Additional Chief Engineer (P&C)
Supply, Laying, Erection, Testing and Commissioning of 66kV 1Cx630 sqmm XLPE cable with Poly AL-Poly / Aluminum Corrugated constriction on EPC basis for various lines in Amreli Circle Package-1, Gondal Circle Package-2 and Junagadh Circle Package-3 in Rajkot Zone.
342839
ACE(P&C)/Contract/E-511/66kV UG cable line/EPC
Open
Electrical Works
Works
Vadodara
48 documents required · 27 mandatory · 21 optional
₹11,800
Gujarat Energy Transmission Corporation Limited
₹15 L
6 Oct 2026
9 Sept 2026
14 Oct 2026
9 Sept 2026
23 Sept 2026
9 Sept 2026
Technical Bid. Technical Bid.
c) Payment of Earnest Money
Deposit (EMD) will be
RTGS/NEFT/Online or
Demand Draft or Banker’s
Cheque or Pay Order or Bank
12.2 The bid security is required to Guarantee.
protect the owner against the risk
of Bidder’s conduct, which would 12.2 The bid security is required to
warrant the guarantee forfeiture, protect the owner against the risk of
pursuant to relevant paras Bidder’s conduct, which would
elsewhere warrant the guarantee forfeiture,
pursuant to relevant paras elsewhere
The bid guarantee shall be made
payable to the Owner without any
condition whatsoever.
Seal & Signature of Bidder
12.3 Any bid not secured in The bid guarantee shall be made
accordance with Para 23.1 above payable to the Owner without any
will be rejected by the Owner as condition whatsoever.
non-responsive. No exemptions
are made in the furnishing of the 12.3 Any bid not secured in
security. accordance with Para 23.1 above will
be rejected by the Owner as non-
12.4 Unsuccessful Bidder’s bid responsive. No exemptions are made
security/EMD will be in the furnishing of the security.
returned/refunded on finalization of
tender or three months-from the 12.4 Unsuccessful Bidder’s bid
date of submission of tender security/EMD will be returned/refunded
whichever is later. forthwith on finalization of tender i.e.,
once the award of contract, after opening
of price bids. However, the Bid Security/
EMD of the bidder ranked next (L2) to the
bidder determined as the successful
bidder (L1) shall be retained by GETCO,
along with the Bid Security/ EMD of the
successful bidder. Bid Security/ EMD of
L2 bidder shall be returned immediately
after the Letter of Acceptance/ Award
(LOA) is issued by GETCO to the
successful bidder and acknowledged/
accepted by the successful bidder or the
Contract is signed with the successful
bidder, whichever event occurs earlier.
However, if there is a delay of 21 days or
more in aforesaid events reckoned from
the date of approval of award of contract
by the competent authority, as aforesaid,
the Bid Security/ EMD of the L2 bidder
shall be released immediately after the
said period of 21 days.
If the validity of the bid expires and any
bidder chooses not to extend the bid
validity, the Bid Security/ EMD of such
bidder shall be returned forthwith.
12.5 The successful bidders, Bid
12.5 The successful bidders, Bid Security will be discharged upon,
Security will be discharged upon, furnishing the contract security
furnishing the contract deposit / performance guarantee.
performance guarantee.
12.6 The bid guarantee may be
12.6 The bid guarantee may be forfeited.
a) If a Bidder withdraws its bid
a) If a Bidder withdraws its bid during the period of bid validity
during the period of bid specified by the bidder on the
validity specified by the bid Form:
bidder on the bid Form.
Seal & Signature of Bidder
b) If a bidder refuses to accept b) If a bidder refuses to accept
the contract or fails to the contract or fails to
commence the works commence the works
(including supplies within (including supplies within thirty
thirty days of letter of award days of letter of award of
of contract) contract)
2. Part –I 47.0 Terms of Payment 47.0 Terms of Payment
General The payment for materials to be The payment for materials to be supplied
Conditions supplied and erected shall be and erected shall be made as under only
of Contract/ made as under only after after execution of the contract
Clause 47.0 execution of the contract documents/furnishing of Security Deposit
and on execution of substation work.
and its sub- documents/furnishing of Security 47.1 For Supply
clauses Deposit and on execution of
substation work. 47.1.1 Interest Bearing Advance
47.1 For supply (Optional*):
(i) Interest Bearing Advance
(Optional*): Ten percent (10%) of
the total Ex-works price
component of Substation materials
shall be paid as an interest bearing
initial advance, at the rate of interest
as per (ii) below, after signing the
Contract Agreement and on
submission of the following:
(a) Proforma invoice(s),
(b) Advance Bank Guarantee for
[{110% (one hundred ten percent) of
the amount of Advance}], from a
Public Sector Indian bank/Scheduled,
Commercial Bank in the form
attached herewith as Annexure-I
(The guarantee shall be initially valid
up to 90 days after the Time of
Completion and shall be reduced at
the end of every Quarter prorata to
the advance adjusted),
(c) Performance Securities in line with
GCC Clause 36.0 including its sub-
Provided further that the Proforma
Invoice(s) for advance payment along
with all supporting documents is
submitted by the Contractor to the
Employer within 3 months from the
date of Letter/ Notification of Award.
In case the Contractor does not
Seal & Signature of Bidder
submit the requisite documents
including applicable Bank
Guarantee(s) /Security(ies) within the
aforesaid period, the advance shall
not be payable. The Contractor shall,
within 7 days from the date of receipt
of Advance, furnish an Advance
Receipt Voucher to the Employer, as
prescribed under the GST Law.
Note: * This payment is an optional
payment. The Contractor has the
option of taking the interest bearing
initial advance or otherwise. The
option for advance payment is to be
indicated by the bidder in its bid as per
the format attached herewith as
Annexure–III and shall be deemed to
be part of the bidding scheduled
referred as SCHEDULED-21 to be
submitted by the bidder with
(ii) Interest rate applicable on
advance payment to the Contractor
shall be at the rate equal to one-year
MCLR rate [One-year Tenor rate p.a.]
published by State Bank of India
prevailing as on the date of drawl of
advance. The said interest rate shall
remain fixed and shall be applicable
till the advance amount is fully repaid.
The interest will be charged
considering proportionate adjustment
of advance against progressive
payment as per 47.1.2 below. The
interest shall be calculated on the
daily progressive balances
outstanding as on the date of
recovery/adjustment. It is the
Employer’s understanding that as per
extant provisions, GST is not payable
on interest paid on the amount of
Advance. The Contractor is, however,
advised to check the position from
their own sources. If payable even at
later stage, the same shall be to the
Contractor’s account and Employer
shall not reimburse any GST on this
Seal & Signature of Bidder
Recovery of this advance shall be
adjusted in such a way that that all the
sums of advance with interest thereon
shall be fully recovered 3 months prior
to the scheduled Time of Completion,
failing which the whole amount of
advance along with interest thereon
shall be recovered immediately from
the payments due to the Contractor.
The contractor may however, return /
pay to GETCO the unadjusted
advance amount at any stage during
the execution of the work along with
the accrued interest thereon till the
time of return / payment. Alternatively,
the contractor may also request
GETCO for early adjustment of the
advance along with accrued interest.
Further, the Contractor shall submit
the certificate of Tax Deduction at
Source (TDS) on interest within
months from the end of the quarter in
which adjustment of advance has
been made for claiming refund from
Employer. No claim for refund will be
entertained after end of the aforesaid
period of 3 months. Further, while
submitting the TDS Certificate the
details of Contract No, Project,
Region, Quarter etc to which the TDS
certificate pertains, shall also be
submitted tallying the amount with the
TDS Certificate.
In case, the Contractor opts not to
take interest bearing advance as
above, it would be mandatory for him
to submit the documents listed at Sl.
No. (i) (c) above within twenty-eight
(28) days of issuance of Letter/
Notification of Award.
Seal & Signature of Bidder
(i) 80% of supply value for each 47.1.2 Progressive Payments
consignment of Sub-Station material
including accessories on submission
(i) (a) 70% of supply value if contractor
of invoice along with 100% GST,
opts to take interest bearing initial
duties, F & I shall be paid from
corporate office within 30 days from
(b) 80% instead of 70% of supply value if
actual material receipt date
contractor opts not to take interest
mentioned in SR Note after verifying
bearing initial advance or has opted to
the following documents.
take interest bearing initial advance but
the advance payment has become
A. Tax invoice.
B. Delivery challan.
C. Endorsed RR / LR copy. each consignment of Sub-Station
D. Dispatch clearance certificate / material including accessories on
letter wherever applicable. submission of invoice along with
E. E Way Bill, if applicable 100% GST, duties, F & I shall be paid
from corporate office within 30 days
from actual material receipt date
mentioned in SR Note after verifying
the following documents.
A. Tax invoice.
B. Delivery challan.
C. Endorsed RR / LR copy.
D. Dispatch clearance certificate /
letter wherever applicable.
(ii) 10% payment out of balance 20% E. E Way Bill, if applicable
shall be released from corporate office
on completion of sub-station work, (ii) 10% of the of supply value shall be
handing over and preliminary paid pro-rata on completion of
acceptance certificate issued by the erection/ installation of substation
site engineers in charge after equipment, hardware, structures etc
rectification work if any and settlement and furnishing of completion
of material account according to certificate from Engineer-in-charge
actual quantity utilized for completion
and Chief Engineer (Projects), pro-
of S/S. Supply to be made as per
approved drawing/ BOQ. rata on monthly basis.
(iii) Balance 10% of supply value shall
(iii) Balance10% of supply value shall be paid on completion of on quarterly
be paid from corporate office on
basis on completion of erection/
successful commissioning of Sub-
Station against completion certificate installation of completed bay(s) in all
and only after settlement of material respects and liquidation of
account statement of items supplied, defects/deficiencies of corresponding
used, erected and successful bay on prorata basis and on
commissioning is settled for complete completion certificate from Engineer-
job and will be released only after in-charge and Chief Engineer
passing of final bill. (Projects) and submission of an
unconditional & irrevocable Bank
Guarantee for amount paid so that
Bank Guarantee available with the
GETCO is of cumulative value of
amount paid on this account, initially
valid till 3 months beyond the
scheduled date of completion of
testing & commissioning of the
substation and its taking over by the
GETCO and shall be extended from
Seal & Signature of Bidder
time to time till the actual date of
successful completion of testing &
commissioning of substation
complete in all respects and its taking
over by the GETCO, including
issuance of preliminary acceptance
certificate issued by the site
engineers in charge after rectification
work if any and settlement of material
account according to actual quantity
utilized for completion of S/S. Supply
to be made as per approved drawing/
(iv) Welfare Cess (iv) Welfare Cess
The modality of payment/ The modality of payment/
reimbursement of welfare cess will reimbursement of welfare cess will
be as under. be as under.
On receipt of A/T, the contractor / On receipt of A/T, the contractor /
bidder will get them registered under bidder will get them registered
Welfare Cess Act and submit the under Welfare Cess Act and submit
documentary evidence to the
the documentary evidence to the
concern office.
Before release of payment of first
concern office.
R.A.Bill, the contractor has to submit Before release of payment of first
the documentary evidence of R.A.Bill, the contractor has to
registration. Only thereafter, the bill submit the documentary evidence
will be processed for payment. of registration. Only thereafter, the
Before release of payment of bill will be processed for payment.
subsequent R.A.Bills, the Before release of payment of
contractor has to submit the subsequent R.A.Bills, the
documentary evidence of contractor has to submit the
payment of welfare cess of documentary evidence of payment
previous R.A.Bill. of welfare cess of previous R.A.Bill.
Before release of payment of Before release of payment of Final
Final Bill, the contractor has to Bill, the contractor has to submit the
submit the documentary documentary evidence of payment
evidence of payment of welfare of welfare cess of previous R.A.Bill
cess of previous R.A.Bill as well as well as the final bill.
as the final bill. If the R.A.Bill happens to be first
If the R.A.Bill happens to be first and final bill, then before release of
and final bill, then before release payment, contractor has to submit
of payment, contractor has to documentary evidence of
submit documentary evidence of registration under Welfare Cess Act
registration under Welfare Cess and evidence of payment of welfare
Act and evidence of payment of cess.
welfare cess. The welfare cess shall be
The welfare cess shall be reimbursed to the contractor on
reimbursed to the contractor on submission of copy of
submission of copy of documentary evidence of
documentary evidence of payment by observing due
payment by observing due formalities.
Seal & Signature of Bidder
47.2 For Erection works. 47.2 For Erection works.
Supply of Services Portion.
47.2.1 A. Interest Bearing Initial
Advance (Optional ^^) Ten percent
(10%) at the rate of interest as per
47.2.1 A.1 1st Installment of 05%
(Five) of the total Installation price
component shall be paid on
Establishment of Contractor’s site
offices for preparatory to mobilization
for Installation establishment and on
submission of the following:
(a) Proforma invoice,
(b) Advance Bank Guarantee for
[{110% (one hundred ten percent) of
the amount of Advance} Plus {amount
of GST reimbursable on Advance as
per the Proforma invoice}] from a
Public Sector Indian bank/Scheduled,
Commercial Bank in the form
attached herewith as Annexure-I
(The guarantee shall be initially valid
up to 90 days after the Time of
Completion and shall be reduced at
the end of every Quarter prorata to
the advance adjusted),
(c) Performance Securities in line with
GCC Clause 36.0 including its sub-
47.2.1. A.2 2nd Installment of 05%
(Five)^^ of the total Installation price
component shall be paid on start of
equipment erection & certification of
the same by Project Manager and on
submission of the following:
(a) Proforma invoice(s),
(b) Advance Bank Guarantee for
[{110% (one hundred ten percent) of
Seal & Signature of Bidder
the amount of Advance} Plus {amount
of GST reimbursable on Advance as
per the Proforma invoice}] from a
Public Sector Indian bank/Scheduled,
Commercial Bank in the form
attached herewith as Annexure-I
(The guarantee shall be initially valid
up to 90 days after the Time of
Completion and shall be reduced at
the end of every Quarter prorata to
the advance adjusted),
(c) Performance Securities in line with
GCC Clause 40.0 including its sub-
(d) A declaration by the Contractor
stating that 1st Installation (5%) of
advance has been utilized against the
mobilization works for the subject
Recovery of this advance shall be
adjusted in such a way that that all the
sums of advance with interest thereon
shall be fully recovered 3 months prior
to the scheduled Time of Completion,
failing which the whole amount of
advance along with interest thereon
shall be recovered immediately from
the payments due to the Contractor.
The contractor may however, return /
pay to GETCO the unadjusted
advance amount at any stage during
the execution of the work along with
the accrued interest thereon till the
time of return / payment. Alternatively,
the contractor may also request
GETCO for early adjustment of the
advance along with accrued interest.
Note: ^^ This payment is an optional
payment. The Contractor has the
option of taking the interest bearing
advance or otherwise. The option for
advance payment is to be indicated
Seal & Signature of Bidder
by the bidder in its bid as per the
format attached herewith as
Annexure–III and shall be deemed to
be part of the bidding scheduled
referred as SCHEDULE-21 to be
submitted by the bidder with
Note: After release of various
advances, the rate of recovery of the
advance shall be re-adjusted.
Provided further that the Proforma
Invoice(s) for advance payment along
with all supporting documents as per
para A.1 and A.2 above is submitted
by the Contractor to the Employer
within 3 months from the date of
fulfillment of the requisite activities. In
case the Contractor does not submit
the requisite documents including
applicable Bank Guarantee(s)/
Security(ies) within the aforesaid
period, the advance at A.1 & A.2
above shall not be payable.
The Contractor, shall, within 7 days
from the date of receipt of Advance,
furnish an Advance Receipt Voucher
to the Employer, as prescribed under
47.2.1 A.3. Interest rate applicable on
advance payment to the Contractor
shall be at the rate equal to one year
MCLR rate [One-year Tenor rate p.a.]
published by State Bank of India
prevailing as on the date of drawl of
advance. The said interest rate shall
remain fixed and shall be applicable
till the advance amount is fully repaid.
The interest will be charged
considering proportionate adjustment
of advance against progressive
payment for the work done as per
47.2.2 below. The interest shall be
calculated on the daily progressive
Seal & Signature of Bidder
balances outstanding as on the date
of recovery/adjustment. It is the
Employer’s understanding that as per
extant provisions, GST is not payable
on Interest paid on the amount of
Advance. The Contractor may,
however, advised to check the
position from their own sources. If
payable, the same shall be to the
Contractor’s account and Employer
shall not reimburse any GST on this
Further, the Contractor shall submit
the certificate of Tax Deduction at
Source (TDS) on interest within
months from the end of the quarter in
which adjustment of advance has
been made for claiming refund from
Employer. No claim for refund will be
entertained after end of the aforesaid
period of 3 months. Further, while
submitting the TDS Certificate the
details of Contract No, Project, etc to
which the TDS certificate pertains,
shall also be submitted tallying the
amount with the TDS Certificate.
In case, the Contractor opts not to
take interest bearing advance as
above, it would be mandatory for him
to submit the document listed at Sl.
No. A1 (c) and, A2(c) above within
twenty-eight (28) days of issuance of
Letter / Notification of Award.
47.2.2 (i) (a) 80% payment if
(i) 90% payment of amount claimed
covering various activities such as contractor opts to take interest
excavation, foundation, erection, bearing initial advance or
earthing, stringing of bus bar and (b) 90% payment instead of 80%
earthwire including insulator hoisting
payment if contractor opts not to take
works against R.A. bills duly certified
by EIC within 30 days from the date interest bearing initial advance or has
of R.A. bill. opted to take interest bearing initial
advance but the advance payment
has become inadmissible,
of amount claimed covering various
activities such as excavation,
foundation, erection, earthing,
Seal & Signature of Bidder
stringing of bus bar and earthwire
including insulator hoisting works
against R.A. bills duly certified by EIC
within 30 days from the date of R.A.
(ii) Balance 10% of erection value 47.2.2 (ii) Balance 10% of erection
shall be paid against commissioning value shall be paid against
of Sub-Station only after settlement commissioning of Sub-Station only
of material account statement of items after settlement of material account
supplied, used, erected and
successful commissioning of Sub- statement of items supplied, used,
Station line the same amount will be erected and successful
release in final bill only and payment commissioning of Sub-Station line the
will be made only after passing of final same amount will be release in final
bill only and payment will be made
only after passing of final bill.
(iii) If net payable amount is more (iii) If net payable amount is more than
than Rs 5.0 Lacs, payment will be Rs 5.0 Lacs, payment will be released
released from circle from circle office/corporate office.
office/corporate office.
(iv) Welfare Cess (iv) Welfare Cess
The modality of payment/ The modality of payment/
reimbursement of welfare cess reimbursement of welfare cess will
will be as under. be as under.
On receipt of A/T, the contractor / On receipt of A/T, the contractor /
bidder will get them registered bidder will get them registered under
under Welfare Cess Act and Welfare Cess Act and submit the
submit the documentary documentary evidence to the
evidence to the concern office. concern office.
Before release of payment of Before release of payment of first
first R.A.Bill, the contractor has to R.A.Bill, the contractor has to
submit the documentary submit the documentary evidence
evidence of registration. Only of registration. Only thereafter, the
thereafter, the bill will be bill will be processed for payment.
processed for payment. Before release of payment of
Before release of payment of subsequent R.A.Bills, the
subsequent R.A.Bills, the contractor has to submit the
contractor has to submit the documentary evidence of payment
documentary evidence of of welfare cess of previous R.A.Bill.
payment of welfare cess of Before release of payment of Final
previous R.A.Bill. Bill, the contractor has to submit the
Before release of payment of documentary evidence of payment
Final Bill, the contractor has to of welfare cess of previous R.A.Bill
submit the documentary as well as the final bill.
evidence of payment of welfare If the R.A.Bill happens to be first
cess of previous R.A.Bill as well and final bill, then before release of
as the final bill. payment, contractor has to submit
documentary evidence of
Seal & Signature of Bidder
If the R.A.Bill happens to be first registration under Welfare Cess Act
and final bill, then before release and evidence of payment of welfare
of payment, contractor has to cess.
submit documentary evidence of The welfare cess shall be
registration under Welfare Cess reimbursed to the contractor on
Act and evidence of payment of submission of copy of documentary
welfare cess. evidence of payment by observing
The welfare cess shall be due formalities.
reimbursed to the contractor on
submission of copy of
documentary evidence of
payment by observing due
3. Part –I 2.0 Tender Fee 2.0 Tender Fee
(SCC)/ The tender fee plus GST as The tender fee plus GST as
Special applicable specified in applicable specified in notice
Conditions notice inviting tender is inviting tender is payable by
of Contract/ payable by Demand Draft Demand Draft (DD) at
Clause 2.0 (DD) at Vadodara drawn on Vadodara drawn on any
any Scheduled Bank in Scheduled Bank in favour of
favour of Gujarat Energy Gujarat Energy Transmission
Transmission Corporation Corporation Ltd. The same will
Ltd. The same will be be furnished in Cover with
furnished in Cover-1 of Bid EMD (Bid Security).
along with EMD (Bid
Security). Payment of Tender Fees will
be accepted by RTGS /
NEFT/Online only.
4. Part –I 5.0 QUALIFYING REQUIREMENT
Special Qualifying Requirements for 66kV 630sqmm. Cable supply, Laying &
Conditions Erection EPC work
Clause 5.0 1.0 QUALIFICATION OF THE BIDDER
clauses Qualification of Bidder will be based on meeting the minimum pass/fail
criteria specified herein regarding the Bidder's Technical Experience
Requirements and Financial Position Requirements as demonstrated by
the Bidder's responses and supporting documents submitted with the Bid.
Technical experience and financial resources of any proposed
subcontractor shall not be taken into account in determining the Bidder's
compliance with the qualifying requirements. The bid can be submitted by
an individual firm or a Joint Venture/Consortium of not more than two (2)
firms, one of whom is designated as the Lead Partner. For the purpose of
the qualification the following shall also apply:
a. For the purpose of qualifying requirements, cumulative
supply/erection shall be calculated based on the certificate(s)
from the respective Transmission Utilities or major industries
b. "Rkm" denotes "Route kilometer".
Seal & Signature of Bidder
c. Satisfactory operation shall be substantiated by certificate(s)
issued by the end user/Employer certifying operation without
adverse remarks.
d. Relevant supporting documents (e.g., supply/erection
completion certificates, performance certificates) from the
original customer must be submitted.
e. No firm shall be associated, in any role, with more than one bid
for this package. The roles a firm may participate in bidding
under this QR are: (i) OEM Bidder under Route-1; (ii) Non-OEM
Bidder under Route-2;(iii) nominated OEM under Route-2; (iv)
OEM Partner of a Joint Venture/Consortium under Route-3; and
(v) Erection Partner of a Joint Venture/Consortium under Route-
3. A firm that has participated in any one of these roles in a bid
shall not participate in any role — the same role or a different
one — in any other bid for this package. Accordingly, without
limitation to the generality of the above, a firm that:
i. is the OEM Bidder under Route-1 in one bid, shall not
participate as the nominated OEM under Route-2, or
as the OEM Partner of a JV/Consortium under Route-3,
in another bid, or vice versa;
ii. is the Non-OEM Bidder under Route-2 in one bid, shall
not participate as the Erection Partner of a
JV/Consortium under Route-3, in another bid, or vice
iii. participates in any OEM-side role (as OEM Bidder,
nominated OEM, or OEM Partner) in one bid, shall not
participate in any non-OEM/erection-side role (as Non-
OEM Bidder or Erection Partner) in another bid, or vice
Any bid found in violation of this requirement shall be rejected, along with
every other bid in which the firm concerned has so participated.
1.1 TECHNICAL EXPERIENCE
1.1.1 Route-1: Original Equipment Manufacturer (OEM) Bidder
(I). The Bidder must be an Original Equipment Manufacturer (OEM) of
66kV or higher voltage class XLPE cables.
(II). The Bidder must have designed, manufactured, type tested (as per
relevant IS/IEC/ANSI standards with latest amendments), supplied and
erected at least:
(a) Supplied: Cumulatively supplied a minimum of 50 km length of
66kV or above voltage class XLPE cable during the last seven (7)
years preceding the date of NIT, to one or more Transmission
Utilities or major industries. Additionally, out of the aforesaid
cumulatively supplied length, the Bidder shall submit satisfactory
performance certificate(s) evidencing that a minimum of 10 km
length of 66kV or above voltage class XLPE cable has been in
Seal & Signature of Bidder
satisfactory service for a minimum period of two (2) years as on the
date of NIT, issued by the Transmission Utilities or major industries.
(b) Erected: Erected at least 20 Rkm route length cumulatively of 66kV
or above voltage class XLPE cables during last seven (7) years preceding
the date of NIT with a Transmission Utility or major industry. Out of which
at least one line should of minimum 2km route length. Subletting work
experience shall not be counted unless authenticated by order placing
authority (CE(P&C)/CE(Project)/CE(AM)).
(c) Performance: At least One (1) 66kV or above cable lines supplied and
erected as above shall be in satisfactory operation for not less than One
(1) year as on the date of NIT.
1.1.2 Route-2: Non-OEM Bidder
(I). Non-OEM Bidders are eligible, provided that the 66kV 630sq.mm.
cable is sourced from an OEM manufacturer that conforms to the technical
specifications and is an approved vendor of GETCO.
Provided further that the sourcing of 66kV 630sq.mm. cable under this
Route shall be carried out from a single OEM, who shall be an approved
vendor of GETCO, unless GETCO specifically agrees otherwise in writing.
Accordingly, the Bidder shall pre-identify and nominate such OEM, who
shall meet the qualifying requirements specified under Route-1 (I) and
(II)(a), and shall submit, along with its bid, all relevant supporting
documents establishing that the nominated OEM meets the aforesaid
requirements, including Type Test Reports, Supply Orders, and
Performance Certificates for the 66kV & above voltage cable supplied by
the nominated OEM. The Bidder shall, in addition, furnish jointly with the
nominated OEM a MOA/ MOU. It shall be the sole responsibility of the
Bidder to finalize and maintain the nominated OEM source without any
adverse impact on the delivery or completion schedule, and any delay or
consequential damages arising from the selection or sourcing of the OEM
shall be entirely borne by the Bidder. No change of the nominated OEM
shall be permitted after bid submission, unless specifically approved by
(II). The Non-OEM Bidder must:
(a) Procurement & Supply: Have procured and supplied a minimum of
km length cumulative of 66kV or above voltage class XLPE cables from
recognized cable manufacturers during the last seven (7) years as on the
date of NIT, to one or more Transmission Utilities or major industries.
(b) Erected: Have Erected at least 20Rkms route length of cumulatively
of 66kV or above voltage class XLPE cables during last seven (7) years
as on the date of NIT with one or more Transmission Utilities or major
industries. Out of which at least one line should of minimum 2km route
length. Subletting work experience shall not be counted unless
authenticated by order placing authority (CE(P&C)/CE(Project)/CE(AM)).
(c) Performance: At least One (1) 66kV or above cable lines supplied and
erected as above shall be in satisfactory operation for not less than One
(1) years as on the date of NIT.
Seal & Signature of Bidder
1.1.3 Route-3: Joint Venture (JV)/Consortium
Where a bidder does not individually meet the technical requirements as
specified under Route-1 or Route-2 above, submission/participation by a
Joint Venture/Consortium is permitted, provided the JV/Consortium
collectively meets all requirements specified below.
JOINT VENTURE / CONSORTIUM BIDS
(I). Bids may be submitted by a Joint Venture/Consortium of not more than
2(two) partners, one of whom must be an Original Equipment Manufacturer
(OEM) and the other a non-OEM erection firm.
(II) Provided that a duly executed Joint Venture/Consortium Agreement as
per Annexure-B (SCC) shall be submitted by all partners, which shall inter
alia contain provisions establishing that all partners of the JV/Consortium
shall be jointly and severally liable and responsible for the successful
performance of the Contract, including but not limited to completion within
the stipulated time, adherence to technical specifications, quality
standards, and fulfilment of all contractual obligations. The JV/Consortium
Agreement shall explicitly state that each partner assumes full
responsibility for the acts, omissions, defaults,and liabilities of the other
partner(s), and that GETCO shall be entitled to enforce the Contract
against any or all partners individually or collectively at its sole discretion,
failing which the bid from the JV/Consortium shall be deemed non-
responsive and non-compliant and shall be rejected. Further, and a Joint
Deed of Undertaking in favour of GETCO as per Annexure-C (SCC) jointly
signed by the partners of the JV shall also be submitted along with its bid.
Suitable Power of Attorney/Board Resolution authorizing the signatories on
behalf of each partner shall also be submitted along with the bid.
(III) The Joint Venture/Consortium shall collectively meet the complete
technical experience requirements as specified under Route-1 in respect
of manufacturing (including supply) and erection of 66kV or above voltage
class XLPE cables, with each Partner meeting the respective requirements
specified below.
(a) OEM Partner Requirements:
One partner of the JV/Consortium must be an Original Equipment
Manufacturer (OEM) with experience in design, manufacturing, and supply
of the required cables, and must meet the qualifying requirements as per
Route-1 (II) (a), as follows:
Supply Experience: Cumulatively designed, manufactured, type tested
and supplied a minimum of 50 km length of 66kV or above voltage class
XLPE cable during the last seven (7) years as on the date of NIT, to one or
more Transmission Utilities or major industries either directly or through
subcontractor. Additionally, out of the aforesaid cumulatively supplied
length, the OEM partner shall submit satisfactory performance certificate(s)
evidencing that a minimum of 10 km length of 66kV or above voltage class
Seal & Signature of Bidder
XLPE cable has been in satisfactory service for a minimum period of two
(2) years as on the date of NIT, issued by the Transmission Utility or major
(b) Erection Partner Requirements:
The other partner of the JV/Consortium must have experience in erection
of the required cable systems, as defined under Route-1 (II) (b), as follows:
Erection Experience: Erected at least 20Rkms route length of
cumulatively of 66kV or above voltage class XLPE cables during last seven
(7) years as on the date of NIT with one or more Transmission Utilities or
major industries. Out of which at least one line should of minimum 2km
route length. Subletting work experience shall not be counted unless
authenticated by order placing authority (CE(P&C)/CE(Project)/CE(AM)).
Performance: The collective performance requirement shall be
considered met if:
(a) at least one (1) cable line of 66kV or above voltage class,
manufactured and supplied by the OEM Partner, has been in
satisfactory operation for not less than one (1) year as on the date
(b) at least one (1) cable line of 66kV or above voltage class has been
erected by the Erection Partner, as per clause (III)(b) above, and
has been in satisfactory operation for not less than one (1) year as
on the date of NIT,
wherein, the cable line(s) referred to in (a) and (b) above may relate to the
same project, i.e., where the cable was manufactured and supplied by the
OEM Partner and erected by the Erection Partner, or to different projects,
with each partner independently executing its respective scope of supply
or erection in its own project.
(IV) Documentary Evidence:
The JV bidder and each JV Partner must provide comprehensive
documentary evidence in the bid demonstrating their respective qualifying
OEM Partner: Manufacturing credentials, supply certificates, and
performance certificates in support of the requirements specified in
clause (III)(a) and clause (IV)(a) above;
Erection Partner: Erection completion certificates and performance
certificates in support of the requirements specified in clause
(III)(b) and clause (IV)(b) above; and
Same-project evidence: Where the cable line(s) relied upon under
clause (IV) relate to the same project, documentary evidence
Seal & Signature of Bidder
establishing that the cable on that project was manufactured and
supplied by the OEM Partner and erected by the Erection Partner.
Note: To have clarity to all bidders participating through all above routes
i.e. Route-1, Route-2 & Route-3- “In the event of a Joint Venture (JV)
between the OEM and the Agency, the OEM shall be responsible for the
supply of cables, while the Agency shall be responsible for cable laying,
erection, installation, and related execution activities at site.”----Bidders
past experience will be considered accordingly.
2.0 FINANCIAL QUALIFYING CRITERIA: -
2.1 MAAT (Minimum Average Annual Turnover)
Route -1 & Route -2:- Bidder’s Minimum Average Annual Turnover
(MAAT) for best three years out of last five financial years shall not be less
than the 50% of estimated amount of tender.
Route -3 :- Minimum Average Annual Turnover (MAAT) of the consortium/
Joint Venture (JV) company added together for best three years out of last
five financial years shall not be less than the 50% of the estimated cost.
However Minimum Average Annual Turnover (MAAT) for best three years
out of last five financial years of the lead partner shall be at least 25% of
the estimated cost & for each other partners shall be at least 17% of the
estimated cost.
Note:- For the purpose of arriving at MAAT, Turnover shall be taken as
revenue from operation (excluding GST) as stated in Financial statement
of the bidder, but excluding other income.
2.2 Liquid Assets
Route -1 & Route -2 :- Last Financial Year Liquid Assets should not be
less than 20% of estimated cost of tender.
Route -3:- Last Financial year liquid asset of the consortium/ Joint Venture
(JV) company added together should not be less than 20% of estimated
cost of tender. However Last Financial Year Liquid assets of the lead
partner shall be at least 10% of estimated Cost of tender and for each other
partners shall be at least 7% of estimated cost of tender.
Note: For the purpose of arriving at Liquid Assets Current Assets Less
Inventories shall be considered.
Bidder’s Net worth for last Financial Year should be positive including all
Note: Net Worth means Paid-up Share Capital, Share Application Money
pending allotment and Reserves & Surplus less Accumulated Losses and
Seal & Signature of Bidder
Deferred revenue expenditure/Miscellaneous Expenses to the extent not
Reserves and Surplus to be considered for the purpose of net worth
shall be all reserves created out of the profits and securities
premium account but shall not include reserves created out of
revaluation of assets, write back of depreciation and amalgamation.
Share Application Money pending allotment will be considered only
if it is in respect of shares to be allotted.
Bidder to submit the following documents in support of meeting financial
qualifying criteria:
1. CA Certificate with valid UDIN Number failing which certificate shall
not be considered for the purpose of evaluation and Audited Balance
Sheet and Profit & Loss account along with the schedules referred
therein and the Auditor’s Report for the preceding five financial
years, in line with one of the following-
2. In case last financial year’s closing date was within 6 months prior
to bid due date and audited Balance Sheet and Profit & Loss
account of last financial year are not available, bidder has the option
to submit the financial details of five previous years immediately
prior to the last financial year. For example, in case bid due date is
up to 30th September and financial details of immediate preceding
financial years (year ending 31st March of same year) are not
available, the financial details of the five previous years immediately
prior to the last financial year may be submitted.
3. Otherwise it is compulsory to submit the financial details of
immediate preceding five financial years.
4. In case bidder is a holding company, the Financial Position criteria
referred to in Financial Qualification criteria shall be that of holding
company only (i.e. excluding its subsidiary / group companies). In
case bidder is a subsidiary of a holding company, the Financial
Position criteria referred to above shall be that of subsidiary
company only (i.e. excluding its holding company).
5. In case the date of constitution / incorporation of bidder is less than
five years old the MAAT in respect of the completed financial year
after the date of constitution shall be taken into account. Provided
further that the date of constitution / incorporation of the bidder shall
not be less than one year old and audited financial statements of at
least one completed financial year is available.
The evaluation of Financial Criteria shall be done on total
estimate cost of all packages i.e. ₹ 1,90,48,29,597.99.
Seal & Signature of Bidder
5. Part –I 6.0 Additional Documents: 6.0 Additional Documents:
Special Apart from various documents to Apart from various documents to be
Conditions be furnished along with the Bid as furnished along with the Bid as
of Contract/ required in the GCC and ECC, the required in the GCC and ECC, the
Clause 6.0 following documents/details are to following documents/details are to be
and its sub- be furnished by the Bidder: furnished by the Bidder:
clauses 1. GST Registration No. date/ 1. GST Registration No. date/
issuing authority. issuing authority.
2. Regn. No. under Shops & 2. Regn. No. under Shops & Estt.
Estt. Act/ issuing authority Act/ issuing authority
3. Details of Partners/Directors of 3. Details of Partners/Directors of
the Firm/Company. the Firm/Company.
4. Experience Record and 4. Experience Record and details of
orders pending / executed for
details of orders pending /
various utilities
executed for various utilities
5. Last five years Audited Accounts
5. Last five years Audited
6. Detail of Manufacturing
Accounts /Fabrication facilities if applicable
6. Detail of Manufacturing Factory Registration/license details
/Fabrication facilities if if applicable
7. Factory Registration/license
details if applicable
8. Solvency certificate from
Bank (up to 20 % of Bid value)
6. Part –I 41.0 PENALTY FOR DELAY: 41.0 LIQUIDATED DAMAGES (LD)
(SCC)/ FOR DELAY:
Conditions 41.1 The tenderer should note that 41.1 The tenderer should note that
of Contract/ the completion time allowed for the completion time allowed for
Clause 41.0 carrying out the work should be carrying out the work should be
and its sub- strictly observed. Any delay that
strictly observed. Any delay that may
clauses may take place in supply, erection
and civil beyond Contractual take place in achieving Completion of
period stated shall be subject to the works beyond Contractual Time of
the penalty at the rate of ½ % per Completion in the Contract shall be
week or part there of plus GST as subject to Liquidated Damages (LD),
applicable on delayed portion, with and not by way of penalty, at the rate
a ceiling of 10 % of the total of ½ % of the Contract Price plus GST
contract value plus GST as
as applicable, per week or part
applicable. For calculating the
delayed portion date of actual thereof of the delay subject to a
receipt of material at store shall be ceiling of 10% (ten percent) of the
considered. Contract Price plus GST as
41.2 The penalty plus GST as 41.2 The penalty plus GST as
applicable will be deducted from applicable will be deducted from bills
bills payable either against this payable either against this contract or
contract or from any Bank from any Bank Guarantee or any
Guarantee or any other amount other amount payable under any
payable under any other contract other contract with the GETCO.
with the GETCO.
Seal & Signature of Bidder
41.3 In event of failure of the 41.3 In cases where the Completion
Contractor to pay the amount of of the works/ along with supplies
Penalty as demanded, the Owner
extend beyond the contractual
shall be entitled to deduct the
amount of Penalty for delay from completion period, without prejudice
the amounts payable to the to any other right that it may have
Contractors under any bills under the Contract or in law, the
raised under this contract or any Owner shall be entitled to deduct
other amount payable under any the amount of LD from the amounts
other contract with the GUVNL payable to the Contractors under
and its Subsidiary companies
any bills raised under this Contract
i.e. GETCO, GUVNL, GSECL,
MGVCL, DGVCL, PGVCL, or any other amount payable under
UGCVL. It is permissible for the any other contract with the GUVNL
Owner to adjust the amount of and its Subsidiary companies i.e.
Penalty of delay against any Bank GETCO, GUVNL, GSECL, MGVCL,
Guarantee furnished by the DGVCL, PGVCL, UGCVL. It is
Contractor under this contract or permissible for the Owner to adjust
any other contract with GUVNL
the amount of LD against any Bank
and/or its subsidiary companies.
Guarantee furnished by the
Contractor under this contract or any
other contract with GUVNL and/or its
subsidiary companies.
41.4 Notwithstanding the provision of
Clause 10.2, if so requested by the
Contractor, amount from the RA bills,
pending settlement of Liquidated
Damages (LD), shall not be withheld/
retained by the Owner, if adequate
retention payment [over and above
security deposit/ Contract
Performance Guarantee (CPG)]
remains to be released as per
Contract. In case, it is not so, it shall
be examined by the Owner whether
BGs/other securities (excluding
CPG/Security Deposit) furnished by
the Contractor are available with
GETCO, which have partly or fully
served their purpose, and can
therefore be utilized by GETCO to
recover LD, if finally levied. If
available, it will be further checked
whether the contractor is willing to
furnish a suitable undertaking
authorizing GETCO to retain those
BGs/security (for such value which
Seal & Signature of Bidder
along with retention payments
remaining with GETCO is considered
to be sufficient to take care of
maximum leviable LD) to be kept valid
till 6 months beyond the anticipated
completion of the works/ supplies
under the Contract. If the Contractor
requests and gives the undertaking as
above and validity of BG is suitably
extended wherever required, amount
from RA bills, pending settlement of
LD, shall not be withheld/ retained on
Seal & Signature of Bidder
BANK GUARANTEE FORM FOR ADVANCE PAYMENT
(For the purpose of verification/confirmation of this Bank Guarantee by the GETCO, the
Bank shall indicate 2 official email ids of the authorized signatories from Issuing Branch
and also of the designated higher office (Corporate Office, Zonal Office etc) in the
covering letter of the Bank forwarding the Bank Guarantee.)
Bank Guarantee No. …………………… Date...................
…………..[Name of Contract]…………………….
To: [Name and address of the Employer/ Owner]
Dear Ladies and/or Gentlemen,
We refer to the Contract ("the Contract") vide Letter of Award issued on ............ (insert date of
the letter of award)….by you (the Employer/ Owner) to M/s ................. (Name of Contractor)
signed on ..............(insert date of the Contract)…..... between you and M/s ................. (Name of
Contractor) ..................,
having its Principal place of business at ………....(Address of Contractor) ...............................
and Registered Office at ………....(Registered address of Contractor)
…….................….. (Indicate brief scope of work) ............................... for the complete execution
of the …… (insert name of Package along with name of the Project)……..
Whereas, in accordance with the terms of the said Contract, the Employer has agreed to pay or
cause to be paid to the Contractor an interest bearing Advance Payment against furnishing of
an irrevocable bank guarantee for an amount of ………………………..(Amount in figures and
words) ……………which is equal to [{110% (one hundred ten percent) of the amount of
Advance} Plus {amount of GST reimbursable on Advance as per the Proforma invoice, if
By this letter we, the undersigned, ………(insert name & address of the issuing bank) ………, a
Bank (which expression shall include its successors, administrators, executors and assigns)
organized under the laws of .................................... and having its Registered/Head Office at
…..…….(insert address of registered office of the bank)……..... do hereby irrevocably guarantee
repayment of ………….(Amount of the bank guarantee in figures and words)…………… upon
the first demand of the Employer without cavil or argument in the event that the Contractor fails
to commence or fulfill its obligations under the terms of the said Contract for reasons
Provided always that the Bank's obligation shall be limited to the amount of this Bank guarantee
or an amount equal to the outstanding balance of the Advance Payment and the accrued interest
on the Advance Payment, taking into account such amounts, which have been repaid by the
Seal & Signature of Bidder
Contractor from time to time in accordance with the terms of payment of the said Contract, as
certified by you.
This Guarantee shall remain in full force from the date upon which the said Advance Payment
is received by the Contractor up to ninety (90) days beyond the date on which the entire Advance
Payment along with the accrued interest if any due thereon has been fully adjusted in terms of
the Contract i.e., up to ninety (90) days beyond the date of Completion of the Facilities under
the Contract. This Guarantee may be extended from time to time, as may be desired by M/s.
……………………….. on whose behalf this Guarantee has been issued.
Any claims to be made under this Guarantee must be received by the Bank during its period of
validity, i.e. upto ninety (90) days beyond the date of Completion of the Facilities by the Employer
i.e. upto and inclusive of ……………. (dd/mm/yy).
Notwithstanding anything contained herein:
1. Our liability under this Bank Guarantee shall not exceed _________ (value in
2. This Bank Guarantee shall be valid upto ________(validity date)__________.
3. We are liable to pay the guaranteed amount or any part thereof under this Bank
Guarantee only & only if we receive a written claim or demand on or before ________
(validity date) __________.
For and on behalf of the Bank
[Signature of the authorised signatory(ies)]
Designation_______________________
Contact Number(s): Tel.______________Mobile______________
Common Seal of the Bank______________________
Contact Number(s): Tel.______________Mobile______________
Seal & Signature of Bidder
1. For the purpose of executing the Bank Guarantee, the non-judicial stamp papers of
appropriate value shall be purchased in the name of Bank who issues the ‘Bank
2. The Bank Guarantee shall be signed on all the pages by the Bank Authorities indicating
their POA nos. and should invariably be witnessed.
3. The Bank Guarantee should be in accordance with the proforma as provided.
However, in case the issuing bank insists for additional paragraph regarding
applicability of ICC publication No: 758, the following may be added at the end of the
proforma of the Bank Guarantee [i.e., end paragraph of the Bank Guarantee
preceding the signature(s) of the issuing authority(ies) of the Bank Guarantee]:
“This Guarantee is subject to Uniform Rules for Demand Guarantee, ICC
publication No. 758 except that article 15(a) is hereby excluded.”
Seal & Signature of Bidder
Sub: Supply, Laying, Erection, Testing and Commissioning of 66kV 1Cx630 sqmm
XLPE cable with Poly AL-Poly / Aluminum Corrugated constriction on EPC basis
for various lines in Amreli Circle Package-1, Gondal Circle Package-2 and
Junagadh Circle Package-3 in Rajkot Zone.
Tender no: ACE(P&C)/Contract/E-511/66kV UG cable line/EPC
Note: Being an EPC package, multiple activities are involved starting from engineering
to commissioning of project. Agency will submit L2 schedule by identifying actual risk
involved within project with prioritization, assessment and mitigation plan and submit to
GETCO. Hence it is proposed to continue submission of L2 schedule by agency to
GETCO during Kick off meeting.
Seal & Signature of Bidder
Specification No: ACE(P&C)/Contract/E-511/66kV UG cable line/EPC
Sub: Supply, Laying, Erection, Testing and Commissioning of 66kV 1Cx630 sqmm XLPE
cable with Poly AL-Poly / Aluminum Corrugated constriction on EPC basis for various
lines in Amreli Circle Package-1, Gondal Circle Package-2 and Junagadh Circle Package-
3 in Rajkot Zone.
Option for Initial Advance (either Interest Bearing Initial Advance of No Initial Advance or No
Initial Advance).
Additional Chief Engineer (Procurement & Contracts)
Gujarat Energy Transmission Co. Ltd.,
Corporate office,
I. We have read the provision in the Bidding Documents regarding furnishing the option for
advance payment. Accordingly, as per clause GCC 47.1.1 (For Supply) and GCC 47.2.1 (b)
(For Erection) provided in Amendment-I of the Bidding Documents, we hereby confirm to opt
Interest Bearing Initial Advance:
Supply Portion: (Ref GCC 47.1.1) *
Erection Portion: (Ref GCC 47.2.1 (b)) *
* ‘Yes’ or ‘No’ to be filled up by the Bidder. ‘Yes” shall mean that Bidder has opted for the Interest
Bearing Advance and ‘No’ shall mean that Bidder has not opted for the Interest Bearing Advance.
If nothing is mentioned, it shall mean that Bidder has not opted for the Interest Bearing Advance.
(Name of Authorized Signatory of Bidder)
Seal & Signature of Bidder
Tender No: ACE(P&C)/Contract/E-511/66kV UG cable line/EPC
Sub: “Supply, Laying, Erection, Testing and Commissioning of 66kV 1Cx630
sqmm XLPE cable with Poly AL-Poly / Aluminum Corrugated constriction on EPC
basis for various lines in Amreli Circle Package-1, Gondal Circle Package-2 and
Junagadh Circle Package-3 in Rajkot Zone.”.
In connection with above subject, I / we confirm that our firm is not declared in NCLT
under Insolvency & Bankruptcy Code. Further, I / we also agree that, if any found NCLT
under Insolvency & Bankruptcy Code, the offer shall be out rightly rejected without
assigning any reason thereof.
Signature of Authorized
Representative of Company/Agency
Name of bidder Company
Seal & Signature of Bidder
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
EMD BG Format.pdf
1. 66 kv MOC 3 plus1 29.10.2025 R4.pdf
02_TOWER MATERIAL-66KV LINE-PANTHER.pdf
2 66KV MOC 6 plus1 DT. 29.10.25 R3.pdf
3 66KV MOC 2 plus1 DT. 29.10.25 R2.pdf
4 66KV MOC 2x6 plus 0 DT. 29.10.25 R2.pdf
66 KV LA R6 June 22.pdf
66KV 630 SQ MM - ALU CORRU R5.pdf
66KV 630 SQ MM 1C POLY AL POLY-R4.pdf
66KV CABLE TRENCH APPROVED DRG 10.04.19.pdf
G.I. EARTHING STRIPS.PDF
MOC 66 kV cable 13.01.22 CE(Project) letter.pdf
Notes for FOAC laying .pdf
Standard MQP GI Tower material.PDF
TS LAYING CABLE 66KV R2 new - Final.pdf
48F FODP Ref Drg-1.pdf
48F FODP Ref Drg-2pdf.pdf
End to End Test Final.pdf
Joint Box FOAC- OPGW Ref Drg-2.pdf
Joint Box FOAC- OPGW Ref Drg-1.PDF
Joint Box FOAC-FOAC Ref Drg.pdf
OFC UG cable Manhole chamber.pdf
10.1_ Joint Venture Agreement redrafted.pdf
Revised Joint Deed of Undertaking.pdf
Form of LD undertaking 1A.pdf
Form of LD undertaking 1B.pdf
11_Public Proc Circular of GOI.pdf
13_Letter for CBuD.pdf
Part-I 4 EMD BG Format.pdf
Part-I 5 SD cum PBG Format.pdf
16_Safety_regulation_for_TL.pdf
28_STD FQP TR LINE JUNE-2014.pdf
5. SD cum PBG Format.pdf
Part-I 1 Tender Notice EPC UG Rajkot Zone.pdf
Part-I 3 Amendment-I Tender speci E-511 Rajkot Zone.pdf
BOQ Amreli Circle Package-1 E-511.pdf
BOQ Gondal Circle Package-2 E-511.pdf
BOQ Junagadh Circle Package-3 E-511.pdf
Part-I 2 Tender Specifi. EPC UG Rajkot Zone E-511.pdf
Corrigendum No.1 E-511 Date Extension and Pre-Bid Queries.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .