Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹18.2 L
EMD Value
₹1.8 L
Closing Date
30 Nov 2026, 5:00 pm3d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Dy. Director (Construction)
Mandi Parishad Aligarh
Repaire of Link Road From Etah Sidhpura Road to Shyampur
2026_RKUMP_1211153_1
791-7/19.11.2026
Open Tender
Civil Works - Roads
Percentage
150 days
Ganjdundwara
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,200
Dy. Director (Const.) Mandi Parishad
₹1.8 L
Yes
23 Nov 2026
23 Nov 2026
1 Dec 2026
23 Nov 2026
30 Nov 2026
23 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in cutting of in embakment in ordinary soil excavation to be in the form of a regular pits not exceeding 0.50 m in depth and earth work in embankment to be in 20cm layers including ramming and dressing the surface to required levels and slops and also including 1.5m lift and 30m lead, the earth in form of cutting (b) to be used as spoil banks within 30m distance as directed by the Engineer-in-charge Including royality. SI No. | 512.4 | M3 | 140 | ₹71,736 |
| 2 | Water Bound Macadam with crushable Screening Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregates, watering and compacting to the required density grading 3 as per Technical Clause 405(4.8-3) | 54.9 | SQM | 4,481 | ₹2,46,006.9 |
| 3 | Providing and applying Tack coat with bitumen VG-10 at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 3,660 | SQM | 26.6 | ₹97,356 |
| 4 | 20 mm thick Open-Graded Premix Carpet using Bituminous Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type-C as per Technical Specification Clause 508 | 3,660 | SQM | 228.4 | ₹8,35,944 |
| 5 | Providing and laying seal coat sealing the voids in a bitumenious surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 513 | 3,660 | SQM | 85.3 | ₹3,12,198 |
| 6 | Providing & fixing Typical informatory sign board asper MORD specification and drawing. Three M.S. plate of 1.6 mm thick, top and middle plate duty welded with M.S. flat iron 25mm x 5 mm size on back on edges. The lower plate will be welded with M.S angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of lower most plate and flat iron frame of middle plate will be welded to 2 Nos. 75mm x 75mm of 12 SWG sheet tubes post duly embedded in cement conc. M-15 grade black of 450mm x 450mm x 600mm below ground level. All M.S. will be stove enametat on both sides. Lettering and Printing arrows, border etc.will be painted with ready mixed sign thick enamd paints of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paints as per drawing clause 1701 and annexure 1700. | 1 | NO | 15,000 | ₹15,000 |
| 7 | Maintainance of First Year (@0.00% of Total Work Amount | 15,78,240.9 | Job | - | - |
| 8 | Maintainance of Second Year(@ 1.50% of Total Work Amount | 15,78,240.9 | Job | 0.02 | ₹23,673.61 |
| 9 | Maintainance of Third Year(@3.00% of Total Work Amount | 15,78,240.9 | Job | 0.03 | ₹47,347.23 |
| 10 | Maintainance of Fourth Year (@4.50% of Total Work Amount | 15,78,240.9 | Job | 0.05 | ₹71,020.84 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.98 MB
BOQ_2301617.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .