Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 CrAdmitted-Finance COAL ROAD PTPS PATRATU | ₹5.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.2 Cr+₹23.1 L (4.62%)Admitted-Finance | ₹5.2 Cr+₹23.1 L (4.62%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical II 158 NTPC TTS KAHALGAON BHAGALPUR BIHAR 813214 | BHAGALPUR | BIHAR | 813214 | - | - | Rejected-Technical QR NOT QUALIFIED |
Tender Value
Refer Docs
EMD Value
₹5 L
Closing Date
21 Jan 2020, 4:00 pmClosed
DGM CnM
Barh Thermal Power Plant P.O. BARH BARH 803213 EDC BUILDING
Biennial Maintenance Contract for Stage II Units ,2x250 MW of TMD, BMD,OFS areas excluding major overhauls
2020_NTPC_29059_1
NTPC/SSC - ER-I(Barh)/9900191805
Open Tender
Serv - Others
Service
730 days
NTPC BARAUNI
As per tender documents
4 documents required · 4 mandatory
₹2,250
Yes
NTPC Limited
₹5 L
Yes
3 Apr 2020
7 Jan 2020
23 Jan 2020
7 Jan 2020
21 Jan 2020
7 Jan 2020
7 Jan 2020 - 13 Jan 2020
Amount
BMC BMD and Aux stg II U 8,9
BOILER (<>) INSPECTION
Blr PP Weld JTS (<>) WELDING
BOILER (FINS) WELDING
BOILER (<>) Testing
SCAFFOLDING (<>) Erection
MATL (SKY CLIMBER) Instal/Remove
BOILER (SEGMNT SHIELD) Repl
BOILER (CASSET BAFFLE) Repl
Eco (COILS) Remove & Apply
BOILER (PASS-2) Cleaning
BOILER (PEEP/MANHOLE) Serv
Wall Blower(<>)-Attend Defect
Burner Tilt (<>) Serv
SADC Dampers(<>)-Serv
PF Burner (<=250MW#) HARDFACING
PF Burner (<=250MW#) RECLAMATION
MATL (STEEL) Fabrication
Blr PP Weld JTS (<>) STRESS RELEIVING
HP Valves (100NB) OH
HP Valves (50NB) OH
HP Valves (50NB) Repl
Safety Valve (<>) OH
MATL (SCRAP) DISPOSAL
Chem Dosing Pump(<>)-OH
BOILER (TUBE BENDS) Fabrication
FUEL HNDG PP <> OH
OIL GUN (<>) 04W Chks
OIL GUN (<>) Cleaning
Pad Insulation (<>) Instal/Remove
BOILER (REFRACTORY) Remove & Apply
MATL (AL SHEET) CLADDING
SCAFFOLDING (<>) Instal/Remove
Grav Coal Fdr (FEEDER BELT) Repl
Grav Coal Fdr(<>)-OH
Grav Coal Fdr (<>) Serv
Grav Coal Fdr (HD PULLY/CENTER) Repair
Grav Coal Fdr (COC) REFURBISHING
Grav Coal Fdr (COC GEAR BOX) OH
Grav Coal Fdr (TECHOGENERATOR) Repl
Misc Works (<>) Fabrication
Misc Works (<>) WELDING
Pulv Fuel Pipe/Bend(<>)-Repl
HANGER (<>) Repl
Duct(<>)-Repair
Tube Mills(<>)-OH
Tube Mills (COUNTER PENION) OH
Tube Mills (GIRTH GEAR) Serv
Tube Mills (MAIN BRG) Serv
Tube Mills (GEAR BOX) Repl
Tube Mills (LUB SYSTEM) Serv
Tube Mills (BALL) CHARGING
Tube Mills (GEAR BOX) Serv
Tube Mills (DRIVE CPLG) Instal/Remove
Tube Mills (SCREW CONV) OH
Tube Mills (<>) Choking Removal
Tube Mills (GIRTH GEAR) Cleaning
Misc Works (<>) Attend Defect
Radial ID Fan (>210MW#) Repl
Axial FD Fan(>210MW#)-OH
Axial FD Fan (BLD BRG ASSY) Serv
Axial FD Fan (SERVOMOTOR ASSY) Serv
Axial FD Fan (BRG) Serv
Radial ID Fan (IGV) ATTEND BREAKDOWN
Lub Oil System (<>) 04W Chks
Lub Oil System (<>) REPAIRING
Seal Air Fan (SHAFT) RPL-BRG
Seal Air Fan (<>) 04W Chks
Scanner Fan (<>) 04W Chks
Duct Damper/Gate(<>)-Serv
Duct(<>)-Cleaning
Trisector APH(<>)-OH
Trisector APH (AIRMOTOR) Serv
APH F.Cplg/G.Box) (<>) INSPECTION
APH F.Cplg/G.Box)(<>)-Repl
Trisector APH (<>) RPL-BRG
APH S/Blower(<>)-Serv
COUPLING (<>) Decpl/Cpl/Algn
Lub Oil Cooler (<>) Cleaning
ESP/Area (200/210MW) 04W Chks
ESP/Area (GEAR BOX) Serv
ESP/Area (INSULAOR) Repl
ESP/Area (200/210MW) Checking
DEPTT <> MAN.DEP-SW
DEPTT <> MAN.DEP-USW
BMC TMD,OFS and Aux stg II U8,9
BFP BP (>210-500MW#) 08W CHKS
CEP (>210-500MW#) 06W CHKS
CT Fan (<>) 08W CHKS
CW PUMP (<>) 12W Chks
COMP AIR SYS (<>) 08W CHKS
CENTRIFUGE (<>) 04W Chks
EOT/Cranes (>90MT) 12W Chks
H2 DRIER (<>) 08W CHKS
AC Sys Cooling Tower (<>) 12W Chks
MOT (>210-500MW#) 04W Chks
Air Drying Unit (ACTIVATED ALUMINA) 08W
LP WATER PUMP (<>) 06W CHKS
MISC WORKS (<>) 08W CHKS
HP WATER PUMP (>15KW) Attend Defect
HP WATER PUMP (>15KW) ATTEND BREAKDOWN
HP Water Pump (<>) Attend Defect
Submersible Pumps (<>) OH
LP Water Pump (<>) OH
AC Sys Comp (<>) OH
CENTRIFUGE (<>) OH
CT Fan(<>)-Attend Defect
COOLING TOWER >200MW# ATTEND BREAKDOWN
COOLING TOWER >200MW# Repair
COOLING TOWER (<>) Attend Defect
STEAM TUR (<>) ATTEND BREAKDOWN
Screw Comp (<=10NM3) Attend Defect
STEAM TUR (>210-500MW) Attend Defect
STEAM TUR (>210-500MW) REPAIR
STEAM TUR (<>) Attend Defect
Bends/Laterals (<>) Repl
Bends/Laterals (<>) ATTEND BREAKDOWN
LP Valves (100NB) Attend Defect
LP Valves(Dia>6"-12")-Attend Defect
LP Valves(Dia<=6")-Attend Defect
FLANGE (<>) ATTEND BREAKDOWN
MSRL PIPE (<>) Attend Defect
Mild Steel Piping (Dia>6"-12") Attend De
CONDENSER (VAC P/P) OH
CONDENSER (VAC P/P) 08W CHKS
CONDENSER (COLTCS) CHARGING
Misc Works (<>) Attend Defect
STEAM PIPING (<>) WELDING
CEP (>210-500MW#) SERVICING
Misc Works (<>) Painting
Misc Works (<>) Letter Writing
Misc Works (<>) MANPOWER GANG(ADL)
HP Valves(Dia>6"-12")-Attend Defect
BFV (SEAL) Repl
HP HEATER (<>) Attend Tube Lkg
LP Heater (<>) Attend Tube Lkg
BROTHERSENGINEERING AND ERECTORS LIMITED
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .