item Description/ Heading | - | - | - | - | BI01010001010000000000000515BI0100001112 |
| 1 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock. | 69.75 | CUM | 392.85 | ₹27,401.29 | - |
| 2 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 4.5 | CUM | 1,438.1 | ₹6,471.45 | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 6.75 | CUM | 7,424.45 | ₹50,115.04 | - |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. | 130 | Sqm | 277.9 | ₹36,127 | - |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 201.6 | Sqm | 562.75 | ₹1,13,450.4 | - |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 48 | CUM | 8,343.45 | ₹4,00,485.6 | - |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | 3,840 | Kg | 105.6 | ₹4,05,504 | - |
| 8 | Providing and fixing of Heavy Duty Rubber Speed Breakers as per direction of EIC. | 40 | Mtr | 1,800 | ₹72,000 | - |
| 9 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work. | 60.4 | Sqm | 112.3 | ₹6,782.92 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.50 MB
BOQ_371694.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid