Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.8 LQualified Make: PROSTARM
Model: MD040 B9 8 AIR INDIA COLONY SAHYADRI CHS SECTOR 27 NEAR WONDERS PARK NAVI MUMBAI THANE MAHARASHTRA 400706 | THANE | MAHARASHTRA | 400706 | Make: PROSTARM
Model: MD040 | L1 | Qualified MII | |
| 2 | L2₹11.8 L+₹3.0 L (33.6%)Qualified Make: PROSTARM
Model: MD040 321 PATIL NAGAR BAWDHAN ROAD BAVDHAN BUDRUK PUNE MAHARASHTRA 411021 | PUNE | MAHARASHTRA | 411021 | Make: PROSTARM
Model: MD040 | L2 | Qualified MII | |
| 3 | L3₹18.3 L+₹9.4 L (106.7%)Qualified Make: Techser
Model: TMP 100KVA 12 1 TECHSER HOUSE JALAHALLI MES RING ROAD SHARADAMBANAGAR BENGALURU BANGALORE KARNATAKA 560013 | BENGALURU URBAN | KARNATAKA | 560013 | Make: Techser
Model: TMP 100KVA | L3 | Qualified MSE, MII, Category: General | |
| 4 | L4₹18.9 L+₹10.0 L (113.8%)Qualified Make: NUMAX
Model: NX6600 50 51 NARAYANASWAMY NAGAR CHERLAPALLY CHERLAPALLY HYDERABAD HYDERABAD TELANGANA 500051 | MEDCHAL MALKAJGIRI | TELANGANA | 500051 | Make: NUMAX
Model: NX6600 | L4 | Qualified MSE, MII, Category: General | |
| 5 | L5₹20.1 L+₹11.3 L (127.6%)Qualified Make: POWER-ONE MICRO SYSTEMS
Model: PMM 100 KVA GF 3 F 12 KSSIDC BUILDING 5TH CROSS 1ST STAGE PEENYA INDUSTRIAL ESTATE BANGALORE | BENGALURU URBAN | KARNATAKA | 560058 | Make: POWER-ONE MICRO SYSTEMS
Model: PMM 100 KVA | L5 | Qualified MII |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
15 Nov 2025, 10:00 amClosed
Online UPS (>10 KVA) With Battery (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller OEM Authorization Certificate
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6750591 Dated : 08-10-2025 Bid Document 1/7
-- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 42 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : Accounts Officer Space Applications Centre
Department of Space
indian space research organization
Department of Space (Accounts Officer)
8427806
GEM/2025/B/6750591
Two Packet Bid
Online UPS (>10 KVA) With Battery (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller OEM Authorization Certificate
112 days
Singh380015Central Stores, Space Applications Centre, Ambawadi Vistar PO
Total value wise evaluation
PRODUCT
4 documents required · 4 mandatory
Exempted
5 Dec 2025
8 Oct 2025
15 Nov 2025
Online UPS (>10 KVA) With Battery (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller OEM Authorization Certificate
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6750591 Dated : 08-10-2025 Bid Document 1/7
-- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 42 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : Accounts Officer Space Applications Centre
Department of Space
indian space research organization
Department of Space (Accounts Officer)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8427806.pdf
GEM_BID
UPS_37a02cdc-aed4-450c-96871759749579982_pso_b.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .