| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 CrAdmitted-Finance | -28.20% | ₹1.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.0 Cr+₹4.1 L (2.14%)Admitted-Finance AT KALIDASPUR PO BALIMED PS NAIKANIDIHI DIST BHADRAK PIN 756131 | BHADRAK | ODISHA | 756131 | -26.66% | ₹2.0 Cr+₹4.1 L (2.14%) | L2 | Admitted-Finance |
| 3 | L3₹2.0 Cr+₹11.8 L (6.17%)Admitted-Finance DHARMAPADA DAS B CLASS DIPLOMA ENGG CONTRACTOR | MALKANGIRI | ODISHA | 764044 | -23.77% | ₹2.0 Cr+₹11.8 L (6.17%) | L3 | Admitted-Finance |
| 4 | L4₹2.1 Cr+₹16.5 L (8.65%)Admitted-Finance FLAT NO 100 USTAV ENCALVE WARD NO 08 P O SAILASHREE VIHAR BLOCK ULB BHUBANESWAR MC P S CHANDRASEKHARPUR DIST KHURDHA 752066 ODISHA | BHUBANESWAR | KHURDHA | ODISHA | 752066 | -21.99% | ₹2.1 Cr+₹16.5 L (8.65%) | L4 | Admitted-Finance |
| 5 | L5₹2.1 Cr+₹20.5 L (10.7%)Admitted-Finance AT BELTIKIRI SADAR DHENKANAL | -20.50% | ₹2.1 Cr+₹20.5 L (10.7%) | L5 | Admitted-Finance |
Tender Value
₹2.7 Cr
EMD Value
₹2.7 L
Closing Date
12 Aug 2026, 5:00 pmClosed
Chief Construction Engineer,KIP,Basudevpur
O/o the CCE. KIP, Basudevpur
Construction of Missing Link i.e. Direct outlets of Kanupur Main Canal within RD 38610m to RD 78210m of Kanupur Irrigation project
2026_KPRIP_137252_2
CCE,KIP(KCD-II)-06/2026-27
National Competitive Bid
Civil Works - Canal
Percentage
180 days
Kanupur Canal Division-II, Rimuli
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹2.7 L
Yes
10 Sept 2026
29 Jul 2026
13 Aug 2026
29 Jul 2026
12 Aug 2026
29 Jul 2026
29 Jul 2026 - 12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in all kinds of soil in canal bed, slope including stoney earth gravel, moorum etc. inter-spread with boulders up to 1/2 cum in volume by mechanical means including loading, unloading and carriage with all leads, lifts / delifts etc. and laying in dumping yards or in spoil banks in 22.5 cm layers (to make the fill ready for watering and compaction) including trimming the slopes and bed as per approved design as directed by the Engineer-in-charge | 0.2 | Cum | 81.9 | ₹16.38 |
| 2 | Excavation of foundation of structures by manual/ mechanical means in all kinds of soil ( This shall include ordinary soil, sand, silt, slushy soil, hard soil, gravelly soil, stoney earth mixed with gravels, pebbles, stone boulder not exceeding 0.014cum by volume, moorum, etc.) in both wet and dry condition, including cost of dewatering of foundation, coffer dam, dressing, levelling the foundation bed and sides as per drawing and specification, all leads, lifts, de-lifts etc, depositing the useful approved excavated earth in the canal embankments in filling section in layers not exceeding 22.5cm. in depth, breaking clods to maximum 5cm to 7cm size and depositing the un-useful surplus materials in spoil banks or on any other specified space with proper section as directed, by manual/mechanical means, with cost of all leads, lifts, de-lifts, loading and unloading, handling and re-handling, with all cost for site illumination, mobilisation, demobilisation, diversion road, , royalties,cess, T&P etc. complete, with all cost incidental to the work as per the specification and direction of the Engineer-in-charge. | 0.4 | Cum | 81.9 | ₹32.68 |
| 3 | Excavation of foundation of structures by manual/ mechanical means in DI rock, laterite rock and soft rock not requiring blasting, removable by pick-axe and crow bars, in both wet and dry condition including cost of all incidental charges etc., depositing the excavated materials either in spoil bank or in any other specified space,as directed, by manual/ mechanical means, all leads, lifts, de-lifts etc., dewatering with all cost and running charges of pumps and accessories, coffer dams, dressing and levelling the bed and sides, with all cost for site illumination, mobilisation, demobilisation,royalties,cess, and T&P etc. complete as per the specification and direction of the Engineer-in-charge. | 0.4 | Cum | 104.8 | ₹41.82 |
| 4 | Filling foundation and plinth with selected excavated materials by mechanical/ manual means and lying in layers, duly compacted, including watering, ramming, with all leads, lifts, de-lifts including all cost incidental to the work etc. complete as per the direction of the Engineer-in-charge. | 0.6 | Cum | 173.06 | ₹103.66 |
| 5 | Providing and laying Cement concrete M-15 grade with 40mm and downgraded crusher broken hard granite aggregates, sharp sand of approved grading and quality confirming to the specification, mixing by concrete mixer, laying manually in approved surface, with cost of all materials, leads, lifts, de-lifts, vibrating concrete by mechanical means, supplying T&P, curing for specified days by suitable means, supervision charges, construction and dismantling of gangways, scaffoldings and chute, conveyance, royalty and, labour,cess, diversion road, site illumination, mobilisation, demobilisation, including dewatering with all cost and running charges of pumps, all accessories and hire and running charges of machineries required for the work as per approved drawings and specifications, with all cost incidental to the work, etc. complete as per the direction of the Engineer-in-charge. | 0.2 | Cum | 5,881.1 | ₹1,170.34 |
| 6 | Providing and laying Cement Concreteconfirming to M-20 grade in approved surface with 20mm and downgraded crusher broken hard granite aggregates, sharp sand of approved grading and quality confirming to the specification, mixing by concrete mixer, with cost of all materials, all leads, lifts , de-lifts, vibrating concrete by mechanical means, supplying T&P, curing for specified days by suitable means, supervision charges, construction and dismantling of gangways, scaffoldings and chute, conveyance, royalty but excluding the cost of steel reinforcement, including cost of labour,cess, diversion road, site illumination, mobilisation, demobilisation, dewatering with all cost and running charges of pumps, accessories and hire and running charges of all machineries required for the work as per approved drawings and specifications, with all cost incidental to the work, etc. complete as per the direction of the Engineer-in-charge. | 1 | Cum | 6,650.1 | ₹6,643.45 |
| 7 | Providing and laying Reinforced Cement Concrete confirming to M-25 grade in approved surface with 20mm and downgraded crusher broken hard granite aggregates, sharp sand of approved grading and quality confirming to the specification, mixing by concrete mixer, with cost of all materials, all leads, lifts , de-lifts, vibrating concrete by mechanical means, supplying T&P, curing for specified days by suitable means, supervision charges, construction and dismantling of gangways, scaffoldings and chute, conveyance, royalty but excluding the cost of steel reinforcement, including cost of labour,cess, diversion road, site illumination, mobilisation, demobilisation, dewatering with all cost and running charges of pumps, accessories and hire and running charges of all machineries required for the work as per approved drawings and specifications, with all cost incidental to the work, etc. complete as per the direction of the Engineer-in-charge. | 1 | Cum | 7,062 | ₹7,054.94 |
| 8 | Providing form work for concrete in canal structures with F1 finish using steel shutter plates of approved specification for all surfaces including supply of shutter plates and all other materials, T & P, labour and transportation of shuttering materials by mechanical/ manual means and dismantling of forms and finishing the surface complete with cost of all materials, all leads, lifts, de-lifts, diversion road, site illumination, mobilisation, demobilisation, royalties, cess etc. including all cost incidental to the work etc. complete as per the direction of Engineer-in-charge. | 1 | Sqm | 953.7 | ₹952.75 |
| 9 | Providing and laying, straightening the coiled or bent up MS/HYSD bars (SAIL/TATA/ZINDAL/SHYAM/ RUNGTA STEEL), cutting, bending, and placing the grills in position with ties, chairs, spacers and binding the grills in position with binding wires 18 to 20 gauge, lapping and splicing, welding the joints wherever necessary for RCC works, as per approved designs and drawings and technical specification, with cost of all materials, all leads, lifts, de-lifts, carriage, royalty and labour, cess etc. with cost of diversion roads, site illumination, mobilisation, demobilisation, etc. complete with all cost incidental to the work as per the direction of the Engineer-in-charge. ( Weight of binding wire shall not be considered for payment in any shape at all) | 1 | Qntl. | 9,584.7 | ₹9,575.12 |
| 10 | Providing weep holes along with filters in masonry/concrete abutments, wing wall/return wall with 100mm dia AC pipe extending through the fullwidth of the structure with slope of IV:20H towards drawing face complete and providing metal spall backing in the rear of weep holes with all leads, lifts and delifts including cost, carriage, royalty , labour,cess etc. complete as per drawing, specification and direction of Engineer-in-Charge. | - | Rmt | 244.2 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
DTCN.pdf
Tender Documents • 6.68 MB
BOQ_603594.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .