Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.0 LAccepted-AOC VILLAGE SAIKLI PO DEOTH TEHSIL SADAR DISTRICT BILASPUR H P | BILASPUR | HIMACHAL PRADESH | 174001 | 1 | Accepted-AOC L1 | |
| 2 | 2₹6.4 L+₹40,401 (6.74%)Rejected-Finance R O V P O DHALOH TEHSIL GHUMARWIN DISTT BILASPUR H P | BILASPUR | HIMACHAL PRADESH | 174001 | 2 | Rejected-Finance 2 | |
| 3 | 3₹6.7 L+₹67,567 (11.3%)Rejected-Finance BILASPUR | BILASPUR | CHHATTISGARH | 495001 | 3 | Rejected-Finance 3 | |
| 4 | 4₹6.8 L+₹79,900 (13.3%)Rejected-Finance | 4 | Rejected-Finance 4 |
Tender Value
₹7.5 L
EMD Value
₹14,920
Closing Date
14 Nov 2023, 11:00 amClosed
Executive Engineer
Jal Shakti Division Bilaspur
AR and MO LWSS Kallar Chharol in Tehsil Sadar District Bilaspur (SH Outsourcing of scheme for operation of pumping machinery distribution system of water supply for sector storage tank to different habitation for one year).
2023_HPIPH_81038_1
BLP-BLP-00736 NIT No. 20747-847 dated 01/11/2023
Open Tender
Civil Works
Item Rate
365 days
Sub Division Jukhala Section Jamli
Please refer Tender documents.
7 documents required · 7 mandatory
₹250
EE JSV Bilaspur
₹14,920
Yes
15 Dec 2023
4 Nov 2023
14 Nov 2023
4 Nov 2023
14 Nov 2023
4 Nov 2023
Amount
Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS Kallar Chharol through skilled / unskilled manpower i.e pump operator and Helper for maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge..
Description of main components of the scheme is as under:-
Civil works: 1 No pump house, sump well/ Percolation well Rising main: Booster stage 80mm dia=80 rmt, 1st stage 100mm dia=1530 Rmt. Pumping machinery:Booster stage: 2x5=10HP, 1st stage 2x60=120 HP. Distribution system: 96500 Rmt Total storage tank: 4 Nos.Total working hours 32 per day : through , 5 No person. Indicators to be mentioned:Average per day Nos of complaints received thorugh differnt mode such as C.M Sanklap E-Samadhan, complaint register and toll free No. Quantity of water lifted per day: ). Pumping hours per day and energy consumptoin per day Unit.
M/S Anil Kumar
Ravinder Singh Patial
prakash thakur
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .