| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.1 LAccepted-AOC | ₹15.1 L | L1 | Accepted-AOC Lowest Offer |
| 2 | L2₹15.4 LRejected-Finance | ₹15.4 L | L2 | Rejected-Finance Not Lowest |
| 3 | L3₹18.4 LRejected-Finance | ₹18.4 L | L3 | Rejected-Finance Not Lowest |
| Sl No | Description | Qty | Unit | RUTHIKA BUILDERS L3 | V SAKTHIVEL LABOUR SUPPLY &CIVIL CONTRACTOR L2 | KUMARAN KUDIL CONSTRUCTIONS L1 |
|---|---|---|---|---|---|---|
| 1.00BOQ | ||||||
| 1.01 | EARTH WORK EXCAVATION IN ALL SOILS AND SUB SOILS EXCLUDING ROCK INCLUDING BACKFILLING IN SIDES OF FOUNDATIONS AND BASEMENT, WATERING, CONSOLIDATION, INCLUDING DEWATERING WHEREVER NECESSARY, ETC., AND DISPOSING OFF THE SURPLUS EARTH WITHIN A LEAD OF 40 MTRS AS DIRECTED IN DEPTH FROM GROUND LEVEL TO -2 MTR. | 220 | CUM | 185 ₹40,700 | 172 ₹37,840 Lowest | 207 ₹45,540 |
| 1.02 | CEMENT CONCRETE 1:4:8 USING 25MM DOWN GAUGE BLUE GRANITE AGGREGATE IN FOUNDATIONS, MUD MAT, FLOORING EXCLUDING SHUTTERING BUT INCLUDING RAMMING, LEVELLING, CURING ETC., COMPLETE. | 45 | CUM | 3,800 ₹1,71,000 | 3,680 ₹1,65,600 | 3,600 ₹1,62,000 Lowest |
| 1.03 | PROVIDING COURSED RUBBLE STONE MASONRY WITH POINTING WORKS, SECOND SORT IN CEMENT MORTAR 1:7 WITH THROUGH BOND STONES 2 MTRS APART IN EACH COURSE, PLACED IN A STAGGERED PATTERN AND COURSE NOT LESS THAN 150MM HIGH WITH FACE STONES PLACED HEADERS AND STRETCHERS ALTERNATIVELY TO BREAK JOINTS BY ATLEAST 75MM INCLUDING CURING ETC., COMPLETE FOR FOUNDATION BASEMENT UPTO +1.00 MTR LEVEL. | 230 | CUM | 4,800 ₹11,04,000 | 4,600 ₹10,58,000 | 4,410 ₹10,14,300 Lowest |
| 1.04 | FORM WORK - WROUGHT AND PUT UP WITH GOOD QUALITY MARINE GRADE PLYWOOD FOR ALL TYPES OF SHUTTERING WORKS LIKE FOOTING, RAFT, PLINTH BEAM, ETC., AS "PLASTER FREE FINISH" BELOW GROUND LEVEL AND UPTO FFL. | 75 | SQM | 650 ₹48,750 | 800 ₹60,000 | 630 ₹47,250 Lowest |
| 1.05 | PROVIDING AND FILLING OF CONCRETE SCREED 50MM THICK IN CEMENT CONCRETE 1:2:4 USING 12MM DOWN GRADED AGGREGATE INCLUDING LEVELLING TO REQUIRED SLOPE , RAMMING, CURING, LABOUR CHARGES ETC., COMPLETE AT ALL LEVELS. | 210 | SQM | 950 ₹1,99,500 | 517 ₹1,08,570 Lowest | 540 ₹1,13,400 |
| 1.06 | PREPARE SURFACES OF WALLS AND PLASTER INTERIOR, EXTERIOR AND TOP FACES WITH CEMENT MORTAR 1:4, 12MM THICK AT ALL LEVELS INCLUDING NECESSARY SCAFFOLDINGS AND CURING ETC., COMPLETE. | 300 | SQM | 550 ₹1,65,000 | 517 ₹1,55,100 | 504 ₹1,51,200 Lowest |
| 1.07 | CEMENT CONCRETE M30 USING 20MM SIZE BLUE GRANITE AGGREGATE FOR ALL CEMENT CONCRETE ITEMS SUCH AS FOUNDATIONS, PEDESTALS, COLUMNS, WALLS, SHELL WALL, FOOTING, RAFT, PLINTH BEAM, ETC., EXCLUDING SHUTTERING BUT INCLUDING LEVELLING, CURING, ETC., COMPLETE BELOW GROUND LEVEL AND UPTO FFL. | 15 | CUM | 4,200 ₹63,000 | 4,025 ₹60,375 Lowest | 4,050 ₹60,750 |
| 1.08 | TAKE DELIVERY OF HIGH STRENGTH RIBBED DEFORMED BARS/ MS BARS ISSUED BY TNPL FREE OF COST, CUT, BEND AND TIE UP IN POSITION INCLUDING COST OF SUPPLYING NECESSARY 18 GAUGE BINDING WIRE FOR ALL TYPES OF RCC WORKS AT ALL LEVELS. | 2 | MT | 17,000 ₹34,000 | 14,950 ₹29,900 | 14,400 ₹28,800 Lowest |
| 1.09 | FOR SMALL WORKS WHICH IS UNQUANTIFIED EXACTLY, SUPPLY OF ELECTRICAL CONCRETE BREAKER (BOUSH MAKE -MODEL NO.11E) WITH LABOUR FOR DISMANTLING OF COCNRETE, BRICK WORK, CR MASONRY, ETC., THE WORK INCLUDES DISPOSAL OF DISMANTLED DEBRIS WITHIN THE LEAD OF 2KM APART AS DIRECTED. | 20 | HR | 650 ₹13,000 | 517 ₹10,340 Lowest | 603 ₹12,060 |
Tender Value
Refer Docs
Closing Date
22 May 2026, 3:00 pmClosed
Chief General Manager (Projects and Energy)
PMD Office, TNPL Unit I, Kagithapuram.
Construction of storm water drain in south and western side of TM#5 Plant at TNPL Unit II
2026_TNPL_677256_1
TNPL/PMD/CIV/TM#5/UNIT II/262723000612
Open Tender
Civil Works
Tender cum Auction
60 days
TNPL Unit II, Kagitha Nagar, Mondipatti, Trichy
As per Invitation for Bids of Bid Document
4 documents required · 4 mandatory
₹0
Exempted
6 Jun 2026
16 May 2026
23 May 2026
16 May 2026
22 May 2026
16 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1BOQ | |||||
| 1.01 | EARTH WORK EXCAVATION IN ALL SOILS AND SUB SOILS EXCLUDING ROCK INCLUDING BACKFILLING IN SIDES OF FOUNDATIONS AND BASEMENT, WATERING, CONSOLIDATION, INCLUDING DEWATERING WHEREVER NECESSARY, ETC., AND DISPOSING OFF THE SURPLUS EARTH WITHIN A LEAD OF 40 MTRS AS DIRECTED IN DEPTH FROM GROUND LEVEL TO -2 MTR. | 220 | CUM | - | - |
| 1.02 | CEMENT CONCRETE 1:4:8 USING 25MM DOWN GAUGE BLUE GRANITE AGGREGATE IN FOUNDATIONS, MUD MAT, FLOORING EXCLUDING SHUTTERING BUT INCLUDING RAMMING, LEVELLING, CURING ETC., COMPLETE. | 45 | CUM | - | - |
| 1.03 | PROVIDING COURSED RUBBLE STONE MASONRY WITH POINTING WORKS, SECOND SORT IN CEMENT MORTAR 1:7 WITH THROUGH BOND STONES 2 MTRS APART IN EACH COURSE, PLACED IN A STAGGERED PATTERN AND COURSE NOT LESS THAN 150MM HIGH WITH FACE STONES PLACED HEADERS AND STRETCHERS ALTERNATIVELY TO BREAK JOINTS BY ATLEAST 75MM INCLUDING CURING ETC., COMPLETE FOR FOUNDATION BASEMENT UPTO +1.00 MTR LEVEL. | 230 | CUM | - | - |
| 1.04 | FORM WORK - WROUGHT AND PUT UP WITH GOOD QUALITY MARINE GRADE PLYWOOD FOR ALL TYPES OF SHUTTERING WORKS LIKE FOOTING, RAFT, PLINTH BEAM, ETC., AS "PLASTER FREE FINISH" BELOW GROUND LEVEL AND UPTO FFL. | 75 | SQM | - | - |
| 1.05 | PROVIDING AND FILLING OF CONCRETE SCREED 50MM THICK IN CEMENT CONCRETE 1:2:4 USING 12MM DOWN GRADED AGGREGATE INCLUDING LEVELLING TO REQUIRED SLOPE , RAMMING, CURING, LABOUR CHARGES ETC., COMPLETE AT ALL LEVELS. | 210 | SQM | - | - |
| 1.06 | PREPARE SURFACES OF WALLS AND PLASTER INTERIOR, EXTERIOR AND TOP FACES WITH CEMENT MORTAR 1:4, 12MM THICK AT ALL LEVELS INCLUDING NECESSARY SCAFFOLDINGS AND CURING ETC., COMPLETE. | 300 | SQM | - | - |
| 1.07 | CEMENT CONCRETE M30 USING 20MM SIZE BLUE GRANITE AGGREGATE FOR ALL CEMENT CONCRETE ITEMS SUCH AS FOUNDATIONS, PEDESTALS, COLUMNS, WALLS, SHELL WALL, FOOTING, RAFT, PLINTH BEAM, ETC., EXCLUDING SHUTTERING BUT INCLUDING LEVELLING, CURING, ETC., COMPLETE BELOW GROUND LEVEL AND UPTO FFL. | 15 | CUM | - | - |
| 1.08 | TAKE DELIVERY OF HIGH STRENGTH RIBBED DEFORMED BARS/ MS BARS ISSUED BY TNPL FREE OF COST, CUT, BEND AND TIE UP IN POSITION INCLUDING COST OF SUPPLYING NECESSARY 18 GAUGE BINDING WIRE FOR ALL TYPES OF RCC WORKS AT ALL LEVELS. | 2 | MT | - | - |
| 1.09 | FOR SMALL WORKS WHICH IS UNQUANTIFIED EXACTLY, SUPPLY OF ELECTRICAL CONCRETE BREAKER (BOUSH MAKE -MODEL NO.11E) WITH LABOUR FOR DISMANTLING OF COCNRETE, BRICK WORK, CR MASONRY, ETC., THE WORK INCLUDES DISPOSAL OF DISMANTLED DEBRIS WITHIN THE LEAD OF 2KM APART AS DIRECTED. | 20 | HR | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
BidDocument_262723000612.pdf
Tender Documents • 30.42 MB
BOQ_813768.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].